Poem: The Unravelling of a Christian Marriage

Marry the wrong person, everyday is Martyrs Day.
Marry a lazy person, everyday is Labour Day.
Marry a rich person everyday is New Year’s Day.
Marry an immature person, everyday would seem like Children’s Day.
Marry a cheater or liar, everyday will become April Fool’s Day.
And if you don’t get married, everyday is Independence Day!

Marriage is the only school where you get a certificate before you start.
It’s also a school where you will never graduate.
It’s a school without a break or a free period.
It’s a school where no one is allowed to drop out.
It’s a school you will have to attend everyday of your life.
It’s a school where there is no sick leave or holidays.
It’s a school founded by God on the foundation of love.
The walls are made out of trust.
The door made out of acceptance.
The windows made out of understanding
The furniture made out of blessings
The roof made out of faith.

Be reminded that God is the only Principal and you are a student,
Even in times of storms, don’t be unwise and run outside.
Keep in mind that, this school is the safest place to be.
Never go to sleep before completing your assignments for the day.
Never forget  to communicate with your classmate and with the Principal.
If you find out something about your classmate (spouse) that you do not appreciate.
Remember your classmate is also just a student, not a graduate.
God is not finished with him/her yet.
So take it as a challenge and work on it together.
Do not forget to study the Holy Book (the main textbook of this school).
Start each day with a sacred assembly and end it the same way.

Sometimes you will feel like not attending classes, yet you have to.
When tempted to quit find courage and continue.
Some tests and exams may be tough but remember,
the Principal knows how much you can bear and yet it’s a school better than any other.

It’s one of the best schools on earth;
joy, peace and happiness accompany each lesson of the day.

Different subjects are offered in this school, yet love is the major subject.
After all the years of theorising about it, now you have a chance to practice it.

To be loved is a good thing, but to love is the greatest privilege of them all.
Marriage is a place of love, so love your spouse.

Whether you’re married, engaged, or still single, we hope that you have found wisdom and encouragement in this poem about marriage.  

3 Tips for Dealing with a Manipulative Project Co-Worker

Are you stuck working with a project manager who is manipulative and dishonest? If you are, you’re not alone!

Today’s workplace is a cut-throat environment with everyone trying to get ahead in some way, shape, or form. It’s no surprise that there are malicious, sneaky project managers who will do anything to get a leg up to succeed or survive, even if it means throwing you under the bus. Like a clever politician, these project managers keep their desires hidden, but underneath a friendly and charming exterior is a highly destructive individual whose goals are power and control. Pretending to pursue the greater good, he or she adopts the mantra of “company first” with a fervency that inspires admiration and respect, and most people accept his or hers claims of a selfless pursuit of noble causes.

Regardless of your industry, profession, experience level or company, these manipulative people exist and, if given the right opportunity, they can ruin your reputation and career prospects. They’ll tell you that the entire team hates you, thinks you’re arrogant, stupid, or incompetent, and attempt to manipulate you into believing that their opinions are objective facts. A study published in the Journal of Applied Psychology called it “social undermining” and “bottom line mentality.”

“According to a recent survey,  roughly 90% of folks who read this post are presently working with at least one person who, mentally, would be described as a manipulator”.

Proving yourself in a new organization is hard enough. When someone manipulates and lies about you, it can hurt your relationships, your reputation, and your career. Luckily, Project Journal has 3 tips for effectively dealing with this workplace danger.

1. Don’t Ignore Your Gut
I should’ve seen it coming. Unfortunately, there isn’t a clear-cut answer to the question “Friend or foe.” If you find yourself putting up your guard around a co-worker, you might wonder if you’re imagining things and being paranoid? Well, maybe you are, but under no circumstances should you ignore your feeling. From experience, this is often the very first sign of trouble. Weak leaders sometimes resort to emotional deceit as a weapon for getting things done. Try to consider facts objectively. Manipulation is normally felt, rather than heard or seen, so you must listen to your gut.

What makes you mistrust this person?  Do they constantly gossip? If so, be careful as those who gossip to you, will probably be doing the same about you too and like Mom always said, “If you don’t have anything nice to say, don’t say anything at all.” Plus, you don’t want to get caught up in the drama when people find out about this control freak’s gossiping.

Trust that you will be thrown under the bus when “stuff” hits the fan. If you’re still unsure, you should run their behaviour by objective people you trust. As trust is built on the foundations of a good relationship, instead of basing trust on someone’s words, observe their deeds.

2. Dealing with a Bad Apple
There’s a lot to be said for the old saying, “One bad apple can spoil the whole barrel.” Not only is that true for fruit, but it holds a lot of merit in the work environment. Rude behavior is contagious. Toxic manipulative employees have an unhealthy ripple effect that harms co-workers, managers, and subordinates alike. They lack positive personality traits, such as genuine concern for others, a generous and understanding nature, a desire to teach and encourage, a desire to have straightforward dealings with others. They dwell in a very dark place lit only by their own ambition.

“It takes just one malicious employee among the ranks to wreak havoc on your team’s culture.”

Healthy human interactions are not dominated by manipulation. If you feel you can’t trust them, don’t. Manipulators do not communicate openly. Instead, they resort to flattery or play the victim to gain your trust and sympathy. Through artful, indirect and devious methods, they influence and control others and have a fair amount of social support, most likely because no one wants to be on their bad side. But that doesn’t mean their behavior isn’t harmful.

Your priority in this situation must be to protect your professional standing. Begin documenting every instance of destructive behavior and take it to a higher authority. When a co-worker starts manipulating you and ignoring the behavior doesn’t work, distance yourself, if possible and keep all correspondences. When colleagues try to sabotage you, they might tell you lies to cause you to make mistakes. The more you cover yourself, the less you have to worry about. Change your passwords, shut down your computer when you leave your desk, and keep sensitive documents under lock and key. Remember to “choose your words carefully when sending emails so that things you write can’t come back to bite you. Unfortunately, if you lose your cool, you will be in danger of looking undignified.”

“When you know what a man wants you know who he is, and how to move him.”
’- George R.R. Martin, A Storm of Swords

It can be tempting to excuse the antagonistic worker who seems zealous about his job, but clearly, those employees may be undermining the entire workforce. Being direct lets the other person know you’re aware of their manipulative behavior, and in some cases, that may be enough to nip it in the bud.  If you stay out of their world of negativity, you will be a much more difficult target for their manipulation.

3. Counteracting Sabotage
Manipulators are blind to the serious defects in their character, but keenly aware of the slightest weakness or imperfection in others. They are judgmental, suspicious, demanding and calculating, all negative personality characteristics. Even their outward charm is cold and calculated. Before you can deal with the situation, you need to understand the impact.

Is it a small lie with little effect? Is it a big lie that requires damage control or even legal action? Consider how others might view the situation. Although it may be difficult, the best choice might be simply to move on as the people who make it in the long-term are the ones who are honest, hardworking and able to maintain their professionalism.

“According to a recent Wall Street Journal article, workplace sabotage is on the rise in this difficult economy.”

If you choose to directly address the situation. It is critical to use neutral language and tone of voice. Do not stoop to their level, it is important to keep your integrity. Consider having witnesses to your conversation so it’s not your word against theirs.

Your final action can be accepting an apology and moving on, or it can be reporting the lie to a higher authority. In extreme cases, it can be making a formal complaint or hiring an attorney. It’s smart to search for job postings, even when you have no intention to quit. Obviously, you don’t want to let one bad apple lead to your resignation but, if nothing else, knowing you have options can help you feel more empowered and in control of the situation.

Other signs sabotage may be in the works: You don’t receive a promotion or responsibilities you logically should have gotten; cold or averse behavior from management that is (seemingly) out of nowhere; sudden and unexplained alienation by individual co-workers or even entire cliques; or unwarranted and continuous kind behavior from someone that was formerly aloof, ambivalent or even aggressive.

Manipulative behavior is widespread, but fortunately, it doesn’t exist everywhere. Do you have manipulative co-workers? How do you dodge their requests and still manage to pave a successful career path?  Tell us what you think?

Love this article? Share it with your friends on Facebook

Politics and Project Management, a Lesson in Leadership

We all know that the more power you have, the better you are able to get the job completed. The problem is most project managers have lots of responsibility, but hardly any authority and since most projects exist outside core business structures, they are forced to develop other methods of influence.

One unspoken evil that is often ignored on project management training courses is the politics of project management. While most of us view politics with disgust; there is no refuting that effective project managers are often seen as those who are equipped and able to employ fitting political strategies to further their project goals. 

“In a Perfect World the Best Workers Would Be Promoted on Merit Alone and the Best Ideas Would Be Adopted Regardless of Personal Interest – but We Do Not Live in Utopia”

Have you ever included ‘office politics’ as a risk on your risk register? Probably not. Though, consider the potential implications of ignoring the ugly stepchild of project management?

“The Objective of Office Politics Is to Manipulate a Situation in Order to Achieve an Outcome That Will Benefit One Individual or Group at the Expense of Other Individuals or Groups.”

While it is unlikely that ‘office politics’ would be listed directly as a risk on your risk register, it is quite likely that one or more of the outcomes of it would. As a result, if you want to survive and prosper in the real world you need to combine good work with smart politics to ensure your own success and that of your projects. The biggest mistake a project manager can make is to assume that politics in project management doesn’t exist. After all, politics is human nature and has played an integral part in history since the dawn of civilization.

In a group where working interactions are fraught with tension and individuals have their own personal agendas or want to be “top dog” personal conflicts will often get in the way of the project aims. Issues between members of the team become the over-riding concern both for the individuals afraid and sometimes even the project manager. Meetings can consist of jostling for power or simply trying to justify your position and when that happens progress on the project will undoubtedly suffer.

For most project managers, playing politics is a form of slow, soul-destroying torture where logic, self-control, transparency and trustworthiness are replaced by deception, concealment, and sabotage. However, ignoring the external and internal politics surrounding your project or organization is dangerous. Successful project managers need to understand organizational politics and how to make them work for project success.

In the case of project politics you can use these key techniques in a constructive manner:

Carefully Manage Your Own Conduct

  1. The first rule is to at all times act in a way that commands respect and beyond that, respect others. That means not gossiping, spreading rumors or getting sucked into interpersonal conflicts and arguments. Maintain your honesty!
  2. Be positive as a positive outlook is a choice that you can always make and remain professional. 
  3. Be confident and firm but not hostile and make sure you take organizational perspectives, not a personal one when voicing objections or giving criticism.
  4. Always assume things will be disclosed, so don’t rely on confidentiality.
  5. Over time you will learn what works in your organization’s culture and what doesn’t. Try to watch other people and identify successful behaviors that you can model to navigate the political minefield.

Review the Organization Chart

  1. Sit back and watch for a while. Identify the real influencers, those who are respected, champions, those who have authority but don’t use it, the mentors and last but not least the true brains behind the organization. Then re-map the organization chart in terms of political influence as politics will often bypass the formal organization chart.

Understand the Social Network

  1. Once you know who’s who in the organization, you have to understand the social networks. This involves identifying who gets along with whom, groups or cliques that have formed and ongoing interpersonal conflicts. Over time you will learn who has the most trouble getting along with others and the basis for the interrelationship whether it be friendship, respect or manipulation, including how the influence flows between all parties.

Build Good Relationships

  1. Now you need to build multiple networks but avoid aligning yourself with one group or another this way you can keep your finger on the pulse of the organization.
  2. Don’t be afraid of politically powerful people and instead, develop relationships that cross the formal hierarchy in all directions.
  3. Build your relationships on trust and respect and avoid empty flattery.

Use Your Social Network

  1. You will need to learn to use your social network to stay clear of negative politics. You can do this through positive political action.
  2. Use your network to gain access to information, build visibility of your achievements and improve difficult relationships.
  3. Attract opportunities where you can shine and seek out ways to make yourself, your team and your boss look good.

Counteract Negative Play

“The Expression, Keep Your Friends Close and Your Enemies Closer” Couldn’t Be Any Truer When It Comes to Office Politics.”

  1. Your mapping of the organization will help you to identify those people who use others for their own political purposes, and not for the common good. Know that these people typically have low self-worth (that’s why they rely on destructive politicking to get ahead). Always be very careful what you say to them.  Understand what motivates them, their goals, and how to avoid or counter the impact of their politics
  2. Remember loyalty is not a reliable factor in the workplace!

“It is easy to become a target if you’re ambitious or if you strive for change. One of the biggest mistakes we make in our career is to assume that everyone likes progress. This is not true’Å —’Å many are content with the status quo and will defend it with their life.”

Projects are rarely easy and office politics can compound other sorts of problems that arise so they need to be dealt with swiftly and firmly. 

The Wyndham Road Project, Southwark

Britain’s first demountable multistorey housing development

A portable, demountable or transportable building is one of the many pre-fabricated house types which can be put to good use when planning constraints will only allow short-term development. Modules and components can be taken apart and transported to a new location. Even elements such as foundations can be easily removed using demountable technologies.  In Australia the word “demountable” in particular refers to portable classrooms.

Prefab Housing Has Been Heralded as the Future of Building and the Solution to Resolve Housing Shortages in the Uk.

The Wyndham Road Project

Client: Hyde Housing Association

Architect: PCKO

Principal Supplier: BUMA

The Wyndham Road project, incorporating 18 flats for key workers, was completed in summer 2005, designed as part of RAPID (Response to Accommodation Pressures through Innovative Design), Hyde’s response to the Government’s initiative to increase the supply of new housing through use of innovative technology.

This Scheme on Wyndham Road, South-east London, Was the Second Buma-built Project in the Uk.

The scheme comprised one and two-bedroom flats, built around three independent staircases, designed to modern, high-quality standards. Demountable construction is designed to accommodate any future changes to the urban fabric, therefore addressing the issue of urban sustainability and required flexibility. Demountability was built in right through to the foundations with the use of screw piles to hold up the structure.

The development could then  be dismantled in 9-10 days and erected on an alternative site, remodelled or recycled, as required. Elevations finished with lightweight metal cladding and insulated render incorporate full-height glazing and feature sliding shutters of galvanised steel and timber, painted in vivid colours, giving the building a unique identity. The building was  designed as 3-storey but could have been  extended to 4-storey by adding additional volumetric components.

If You Want to Make Enemies, Try to Change Something: 17 Inspiring Change Quotes to Live By

"God supplies everything you need for successful change, and when you make changes with his help, it says changed." - Unknown
If you want to make enemies, try to change something.  Change, no matter what scale it is on, can be a source of stress and anxiety for many. However, it’s common for change management practitioners to view resistance to change as an irrational barrier to progress. Another school of thought is that resistance to change is a social process that can strengthen changes and help to eliminate undesirable change.
The fact remains that change is necessary in all organizations. But, it is the way change is initiated which can so greatly vary. It can be forced upon companies by outside forces or just come from a realization that the company may be falling behind the times. In this way, change management might be quite beneficial to an organization. Organizations that have learned how to transform themselves through effective leadership and strategic control are more likely to survive and prosper. The dilemma is that most people hate change and love it at the same time and what they really want is for things to remain the same but get better.
The good news is that God has a plan for your life to prosper.    If we trust in God and allow the change to grow us to become more like Jesus Christ in how we respond and act, then we are promised that all things will work together for good for those who love Him and keep His commandments!
The following thought-provoking quotes relate to change management including resistance to change, acceptance and change strategy.
  1. “One of the reasons so many celebrities keep going in and out of rehab is that they leave out the critical element to lasting change: God.” – Unknown
  2. “There is nothing more difficult to take in hand, more perilous to conduct, or more uncertain in its success than to take the lead in the introduction of a new order of things.” — Niccolo Machiavelli
  3. “Change has its enemies.” — Robert Kennedy
  4. “He who rejects change is the architect of decay.” — Harold Wilson
  5. “Change is not made without inconvenience, even from worse to better.” — Samuel Johnson
  6. “The world hates change, yet it is the only thing that has brought progress.” — Charles Kettering
  7. “God supplies everything you need for successful change, and when you make changes with his help, it says changed.” – Unknown
  8. “It is always easier to talk about change than to make it.” — Alvin Toffler
  9. “It must be considered that there is nothing more difficult to carry out nor more doubtful of success nor more dangerous to handle than to initiate a new order of things.” — Machiavelli
  10. “The path of least resistance is the path of the loser.” — H. G. Wells
  11. “When you feel weak in the face of change, God is omnipotent, or all-powerful. “If God is for us, who can be against us?” the Bible says. (Romans 8:31, NIV) Knowing the invincible God is on your side gives you tremendous confidence.” – Unknown
  12. “Paralyze resistance with persistence.” — Woody Hayes
  13. “Culture does not change because we desire to change it. Culture changes when the organization is transformed – the culture reflects the realities of people working together every day.” — Frances Hesselbein
  14. “The greatest danger in times of turbulence is not the turbulence – it is to act with yesterday’s logic – Peter Drucker
  15. “The rate of change is not going to slow down anytime soon. If anything, competition in most industries will probably speed up even more in the next few decades.” — John P. Kotter
  16. “Your success in life isn’t based on your ability to simply change. It is based on your ability to change faster than your competition, customers, and business.” — Mark Sanborn
  17. “If you want to make enemies, try to change something.” — Woodrow Wilson

Don’t make change harder than it has to be. Do it the right way. Ask God for help.

Willow Creek Interviews Jack Welch, Former GE CEO

“Face reality as it is, not as it was or as you wish it to be." ’• Jack Welch

Jack Welch, the salty former CEO of GE, sat down for an interview with Bill Hybels, senior pastor of Willow Creek Community Church, for the 2010 Leadership Summit and served up more truth and wisdom in 30 minutes than most seminary classes give over a semester.

Known for his own brutal candor, Welch emphasized authenticity and candor in leaders.

“You’ve got to be yourself. You’ve got to be comfortable in your shoes,” he said. “You’ve got to not portray yourself as something other than what you are. People can see through a phony in a minute.” and “Nothing is worse than negative energy,” Welch stressed.

Meanwhile, the top 20 percent are those who are filled with energy and likable, who love to reward and celebrate their people, aren’t mean-spirited or cheap and aren’t afraid to have great people around them, he said.

The mean-spirited hide the good people. But the top workers don’t have a lot of envy.

“Envy’s a terrible thing,” he pointed out.  

Jack Welch impact on society has been no doubt been tremendous, but good deeds and riches do not grant you automatic access to the Kingdom of God.

“Before you are a leader, success is all about growing yourself. When you become a leader, success is all about growing others.”

In another interview with Dan Rather on the CBS program 60 Minutes, Jack Welch, the former CEO of General Electric, said that the most difficult question he was ever asked was, “Do you think you will go to heaven when you die?”

“Welch replied and said had been a really good person, had done a lot  of good things for others in his most influential years in the business world.”

Whilst Welch isn’t a Christian, he has now started attending First Presbyterian Church for the past several months after he was hospitalized for 104 days for a spinal infection called discitis.

When asked if the health scare opened him up to things of God, he said, “Maybe.”

 

29 of the Best Ministry Interview Questions

 

Need help figuring out what to ask candidates during the interview?

You  can bet that  most candidates are well-versed in how to answer standard interview questions like, “What’s your greatest  strength? Weakness?” or “Why should I hire you?” or even “Where do you see yourself in five years?”

Because questions like these are so often used to gauge a candidates potential to perform well in a particular sector, answers are usually very scripted, insincere, and most cases tailored to what you’re looking for in a candidate. And, unfortunately, that doesn’t tell you a whole lot.

The best candidates are like axles: If you want to route out the good candidates from the mediocre ones, you’ll need to  spark a more authentic and revealing discussion.

How?  the answer is simple, ask better questions!

  1. “Why are you here?”
  2. “What’s your definition of hard work?”
  3. “Tell me a little bit about your career path, how did you move into this field?”
  4. “How do you take advantage of your strengths? How do you compensate for your weaknesses?”
  5. “What’s the one accomplishment you’re most proud of? Why?”
  6. “Describe one of your most challenging jobs? Why was it challenging and how did you pull the job through it?”
  7. “Tell me about the kinds of performance metrics you use to see if the job is on track?”
  8. “Tell me about a time when you encountered a serious conflict and how you dealt with it.”
  9. “How do you handle a situation where the client does not want to surface and address Risk?”
  10. “How do you make decisions?”
  11. “How do you deal with client employees with low motivation or low skills?”
  12. “What is motivating your job search?”
  13. “What qualities in your co-workers bother you most? Do you appreciate most?”
  14. “If I were to ask your current boss what your greatest strength is, what would he or she tell me?”
  15. “What types of  jobs don’t  you want to work on?”
  16. “Tell me about a work incident in which you were totally honest, despite a potential risk or downside?”
  17. “What will make you love coming to work here every day?
  18. “If you were limited to just one person to get advice and help from, which person would you choose? Why?”
  19. “What’s your greatest fear about this opportunity?”
  20. “Tell me about a time you screwed up?”
  21. “Was there a time you thought the program was going “too fast?” What happened?”
  22. “Describe a time when you were asked to do something you weren’t trained to do. How did you handle it?”
  23. “What would you do if management made a decision you didn’t agree with?”
  24. “What changes have you made in working with others to be more effective at work?”
  25. “If you had only one word to describe yourself, what would it be?”
  26. “What is there about this opportunity that most excites you?”
  27. “Describe the boss who would get the very best work from you?”
  28. “What can you tell me about this job that isn’t in the description?”
  29. “Is there any question I haven’t asked you that I should?”

What do you think are the most revealing interview questions to ask job candidates? Share in the comments!

Has Nigeria Become the World’s Junk Yard of Abandoned and Failed Mega Projects worth Billions?

Dim1, N. U., Okorocha2, K. A., & Okoduwa3 V. O.

The Nigerian construction industry is mostly concerned with the development and provision of projects such as roads, bridges, railways, residential  and commercial real estates, and the  maintenance necessary for the socio-economic developments contributes immensely to the Nigerian economic growth (Bureau of Statistics, 2015). Butcher and demmers (2003) described projects as an idea which begins and ends by filling a need. However, a project fails when its idea ends without meeting the needs and expectations of its stakeholders.

Nigeria Has Become the World’s Junk – Yard of Abandoned and Failed Projects worth Billions of Naira!

Hanachor (2013), revealed that projects form part of the basis for assessing a country’s development. However,  a damming  report from the Abandoned Projects Audit Commission which was set up by the Ex-President Goodluck Jonathan in 2011 revealed that 11,886 federal government projects were abandoned in the past 40 years across Nigerian  (Abimbola, 2012). This confirmed the assertion by Osemenan (1987) “that Nigeria has become the world’s junk –yard of abandoned and failed projects worth billions of naira”.

Abandoned projects including building and other civil engineering infrastructure development projects now litter  the  whole of Nigeria.

Physical projects do not only provide the means of making life more meaningful for members of the community where the projects are located, successful  projects also  result in  empowerment and collective action towards self improvement (Hanachor, 2013).  

This Issue of Abandonment Has Been Left Without Adequate Attention for Too Long, and Is Now Having a Multiplier Effect on the Construction Industry in Particular and the Nigeria’s National Economy as a Whole. (Kotngora, 1993)

PROJECT FAILURE

Project Failure might mean a different thing to different stakeholders. A project that seemed successful to one stakeholder may be a total failure to another (Toor and Ogunlana, 2008). Some stakeholders, more especially the project users and some private owners, think of failed projects as a situation where a completed building project collapsed, a situation where by a completed dam project stopped working after few days of completion, or a completed road project that broke down after few months of completion. Other experienced stakeholders, such as engineers  and  architects  conform to the iron triangle by Atkinson (1999) which states that the most strategically important measures of project failure are “time overrun”, “cost overrun”, and “poor quality”.

Turner (1993) noted that a project fails when the project specifications are not delivered within budget and on time;   the project fails to achieve its stated business purpose; the project did not meet the pre-stated objectives; the project fails to satisfy the needs of the project team and supporters; and the project fails to satisfy the need of the users and other stakeholders. Lim and Mohamed (1999) cited in Toor and Ogunlana (2009) clarified that there are two possible view points to project failure namely; the macro-level and the micro-level. They further explained that the macro view point reviews  if the original objectives and concepts of the project was met. Usually the end users and the project beneficiaries are the ones looking at the project failure from the macro view point, where as the project design team, the consultants, contractors, and suppliers review projects from a micro view point focusing on  time of delivery, budget, and poor quality.  

In the early 1990s, the failure as well as the success of any project was determined by the project duration, monetary cost, and the performance of the project (Idrus, Sodangi, and Husin, 2011). Belout and Gauvrean (2004), also confirmed that the project management triangle based on schedule, cost, and technical performance is the most useful in determining the failure of a project. Moreover, a project is considered as an achievement of specific objectives, which involves series of activities and tasks which consume resources, are completed within specifications, and have a definite start and end time (Muns and Bjeirmi 1996, cited in Toor and Ogunlana, 2009). Reiss (1993) in his suggestion stated that a project is a human activity that achieves a clear objective against a time scale. Wright (1997) taking the view of clients, suggested that time and budget are the only two important parameters of a project which determines if a project is successful or failed. Nevertheless, many other writers such as Turner, Morris and Hough, wateridge, dewit, McCoy, Pinto and Slevin, saarinen and Ballantine all cited in Atkinson (1999), agreed that cost, time, and quality are all success as well as failure criteria of a project, and are not to be used   exclusively.

FACTORS OF PROJECT FAILURE

Cookie-Davies (2002) stated the difference between the success criteria and the failure factors. He   stated that failure factors are those which contributed towards the failure of a project while success criteria are the measures by which the failure of a project will be judged. The factors constituting the failure criteria are commonly referred to as the key performance indicators (KPIs).  

Time   and Cost Overrun

The time factor of project failure cannot be discussed without mentioning cost. This is because the time spent on construction projects has a cost attached to it. Al-Khali and Al-Ghafly, (1999); Aibinu and Jagboro, (2002) confirmed that time overrun in construction projects do not only result in cost overrun and poor quality but also result in greater disputes, abandonment and protracted litigation by the project parties. Therefore, focus on reducing the Time overrun helps to reduce resource spent on heavy litigation processes in the construction industry (Phua and Rowlinson, 2003). Most times, the time overrun of a project does not allow resultant system and benefits of the project to be taking into consideration (Atkinson, 1999). Once a project exceeds the contract time, it does not matter anymore if the project was finally abandoned or completed at the same cost and quality specified on the original contract document, the project has failed. Furthermore, Assaf and Al-Hejji, (2006) noted that time overrun means loss of owner’s revenue due to unavailability of the commercial facilities on time, and contractors may also suffers from higher over heads, material and labour costs.

Poor quality/Technical Performance

The word “Performance” has a different meaning which depends on the context it is being used and it  can also be referred to as quality. Performance can be generally defined as effectiveness (doing the right thing), and efficiency (doing it right) (Idrus and Sodangi, 2010). Based on this definition of performance, at the project level, it simply means that a completed project  meets fulfilled the stakeholder  requirements in the business case.

CAUSES OF PROJECT FAILURE

A lot of research studies have investigated the reasons for project failures, and why projects continue to be described as failing despite improved  management. Odeh and Baltaineh, 2002; Arain and   Law, 2003; Abdul-Rahman et al., 2006; Sambasivan and Soon, 2007; all cited in Toor and Ogunlana, 2008, pointed out the major causes of project failures as Inadequate procurement method; poor funding and availability of resources; descripancies between design and construction; lack of project management practices; and communication lapses

The contract/procurement method

A result obtained from two construction projects which were done by the same  contractor but using different procurement methods showed that rework, on the design part which occurs when the activities and materials order are different from those specified on the original contract document, makes it difficult for the project to finish on the expected time (Idrus, Sodangi, and Husin, 2011). This is as a result of non-collaboration and integration between the design team, contractor, and tier suppliers. The rework on the design portion has a huge impact on  project failure leading to the time overrun.  The traditional method of procurement has inadequate  flexibility  required  to facilitate late changes to  the project design once the design phase of the construction project has been concluded.

Nigerian most widely used procurement method is the traditional method of procurement (design-bid-construct) which has been confirmed to be less effective to successfully delivery of a construction project (Dim and Ezeabasili, 2015). And, the world bank country procurement assessment report (2000) cited in Anigbogu and Shwarka, (2011) reported that about 50% of projects in Nigeria are dead even before they commence because they were designed to fail.

The way the construction projects are contracted, in addition to the way the contracts are delivered, contributes to the causes of projects failure. Particularly, among the methods of project contracting is lump-sum or a fixed-price contracting method, in which the contractor agrees to deliver a construction project at a fixed price. The fixed-price contract can be low-bid or not however, once the contract cost has been agreed upon the contract award, it cannot be changed. And, contractors are expected to honor and deliver the contract agreement, failure to do so can result  in a  breach of contract which can result in the contractor being  prosecuted.  

Awarding a contract to an unqualified personnel also contributes to project failures. When a contractor places more emphasis on money and the mobilization fee after a construction project has been initiated instead of getting the right workforce and skilled professionals that will execute the project. Instead the workforce chosen will often not be base on competence and required skills rather it will be based on availability. Moreover, poor strategy and planning by contractors who have overloaded with work  also contributed to one of the causes of project failure.

Poor funding/Budget Planning

A lot of public projects in the Nigerian construction industry failed as a result inadequate funding, and the difference between the national annual budget and the budget actual released. Most of the Nigerian public projects are signed  even before the actual release of the national budget. The difference in budget of the contracted project and the actual budget release can get the contracted company stuck as a result of inflation of prices, scarcity of construction material at the time of the budget release and mobilization to site. Also  un-planned scope of work which can be as a result of the contractor working on another contract when he is called back  to  mobilization to start work. Moreover, poor budget planning is a regular mistake made by some contractors by not undertaking feasibility assessments  before starting the design. The construction project should be planned according to the available resources and not according to the unrealistic expectations a  client has in mind.

Discrepancies  Between the Design and Construction

Limited  collaboration between the contractors, engineers, and the architect results in discrepancies between the project designs and construction on site, and further leads to rework. Changes on a project designs, and changing to the scope of work in the middle of construction processes on site can be dangerous, and can lead to time overrun, increase in cost, and most of all can lead to abandonment. Moreover, many cases have been seen where the designs from the architects are not buildable  on site, while   In some cases, most contractors are unable to adequately specify the scope of work for the construction processes on site. Therefore any default on the design by the architect can be an opportunity for the contractor to make more money which might cause the project duration to exceed the time specified on the contract document.

RESEARCH METHODOLOGY

This research starts with a general reasoning or theory which says that the major cases of project failure in the Nigerian construction industry are defined based on time overrun and cost overrun. The findings from the data analysis will help on the decision to accept the theory or not. The research data was collected from the progress report for the month ending of October, 2015 published by the Nigeria of Federal Ministry of works on thirty-nine on-going highway construction projects at the South-South geopolitical zone. The table 1 below shows the information on the data collected which comprises of the project title, contract Number, project description, the contractor that was awarded the projects, the date of project commencement, date of completion and the extended date if any. The scheduled time for each project was specified as follows: project commencement date labeled as “a”,   project completion date labeled as “b”, and the extended date labeled as “c”.

Table 1: The analyzed data on the highway project at the South-South zone in Nigeria.
Table 1: The analyzed data on the highway project at the South-South zone in Nigeria.

image2

image3

image4

image5

image6

image7

image8

DATA ANALYSIS

The data analysis was done with the use of Microsoft excel. The analysis started by obtaining the number of days between the date of commencement of each project and the date of completion to show the duration of each highway project. And, the number of days between the project completion date and the extension date showed the time-overrun. The project duration and the extended days were obtained with the use of NETWORKDAYS function in Microsoft Excel which calculates the number of working days between two dates excluding weekends and any dates identified as holidays.

The standard deviation between the specified project duration for each highway projects and the extended days was calculated to obtain the extent to which each highway project contract failed on its time of delivery. This was denoted as the degree of failure. The table 1 above showed the projects ranking which was done based on the degree of failure of all the highway projects. The highway projects that were ranked from one to sixteen have low degree of failure and are represented with green color, while the rest are those with high degree of failure and are represented with red color.

FINDINGS

The findings made showed that the successfully completed highway projects have no extended days or time overrun, and the successful on-going highway projects are still on schedule and have no extended days unlike the on-going highway projects that have already failed as a result of the extended dates. Other projects have been abandoned because they have exceeded the delivery date as specified on the contract document, and have no extended date of completion. Thus, no work is going on.

Figure 1: Abundance of failed highway projects at south-south zone, Nigeria.
Figure 1: Abundance of failed highway projects at south-south zone, Nigeria.
Figure 2: On-going failed highway projects
Figure 2: On-going failed highway projects

Figure 2 above showed that 14% of highway projects are still on-going projects because they have not exceeded the original date of completion as specified on the contract document. However, they are heading towards failure because they have been given an extended date of completion which can be as a result of some critical activities running behind schedule, causing delay on the critical path network of the projects. Moreover, the other 86% completely failed because they have exceeded their completion date specified on the contract document.

Figure 3: Successful on-going highway projects
Figure 3: Successful on-going highway projects

The figure 3 above showed that 63% of the successful highway projects are still on-going because they have not exceed their completion dates, and they are not yet completed. However, those on-going highway projects might end up as failed projects as a result of poor funding, discrepancy between the design and the construction on site, and conflict between the construction parties or stakeholders.

“Say what you will do, and do what you said” or “Say as you will do it, and do it as you said”

CONCLUSION AND RECOMMENDATION

The idea of knowing what a failed project is, the factors and the causes is very important in project management. Success in project management can neither be achieved nor measured without the knowledge of project failure, its factors, and causes in the Nigerian construction industries. This work has shown that project failure is as a result of exceeded time of delivery, cost overrun, and poor quality. However, the analysis was only done based on exceeded time of project delivery because of the nature of the data collected.

This work suggested a few approaches to help reduce the number of failed projects in the Nigerian construction industry if properly implemented. Firstly, Having good collaboration between the project stakeholders involved in a construction project at the early stage of project conception is most important in order to accomplish the project objectives, and deliver the project on time, within budget, and quality specified on the original contract document (Othman, 2006).

Secondly, Adopting the ISO 9000 technique which is used for quality management will also help in achieving a successful project delivery. This technique states “ say what you will do, and do what you said” or “say as you will do it, and do it as you said”. This technique is not an indication of high quality but it promotes control and consistency which leads to specialization, and improved productivity and quality. Also, adopting the principles of lean construction will help to reduce waste within the construction and stream-line activities in order to improve the on-time delivery of projects.

Thirdly, Learning from the precedent failed projects, how those projects failed, and the reason for their failures. This will help the project manager  to plan and mitigate the risks of project failures in the future. And, finally, more seminars and workshops will help to educate and enlighten clients (the federal government representatives), users, contractors, engineers, and architects on what is project failure, the factors that contributes to abundant failed projects, and their causes.

REFERENCE

Abimbola, A. (Novermber 24, 2012). About 12,000 Federal Projects Abandoned across Nigeria. Premium times (November 16, 2015). Retrieved from www. Premium timesng.com/news/108450-about-12000-federal-projects-abandoned-across-nigeria.html.

Al-Khali, M.I and Al-Ghafly, M.A. (1999). Important Causes of Delays in Public Utility Projects in Saudi Arabia. Construction management and Economics, 17, 647-655

Aibinu, A.A and Jagboro, G.O. (2002). The Effects of Construction Delays on Project Delivery in Nigeria Construction Industry. International journal of Project management, 20(8), 593- 599.

Anigbogu, N. and Shwarka, M. (2011). Evaluation of Impact of the Public Procurement Reform Program on Combating Corruption Practices in Public Building Project Delivery in Nigeria. Environtech Journal, 1(2). 43-51.

Assaf, S. and Al-Hajji, S. (2006). Causes of Delays in large Construction Projects. International Journal of Project Management, 24, 349-357.

Atkinson , R. (1999). Project management: Cost, time, and quality, two best guesses and a Phenomenon, it’s time to accept other success criteria. International Journal of project Management, 17(6), 337-342.

Belout, A and Gauvrean, C. (2004). Factors Influencing the Project Success: The impact of human resource management. International Journal of project Management, 22, Pp. 1-11.

Butcher, N. and Demmers, L. (2003). Cost Estiumating Simplified. Retrieved from www.librisdesign.org.

Cookie-Davies, T. (2002). The Real Success Factors on Projects. International Journal of Project management, 20(3), 185-190.

Dim, N.U. and Ezeabasili, A.C.C (2015). Strategic Supply Chain Framework as an Effective Approach to Procurement of Public Construction Projects in Nigeria. International Journal of Management and Susutainability, 4(7), 163-172.

Hanachor, M. E. (2012). Community Development Projects Abandonment in Nigeria: Causes and Effects. Journal of Education and Practice, 3(6), 33-36.

Idrus, A., Sodangi, M., and Husin, M., H. (2011). Prioritizing project performance criteria within client perspective. Research Journal of Applied Science, Engineering and Technology, 3(10), 1142-1151.

Idrus, A. and Sodangi, M. (2010). Framework for evaluating quality performance of contractors in Nigeria. International Journal of Civil Environment and Engineering. 10(1), 34-39.

National Bureau of Statistics (January, 2015). Nigerian Construction Sector Summary Report: 2010-2012.

Kotangora, O. O. (1993). Project abandonment, Nigerian Tribune.

Osemenan, I. (1987). Project Abandonment. New Watch Magazine, Vol. 1, pp. 15.

Othman, M.,R. (2006). Forging main and sub-contractor relationship for successful projects. Retrieved from http://rakanl.jkr.gov.my/csfj/editor/files/file/projek/lessonslearned/MAIN&SUB_2.pdf

Phua, F.T.T and Rowlinson, S. (2003). Cultural Differences as an Explanatory Variable for Adversarial Attitude in the Construction Industry: The case of HongKong. Construction Management and Economics, 21, 777-785.

Reiss, B. (1993). Project Management Demystified. London: E and FN Spon Publishers.

Toor, S. R. and Ogunlana, S. O. (2008).Problems causing Delay in Major Construction Projects in Thailand. Construction management and Economics, 26, 395-408.

Toor, S. R. and Ogunlana, S. O. (2008). Critical COMs of Success in Large-Scale Construction Projects: Evidence from Thailand constructuction industry. International Journal of Project management, 26(4), 420-430.

Toor, S. R. and Ogunlana, S. O. (2009).Beyound the “Iron Triangle”: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. International Journal of Project management, doi: 10.1016/j.ijproman.2009.05.005.

Toor, R. and Ogunlana, S. (2009). Construction Innovation: Information, process, management. 9(2), PP. 149-167.

Turner, J. R. (1993). The Handbook of project-Based Management: Improving the process for achieving strategic objective. London, McGraw-Hill.

Wright, J., N. (1997). Time and Budget: The twin imperatives of a project Sponsor. International Journal of Project Management, 15(3), 181-186.

10 Proposed Infrastructure Projects for London to Retain Its World Class Status

London hasen’t reached the density of Hong Kong, but it’s certainly heading that way as the cities population continues to expand. The “London Infrastructure Plan 2050″ aims  to tackle the problem and outlines the spending needed for the capital to remain one of the world’s leading cities.

London Mayor  Boris Johnson Has Said £1.3tn of Investment Is Needed over the next 35 Years in Order for London to Retain Its World Class Status

“This plan is a real wake up call to the stark needs that face London over the next half century. Infrastructure underpins everything we do and we all use it every day. Without a long-term plan for investment and the political will to implement it this city will falter.”

London School of Economics Professor Tony Travers Said: “the London Infrastructure Plan Is a Necessary Step Towards Understanding the Needs of the ‘10 Million City’ Which London Will Soon Become.

Transport is the biggest focus of the  “London Infrastructure Plan 2050” as the  population hit 8.5 million in 2014 the largest it has been since 1939. By 2050 it is predicted to  exceed 11 million, growing at a rate of 41,000 a year.

Some infrastructure project proposals  are already in development, others may not be approved at all, however, these  are some transport developments suggested for London by 2050.

1. Air con on the Tube,   £900m

It was find  in the beginning, in fact, conditions were so pleasant in 1906 that the city  proclaimed the underground ‘The coolest place in hot weather’. But that was before deep lines and millions of passengers.

Better Late than Never, London’s Tube Is Getting Air-con

In summer, temperatures on parts of the London Underground can become very uncomfortable due to its deep and poorly ventilated tube tunnels: temperatures as high as  116   °F were reported in the 2006 heat wave. New Tube trains, which allow better access for customers, are being rolled out on the Circle line as part of the introduction of 53 new trains on both the Hammersmith & City and Circle lines.  By the end of 2016 there will be a total of 191 walk-through, air-conditioned trains covering  40% of the Tube network running on the District,Circle, Metropolitan and  Hammersmith & City lines.

2.  Inner orbital tolled tunnel,   £15bn-25bn

Mayor sets out plan for 22-mile ring-road tunnel under London, which is considered by many to be one of the most ambitious infrastructure scheme ever proposed in the city.

The tunnel  will cost an estimated   £30 billion to construct and will remove tens of thousands of cars from the crowded streets of London and  avert traffic gridlock. With subterranean dual carriageways linking key routes, from the A40 Westway to the A12 in the east, and the A1 route north to the A2 running south.

London Major Boris Johnson, who commissioned work to develop the idea, believes it could dramatically improve quality of life for residents. He said: “I would love the views of Evening Standard readers on this. There are big arguments in favour.   There are obviously arguments against.”

Transport for London is working on the concept.

3.  Northern Line extension, £1bn

Works commenced  on London Underground’s £1bn Northern Line extensionfrom Kennington to Battersea via Nine Elms in the UK in 2015.

Tunnelling work is scheduled to start in early 2017 and will take six months to complete, while the project is expected to be completed in 2020.

The project will reduce journey times to the West End and the city to less than 15min.

4.  Cycle Super Highways,   £2bn- £4bn

London’s New Superhighway Linking East and West London Will Open on 30 April, Says the Capital’s Mayor Boris Johnson

The route, which links Barking, Canary Wharf and Tower Hill to Westminster, will open less than a week before his term is set to end.

Chris Boardman, the former Olympic champion and  policy advisor to British Cycling, said: “This YouGov poll shows us, yet again, that the vast majority of the public want to see more cycle tracks on main roads.

“If this kind of evidence isn’t enough to give politicians and transport authorities the confidence to act, I don’t know what is.”

Last month, Boris Johnson pressed ahead with plans for three cycle superhighways.

5.  Bakerloo and Overground extensions,   £2.5bn-3.5bn

The extension of the Bakerloo line could help regenerate South East London from Old Kent Road to Catford, improve routes into London and relieve congestion on the main rail services into London Bridge.

6. Crossrail 2  and 3,   £23bn- £30bn

TRANSPORT chiefs say it is “full steam ahead” for Crossrail 2 after the Government made an £80million pledge towards the project – but it will be months before passengers find out if a station will be built at Balham or Tooting.

Construction work is due to begin on the rail link in the early 2020s, which would enable the service to be operational by 2033.

7. New Stations, £500m and  24/7 Night Tube service

New stations at Cricklewood, Beam Park in Rainham and Thames Wharf could be built to support redevelopment in these areas.  It has also been claimed that night services on the Piccadilly, Central, and Northern Lines are then due to start in September, with all major lines being served by the weekend night tube by September 23.

8. Another channel tunnel,   £1bn

The “London Infrastructure Plan 2050″ suggests an additional cross-channel rail tunnel would provide high speed links from the UK to the rest of Europe for passengers and freight.

9. 13 new crossings in London,   £1-2bn

The  vision for east London includes 13  proposed new river crossings include  Gallions-Thamesmead, Belvedere-Rainham, Woolwich- Royal Docks to replace the Woolwich Ferry, as well as the Silvertown tunnel.

Boris Johnson states “By creating more links between the north and south of the river, we won’t just improve day-to-day travelling across the capital, we’ll unlock areas for development and create thousands of jobs and homes.

  • Rotherhithe to Canary Wharf: Pedestrian and cycle bridge (feasibility).
  • North Greenwich to the Isle of Dogs: a passenger ferry linking North Greenwich and the Isle of Dogs (Blackwall) (conceptual).
  • Silvertown tunnel: Twin bore tunnel connecting Silvertown on the north side to the Blackwall Tunnel Approach on the south side (preparation).
  • Charlton: a passenger ferry crossing linking the Royal Docks and Charlton Riverside (conceptual).
  • Crossrail: New rail line linking Woolwich with Custom House and onward to Canary Wharf, central London and Heathrow Airport (construction).
  • Gallions Reach: Multi-modal crossing linking Thamesmead with Beckton along a safeguarded alignment (consultation).
  • Belvedere: Multi-modal crossing connecting Belvedere with Rainham (consultation)
  • Barking Riverside to Thamesmead: London Overground tunnel extension from Barking Riverside to Thamesmead (conceptual).
  • Lower Thames Crossing: New road crossing linking Essex and Kent (progressing).
  • Diamond Jubilee: Pedestrian and cycle bridge linking Fulham with Battersea (planning permission granted).
  • Crossrail 2: New railway line connecting Hertfordshire and Surrey via central London and providing a new cross river link between Victoria and Clapham Junction (consultation).
  • Vauxhall, Nine Elms and Battersea: Pedestrian and cycle bridge (feasibility).
  • Garden Bridge: New pedestrian crossing linking the South Bank to Temple station (planning permission granted).

10. Thames Estuary airport,  18bn-25bn

A new Thames Estuary Airport has been proposed at various times since the 1940s. Economic considerations have ruled out a new coastal airport, while political considerations have ruled out a new inland airport,  leaving planners with an as-yet-unresolved dilemma.

‘Bizarre proposal’ states  Rehman Chisthti, MP for Gillingham and Rainham  “The airport in the estuary was not the right thing do so we all worked together to oppose it. It’s really good news and we’re really pleased that common sense has prevailed.”

However,Boris Johnson refloats idea of Thames Estuary airport 18 months after it was rejected by Airports Commission. Mr Johnson believes a hub in the east of the capital would offer around double the number of long haul and domestic routes served by Heathrow while exposing 95 per cent fewer people to significant aircraft noise.

‘Grain isn’t the answer’ states  Rodney Chamber, Leader of Medway Council  “We have said all along that it should never have even been considered as it would have resulted in the mass destruction of habitat and wildlife that could never be replaced.”

How to Cope with a Mis-Sold Job

How to cope with a mis-sold job

Everyone knows a story about a smart and talented professional  who has lost his or her passion for a role, who no longer looks forward to going to the office yet remains stuck without a visible way out.  Getting on the career ladder is a great thing, you start off at the bottom and work your way up, but sometimes you can get stuck and do not even realize it.

“One in Five Employees Claim They Were Mis-sold Opportunities When They Joined Their Organisation – Kelly Global Workforce Index (Kgwi).”

Commenting on the findings,  Debbie Pettingill, Director, Kelly Services UK and Ireland said

“Employee retention will become an increasing challenge for employers as we move out of the recession. As we move into a more candidate driven market, this trend is likely to accelerate. Our findings indicate that this problem is being exacerbated by the misrepresentation of job role or company culture at the interview stage, leading to the dissatisfaction of new hires.”

Most of us know what we are trying to escape a “mis-sold” job  resulting in a  narrowly defined career, inauthentic or unstimulating work, numbing corporate politics, and  perhaps  blackmail including direct  threats of being used as a scapegoat. A job where you are both overlooked and underappreciated.  One may ring true for some of you.

“Fewer than Half of Uk Employees Are Happy with the Way Their Careers Are Progressing According to New British Research.”

Why Would A  Company or Person Block Your Move?

Well, this could be because of his or her personal insecurity  i.e. as the team works well, why rock the boat? Comfort zone: sometimes the team gets too comfortable? Golden child syndrome: you’re working your butt off and your sponsor or other senior  is reaping the recognition from your amazing deliverables?

Working a job you don’t like can leave you feeling stuck, forgotten by God, and asking yourself questions like:

Why hasn’t God opened another door for me yet?  

Why is God not moving?  

Why would God leave me here in this job I hate?

But the truth is God has not left you. He’s not holding back on you. When you feel God is silent, that’s exactly when He’s moving!  Your situation does not change God. He still loves you and is with you no matter what.

Instead of looking at our situation from a perspective of fear and worry, we need to look at it through faith and hope.

What Can You Do About it?

Don’t fret, you can handover your work or completely leave the organisation and still stay sane. You might worry that announcing your intentions will cause your company grief, but ultimately you have to do what’s best for you no matter what!

Think and pray long and hard about how you’re going to drop this bombshell  as you  will need  to give notice. A  sound method is required to overcome the assault and possible backlash – including of course more prayer and fasting.

So how are you going to approach it? What’s your reasoning going to be?  How are you going to get them to understand exactly why you’re doing this?  What do you need to do in order to prepare for the big day?

Easy, you’re going to read this guide.

Strategy 1 – Remote Working Arrangement

This could  be a great approach if 80% of your  work can be  undertaken  remotely. However, while there is a very logical argument to be made in favor of working from home, many people equate remote work to a lack of productivity and laziness. These people do not realize that the switch from an office to working from home can actually lead to significant increases in productivity.

Strategy 2 – What’s in It for Me?

What’s in it for me?   That question sounds a little selfish, doesn’t it?  Maybe you  aren’t being compensated fairly, or you’re not happy with the effort vs return.  When you know your client and team needs you and you’re willing to stay for a price, don’t mess around.  Give them the real number or offer that will make it worth your while to stick it out for awhile.

Strategy 3  –  The Budget Cut

The re-structuring.  The downsizing.  The dreaded budget cut.  Whatever name you want to give it, this  can be terrifying  for a lot of professionals.  However,  if you’re  already thinking about leaving, so maybe it doesn’t have to be such a scary thing.  In fact, maybe it can be  extremely  positive for both  parties.

Strategy 4  –  The Ease Out

Still feeling weary  about leaving the organization.  Propose easing yourself out of the post.  Pick a time frame, maybe four weeks or so, and come up with a plan for slowly taking yourself out of the position.  This also allows you some time to slowly ramp down your time commitment.

Strategy 5 –  Burning Bridges in the Industry  

“Sometimes it’s about networking and being nice to people and not burning any bridges – but remembering to draw line where you must.”

There’s no harm in an early exit from a job you never plan to mention again or an interim role where you have clearly agreed on a start and finish date.  But if your manager is well connected to your industry you should try to leave on a good note.  Why? Because it’s a small world and the next hiring manager may put in a call to his or her former colleague  (a.k.a., your new manager) to get the unofficial scoop.  It happens, so if you’re going to leave anyway then try to fulfill your end of the deal.

Strategy 6  – Get Moving Fast

Imagine, for example, that you were hired to help the company manage multiple programmes and projects  across the globe, but a recent change in leadership means all efforts moving forward will be focused locally.

If you’re spending your days just trying to find ways to be productive or are undertaking a role you never signed up for, you have every right to pursue new opportunities. Of course, the first course of action should normally be to  discuss this with your manager to see if there are other roles you can take on. But if you know that this isn’t going to happen in the new world, get moving fast.

Strategy 7  – Your Dream Job Awaits

“When you’re being interviewed, always treat the interview as a 50-50 thing,” says Andy Dallas, a director at Robert Half International, recruitment consultants. “Ask what you can expect to be doing in your first week, month and three months. Ask what a successful year looks like.”

Dream jobs don’t come every day. So, if you have a chance at yours, take it quickly  and congratulate yourself for being strong enough to leave when you were unhappy.

Strategy 8 – Remeber to Be Patient  

We will not always be in a job we desire. Maybe you are fresh out of school and are working a job that has nothing to do with the degree you just earned. Maybe you are in a situation where you are working at a job where you are overqualified, overworked, and fed up. Maybe, for the most part, you love your job but get discouraged by the mundane tasks that take up time from doing the aspects of your job you love most.    

“Humble yourselves before the Lord, and he will exalt you.” – James 4:10 NIV

Here’s the thing: God will still use this season to grow, develop, and prepare you. Any season that humbles us is preparing us for what God has next.

Any thoughts to share?

 

As seen on