9 Suggestions for Overcoming Barriers to Good Design When Using Modern Methods of Construction (Mmc)

The term ‘Modern Methods of Construction’ (MMC)  embraces a range of technologies involving various forms  of prefabrication and off-site assembly.

MMC is increasingly regarded as a realistic means of  improving quality, reducing time spent on-site, improving  on-site safety and addressing skills shortages in the  construction of UK housing.

Bridge Crossing Modern Design
Bridge Crossing Modern Design

The variety of systems now available potentially allows the  designer enough choice to sidestep problems deriving  from constraints posed by the use of any one method.  MMC systems, from closed-panel timber framed  systems to bathroom pods are a palette from which  designers can make choices. They are not necessarily  stand-alone solutions that anticipate all the needs of  an individual site and can be mixed and matched  as appropriate.

These limitations are not obstacles to achieving the good design in MMC-based schemes, but may hinder  the incorporation of more complex and innovative  types of MMC from which greater overall benefits  may be obtained  which  are considered under the  following headings:

1. COST UNCERTAINTY

There is no doubt that, given products of comparable  performance the key issue in purchases of MMC construction  systems is the price. At present not enough is known  about the potential costs of using volumetric and  closed panel systems to enable confident specification  at an early date. This inhibits designers from exploring  the full potential of MMC systems. This is particularly true of the less repetitive,  small, one-off scheme, where a smaller margin  of benefits is gained from using MMC. The principal  barrier to the uptake of MMC, therefore, seems  to be the perception of cost uncertainty with respect to using more complex systems.  Without doing substantial project-specific research,  consultants and their clients simply do not know with  enough degree of certainty how much the volumetric or  closed panel systems are likely to cost, and what  would be the savings to overall project costs produced  by potential speed gains to offset against increased  capital expenditure.

This is due to the complexity of assessing the ratio of  cost of repetitive elements where pricing is relatively  straightforward to the cost of adjusting elements or  building in another method for the abnormal condition.  Decisions to use innovative systems are likely to be  made once designs are well progressed to enable  teams to be more certain of costs. This can increase  the potential for change or result in design compromise  as the designer attempts to incorporate the specific  limitations of a particular system in their design.

In an attempt to improve this situation, the MMC consultant and or clients  could  pull together a  directory of MMC  expanded to include cost comparison data. The huge  range of variables involved inevitably makes this  difficult, but a database of current construction cost  information  would be an  invaluable resource.

Contemporary Building Facade
Contemporary Building Facade

2. PLANNING PROCESS AND EARLY COMMITMENT  TO A SYSTEM

The time it can take to obtain planning permission has  obvious implications both for project cost but also, in  some circumstances, for architectural  design innovation.

Most of the more complex types of MMC have an  impact on dimensioning, the choice of external finish  and detailing may have some effect on the buildings  mass. Therefore,  the construction system should be  chosen prior to a planning application to avoid  abortive work, redesign or amendment, or even  resubmission for planning permission.

However,  developers  whose money is at risk, frequently hold  off deciding on the construction technique until the last  practicable moment, in order to get any advantage from  fluctuations in material or component pricing.

Given the potential for lengthy duration of planning  applications, this means that there is little incentive to  prepare initial designs for planning with a prior decision  to incorporate MMC firmly embedded. In cases where  the developer has a financial or business link with the  supplier, this is less likely to be the case. As the majority  of commercial or  residential developments involve some kind of arrangement with a developer, agreement on construction systems is often left to the stage after planning.

3. TIME INVESTMENT

Another very significant factor is the time investment required at  the early stages of projects. This is needed to develop the design when the project is still at risk. There is a  direct relationship between the scale and complexity of  MMC component and the amount of time required to  develop a design at an early stage.

The introduction of advanced or complex MMC  techniques into the design process is potentially costly  to the design team. A significant amount of research is  needed to explore alternative systems, to obtain  verification of suppliers’   credentials, investigate  mortgage and insurance issues, visit previous sites,  talk to system suppliers, obtain technical performance  guidelines, understand junctions and interfaces, coordinate  other consultants, obtain building control input  and so on.

For a consultant, the only way of investing in this  research is either through timely payment of increased  fees by a visionary understanding client or through the anticipation of increased future productivity through repetition when a  project is phased, or large enough, or likely to be  followed by another similar project.

The potential of learning a system and then being able  to repeat lessons learned efficiently is a powerful  incentive for both client and consultant. By contrast, HTA’ s project at Basingstoke is an example  of a phased project with a three to four-year duration allowed the design team to repeat  various elements of the design, and the manufacturer to  develop improved solutions to technical and supply  problems.

HTA’ s project at Basingstoke
HTA’ s project at Basingstoke

4. INSUFFICIENT COMMUNICATION

Improved dialogue at the outset of the  project is  vital if design quality is to be  maximised. Constraints and opportunities implicit within  a particular system are more easily incorporated into  design if partners communicate pre-planning.  Increased early communication can be fostered through  improved long-term partnering relationships.

Clients  should also partner with a range of suppliers and  architects so that choice and flexibility is not restricted.

5. INEXPERIENCE

Generally, the inexperienced client or design team will  have to do more research, with the result  that there is likely to be significant design development  without a specific system being incorporated.

This is a  disincentive to using a more complex system involving a  higher proportion of MMC, where early decision making  and knowledge of a system’ s capabilities have a decisive influence on the nature of the architecture.  However,  encouraging the take up  of MMC through the use of a dedicated funding mechanism may  assist clients  in  finding time for  research into suitable MMC techniques.

Dome Construction Berlin
Dome Construction Berlin

6. SUPPLIER’S ROLE

Site capacity  studies and early stage pre-planning design studies  could be undertaken directly by system suppliers  on behalf of clients, cutting out the usual procedure  of commissioning design work by independent  consultants.

7. ASSUMPTIONS

There are a  number of assumptions that  are generally held about certain types of MMC that may  have been valid at one time but are no longer true today.  There is a need for reliable and up to date information  comparing system criteria, performance data, timescales, lead in times, capacity, construction time,  sequencing issues, limitations, and benefits.

Therefore  it would be helpful if a forum  for discussion and experience exchange was set up.

8. DEMONSTRATING THE BENEFITS OF MMC

There is still a large amount of skepticism about the  need to go very far down the line with MMC. This is  reflected in the acceptance of the desirability of  maintaining or indeed enhancing the pool of traditional  craft skills throughout the UK.

A balanced view is that there is a demonstrable need  for the wider use of MMC which is recognized by both  industry and government.  The best way for clients  and the public generally to  become more confident and knowledgeable about the  quality of design achievable through MMC is to see it  demonstrated.

9. FINANCIAL INCENTIVES

There is no doubt that spreading the burden of  investment through the life of a project helps to ensure  a higher standard of specification and hence quality. In  the Netherlands, a ‘ Green Financing’   system has been  developed by the Dutch government that provides  favorable loan finance when certain sustainable  standards are reached. In the UK, the Gallions HA  has  pioneered  a study of this, based on a scheme in  Thamesmead, ‘ the Ecopark project’.

Eco Park is an eco-friendly business park built on the False Bay coast. This business park is at the cutting-edge of sustainable design and offers a unique working environment in a secure, well-managed facility.
Eco Park is an eco-friendly business park built on the False Bay coast. This business park is at the cutting-edge of sustainable design and offers a unique working environment in a secure, well-managed facility.

Playing God: Swedish Train operator uses Big Data to ‘avoid train delays that haven’t happened yet’

In a sign of things to come, a Swedish train operator is using new technology that employs big data to predict the entire commuter train system two hours into the future.

Welcome to the world of “Big Data.” We have more information at our fingertips than any generation in history. We live in the world of “Big Data.” That is the new way people are trying to describe this sea of digital facts, figures, products, books, music, video, and much more. Twitter, apps, Facebook–they’re each giving science new ways to look at what people do and why.

“Hopes, fears, and ethical concerns relating to technology are as old as technology itself.”

We actually welcome some aspect of Big Data. These mysterious data successes (or accidental successes) are easy to see as a kind of Big Brother future, where technology can track your every move and report back to ”¦ someone. However, StockholmstÃ¥g, the train operator is using new technology that employs big data to predict train delays before they happen.

“The Commuter Prognosis –  A Social Scientist’s Dream Come True.”

The mathematic algorithm, called “The commuter prognosis” was  developed in Stockholm, Sweden.

When a train is not on time the algorithm forecasts disruptions in the entire network by using historic big data  to  prevent the ripple effects that actually causes most delays.
Wilhelm Landerholm the mathematician who has developed the algorithm said:

“We have built a prediction model, using big data, that lets us visualize the entire commuter train system two hours into the future. We can now forecast disruptions in our service and our traffic control center can prevent the ripple effects that actually cause most delays.”

The algorithm has been tested but is not currently being  used by traffic controllers.

How  does it work?

The key to the model is a large  amount of historical data. The model works similar to a seismograph, an instrument that measures and records details of earthquakes, such as force and duration, but instead identifies late train arrivals. When this happens, the system  uses historical data from previous occurrences to forecast the likely  impact on the entire train network.

Real-time public transportation information is already used around the globe, however, traffic control centers still typically assess  delays manually to try and prevent further problems in a network. The commuter prognosis system, on the other hand, will forecast these delay effects instantaneously  and provide a prediction of how a single or multiple  disturbance might  affect  the whole  train network. The  commuter prognosis system could change how traffic control centers operate all over the world.

“The Effects of One Delayed Train Can Quickly Multiply Within a Train Network”

Imagine that “The commuter prognosis” forecasts that a train will be 10 minutes late to station C in two hours. To deal with this the traffic control center issues a new train from station A that will arrive on time at station C. As soon as the new train has been put in motion the algorithm re-calculates and gives the traffic control center a new forecast for the entire train network within minutes.”

The most important benefit of “The commuter prognosis” is that it  provides for a more punctual public transportation.

“The commuter prognosis” will be available in a smartphone app based on the original model. The app will integrate with other transportation big data to make commuting easier and  will indicate which coaches are more or less crowded.

Big Data, Ethics, and Religion

These stories remind us that even though companies and governments are doing amazing things with data, it’s at best imperfect. The algorithms and programs they use to filter and respond to data are at least as fallible as the human beings who designed them.  We can also see its complexity and failures as evidence of the amazing omnipotence of our God – who doesn’t make errors and who knows right where to find us, even inside a great fish or the depths of hell.

The arrival of big data has already brought with it numerous questions that have yet to be properly addressed. These questions are methodological, epistemological, and ethical, and they concern (inter alia) the ways in which data is collected, stored, interpreted, represented, and traded.  A further complication is a speed with which data science is advancing, which means that (for example) the application of legal and ethical restrictions to the practice of that science will always risk being several steps behind the point that it has currently reached. There are indications that we are currently sleepwalking towards a situation in which the commercial exploitation of big data routinely increases social division, and renders privacy a thing of the past.

Ket factors

  • A mathematical model interprets big data to forecasts for each train in the train network.
  • The commuter prognosis can warn about delays two hours before the departure or arrival actually takes place.
  • The commuter prognosis calculates how the delay affects other trains in the system.
  • The purpose of “the commuter prognosis” is to make life easier for traffic control centers and to give passengers  a better service.
  • In the future, the algorithm will be potentially adaptable for more types of public transportations and cities.

Manage Your Project More Effectively Now

There are a few who get project management right from the outset, but for many it’s a minefield. In theory, project management seems easy, but it’s not as straightforward as it seems. If you’re like the majority of people, you follow what seems like a simple project management process. You start by setting your budget, you choose the right people to join the team, and hope the project gets completed without too many hitches along the way.

But, realistically speaking, project management is nothing like this – it’s hardly ever so straightforward. Mistakes are made. You might choose the wrong people to complete the project. Your team might have no idea what’s expected of them or what the project goals are, or in some cases they might even receive conflicting information, which puts the whole project in jeopardy. Sometimes the scope of the project changes, and because of everything else that’s going on, your team is unable to fulfill the requirements and meet the project deadlines.

It happens, and you’ve got to be prepared for any situation while working together towards the common goal – successfully completing the project.  

Don’t throw in the towel just yet. It might seem daunting, but there are few surefire tricks of the trade which businesses and project managers can implement to better their chances of successfully completing a project on time and within budget.

1. Know the Project Details Well

Before starting, you need to create a thorough project scope that outlines every single thing. This then needs to be approved by every stakeholder involved.

Your scope needs to have as much detail as possible such as the short-term milestones, deliverable dates, and a budget outline. It makes sense really. The more detail it includes will improve your odds when it comes to completing the project successfully.

What’s more, you’ll also improve your relationship with your client throughout the whole project process from the beginning right through to the end. Of course every project will encounter a few changes along the way – this is the norm, but having a detailed plan will help you manage your client better when something is off course.

student-849826_1920 (1)

Choose your Project Team Members and Size Wisely

2. Choose your Project Team Members and Size Wisely

Naturally, if you want your project to be a winner, you need the right people for the job, which includes having the right project manager on board. Keep your team as small as possible – size does matter; so don’t let anyone else tell you otherwise.

The smaller the team, the better the communication. It also eases the stress and takes the pressure off the project manager. With a smaller team made up of the right people, the project manager will be able to organise their group without losing sight of all the details and work that’s needed doing. So, if you really want to have an effective project, limit your group’s size and only use those people and their skills that can benefit the project.

startup-594091_1920

3. Highlight your Expectations from the Outset

You need to outline what you expect and what the client expects, which includes all the milestones, from the very beginning. Setting more milestones more frequently will allow you to follow the project’s progress more effectively. This way you’ll be able to jump on things quickly when they begin to go off scope, allowing you and your team to remain on target and on time.

Setting frequent milestones in a project will also allow you to review your spending and the investment thus far, which in turn will help you stay within the budget.

Milestones remove any ambiguity. They allow people to stay on target and there’s less risk of derailing the project.

Milestone setting should be a team effort. Everyone should be on board, so there won’t be any excuses later on down the line.

4. Does your Team Know what They’re Doing?  

It may sound like a given, but it’s really important to be crystal clear from the beginning regarding people’s roles in the project. In other words, you need to highlight who is responsible for what, and what their deadline or deadlines are.

Things can get complicated with many people working on the same task. Sometimes things get misinterpreted or lost in translation. Avoid anyone being confused by clearly stating who should do what right from start, and make sure you enforce accountability.

You don’t need to worry about manually managing such tasks, as there are plenty of easy-to-use online task management programmes that can do this for you, so embrace technology and ease your pressure.

You may think it’s a waste of time spelling it all out, but this ensures that the full scope of the project is understood, people are clear of their role and individual and collaborative timelines. This is the key to keeping people on task and motivated.

5. Stop Micromanaging

It’s important to constantly touch base with your team members. However, there’s a fine line between supporting them and breathing down their necks. Give them space instead of micromanaging. Empower your team, trust them, and you’ll get their best work.

6. Use a Reliable System to Manage the Project

Communication is key. Most people rely on emailing, but when it comes to managing a big project with a number of different people working on it, this can hinder the project’s progress. Constantly referring back to old emails and previous correspondence is only going to waste precious time. Use software that keeps everything in one place from communication to any project information and updates. This will save you and your team a lot of time and money.

student-849822_1280

Motivate your Team

7. Motivate your Team

Everyone works better with positive reinforcement. Set milestones and reward when they’re reached. Your milestones will keep all people on track. Celebrate milestones together, but be sure to also recognise those who can’t meet them.

8. Frequent Short Meets to Stay on Track

startup-593344_1920

It’s a project with many people collaborating, so holding regular meetings is a must. This is the only way to ensure that everyone and the project are on track. But you need to keep it short and sweet. Don’t meet for the sake of meeting. Have an agenda and stick to it. If you’re doing your project virtually, it’s even more important to touch base on a regular basis, so keep those communication lines open.

People do tend to go on at times when given the floor, so give everyone a set time to speak and make sure you all stick to it.

9. Allow Time for Change

student-849824_1920

No project ever runs 100% smoothly and specifications do change along the way. So to avoid the unnecessary stress and running around frantically, do some forward thinking, and set aside a certain amount of time for any changes in the scope – you’ll thank yourself for doing so in the end!

Momo Apartments

MoMo apartments

MoMo apartments

MoMo apartments
MoMo apartments  –  Architect,  Allford Hall Monaghan Morris LLP

Zero defects are the primary battleground  between traditional and modern  construction methods. A relative  concept, zero defects is, however, a  target that the construction industry  has set for itself. Primary  considerations are structural stability  and keeping the water out. Proper  functioning of services, components,  fixtures, and fittings are essential.

Energy and sound performance are  also vital, as well as issues of safety,  access, and security. This is a  campaign which will be fought in  years to come… and in the meantime  here is another prefab  scheme  which feature’s in these  skirmishes.

Mobile Modular (MoMo) is a  research development project for a  relocatable system of mass housing  constructed from specially fabricated  shipping containers. This type of  system allows flats to be erected  speedily on short-life sites and to be  demounted and re-assembled in  different configurations on other sites  in the future.

The key objectives:

Remove MoMo apartments from a  site where housing has been provided  for 5 years.

Refurbish Each module at the  supplier’s yard or an alternative  temporary site.

Re-locate The apartments in any  new configuration to provide  decanting, short-term housing,  permanent apartments. This type of  system can also become a  permanent housing solution.

Originally commissioned by the  Peabody Trust, after feasibility stage, the team was invited to take the  project forward with their own  initiative. The team formed a  consortium with the aim of developing  a prototype to  demonstrate  the principles, and to market the  MoMo scheme as a one-stop shop  package to interested parties.

 