Old Montague Street Student Accommodation

London needs over 30,000 new  homes every year for the next 15  years to keep up with the demand  from the people who wish to live and  work in the city. Despite good  housing output, figures published  by the GLA show that there is a huge  deficit in the number of affordable  homes being produced, particularly  larger homes.

A  shortage of bricks  is often cited  as the main reason why developers are  looking at new methods of  construction to answer the demand  for new homes. But brick is a major  part of the London urban  environment; planners often insist  on this most familiar of materials,  homeowners love its solid  dependability. Therefore masonry is  also becoming a modern technology  to overcome the lack of skilled  craftsmen available. Several  companies have developed brickslip  cladding systems which look  like solid brickwork but need much  less skill to install. Glued brickwork  is another innovative approach  introduced from Europe whose thin  mortar joints produce a new sharper  continental aesthetic.
Old Montague Street Student Accommodation

Old Montague Street Student Accommodation

This Hall of Residence containing 219 Study bedrooms is set in the vibrant east end of London, just a few minutes walk from the Whitechapel Road the famous Brick Lane. The scheme consists of cluster flats of 6/7 bedrooms each sharing a kitchen, arranged over three floors above basement and ground floor commercial and ancillary accommodation. Provision of a formal courtyard for all access together with the vertical grouping of amenity space is an inherent part of the design. The accommodation is composed of offsite prefabricated pods which were brought to site finished with all fittings and fixtures clad with thin brick slip cladding.

Clients:  Shaftesbury Housing Group  and  The London Institute

Architect:  T P Bennett

Principal Supplier:  Hanson Plc

Location:  Don Gratton House, 82 Old Montague St, London E1 5NN

 

9 Suggestions for Overcoming Barriers to Good Design When Using Modern Methods of Construction (Mmc)

The term ‘Modern Methods of Construction’ (MMC)  embraces a range of technologies involving various forms  of prefabrication and off-site assembly.

MMC is increasingly regarded as a realistic means of  improving quality, reducing time spent on-site, improving  on-site safety and addressing skills shortages in the  construction of UK housing.

Bridge Crossing Modern Design
Bridge Crossing Modern Design

The variety of systems now available potentially allows the  designer enough choice to sidestep problems deriving  from constraints posed by the use of any one method.  MMC systems, from closed-panel timber framed  systems to bathroom pods are a palette from which  designers can make choices. They are not necessarily  stand-alone solutions that anticipate all the needs of  an individual site and can be mixed and matched  as appropriate.

These limitations are not obstacles to achieving the good design in MMC-based schemes, but may hinder  the incorporation of more complex and innovative  types of MMC from which greater overall benefits  may be obtained  which  are considered under the  following headings:

1. COST UNCERTAINTY

There is no doubt that, given products of comparable  performance the key issue in purchases of MMC construction  systems is the price. At present not enough is known  about the potential costs of using volumetric and  closed panel systems to enable confident specification  at an early date. This inhibits designers from exploring  the full potential of MMC systems. This is particularly true of the less repetitive,  small, one-off scheme, where a smaller margin  of benefits is gained from using MMC. The principal  barrier to the uptake of MMC, therefore, seems  to be the perception of cost uncertainty with respect to using more complex systems.  Without doing substantial project-specific research,  consultants and their clients simply do not know with  enough degree of certainty how much the volumetric or  closed panel systems are likely to cost, and what  would be the savings to overall project costs produced  by potential speed gains to offset against increased  capital expenditure.

This is due to the complexity of assessing the ratio of  cost of repetitive elements where pricing is relatively  straightforward to the cost of adjusting elements or  building in another method for the abnormal condition.  Decisions to use innovative systems are likely to be  made once designs are well progressed to enable  teams to be more certain of costs. This can increase  the potential for change or result in design compromise  as the designer attempts to incorporate the specific  limitations of a particular system in their design.

In an attempt to improve this situation, the MMC consultant and or clients  could  pull together a  directory of MMC  expanded to include cost comparison data. The huge  range of variables involved inevitably makes this  difficult, but a database of current construction cost  information  would be an  invaluable resource.

Contemporary Building Facade
Contemporary Building Facade

2. PLANNING PROCESS AND EARLY COMMITMENT  TO A SYSTEM

The time it can take to obtain planning permission has  obvious implications both for project cost but also, in  some circumstances, for architectural  design innovation.

Most of the more complex types of MMC have an  impact on dimensioning, the choice of external finish  and detailing may have some effect on the buildings  mass. Therefore,  the construction system should be  chosen prior to a planning application to avoid  abortive work, redesign or amendment, or even  resubmission for planning permission.

However,  developers  whose money is at risk, frequently hold  off deciding on the construction technique until the last  practicable moment, in order to get any advantage from  fluctuations in material or component pricing.

Given the potential for lengthy duration of planning  applications, this means that there is little incentive to  prepare initial designs for planning with a prior decision  to incorporate MMC firmly embedded. In cases where  the developer has a financial or business link with the  supplier, this is less likely to be the case. As the majority  of commercial or  residential developments involve some kind of arrangement with a developer, agreement on construction systems is often left to the stage after planning.

3. TIME INVESTMENT

Another very significant factor is the time investment required at  the early stages of projects. This is needed to develop the design when the project is still at risk. There is a  direct relationship between the scale and complexity of  MMC component and the amount of time required to  develop a design at an early stage.

The introduction of advanced or complex MMC  techniques into the design process is potentially costly  to the design team. A significant amount of research is  needed to explore alternative systems, to obtain  verification of suppliers’   credentials, investigate  mortgage and insurance issues, visit previous sites,  talk to system suppliers, obtain technical performance  guidelines, understand junctions and interfaces, coordinate  other consultants, obtain building control input  and so on.

For a consultant, the only way of investing in this  research is either through timely payment of increased  fees by a visionary understanding client or through the anticipation of increased future productivity through repetition when a  project is phased, or large enough, or likely to be  followed by another similar project.

The potential of learning a system and then being able  to repeat lessons learned efficiently is a powerful  incentive for both client and consultant. By contrast, HTA’ s project at Basingstoke is an example  of a phased project with a three to four-year duration allowed the design team to repeat  various elements of the design, and the manufacturer to  develop improved solutions to technical and supply  problems.

HTA’ s project at Basingstoke
HTA’ s project at Basingstoke

4. INSUFFICIENT COMMUNICATION

Improved dialogue at the outset of the  project is  vital if design quality is to be  maximised. Constraints and opportunities implicit within  a particular system are more easily incorporated into  design if partners communicate pre-planning.  Increased early communication can be fostered through  improved long-term partnering relationships.

Clients  should also partner with a range of suppliers and  architects so that choice and flexibility is not restricted.

5. INEXPERIENCE

Generally, the inexperienced client or design team will  have to do more research, with the result  that there is likely to be significant design development  without a specific system being incorporated.

This is a  disincentive to using a more complex system involving a  higher proportion of MMC, where early decision making  and knowledge of a system’ s capabilities have a decisive influence on the nature of the architecture.  However,  encouraging the take up  of MMC through the use of a dedicated funding mechanism may  assist clients  in  finding time for  research into suitable MMC techniques.

Dome Construction Berlin
Dome Construction Berlin

6. SUPPLIER’S ROLE

Site capacity  studies and early stage pre-planning design studies  could be undertaken directly by system suppliers  on behalf of clients, cutting out the usual procedure  of commissioning design work by independent  consultants.

7. ASSUMPTIONS

There are a  number of assumptions that  are generally held about certain types of MMC that may  have been valid at one time but are no longer true today.  There is a need for reliable and up to date information  comparing system criteria, performance data, timescales, lead in times, capacity, construction time,  sequencing issues, limitations, and benefits.

Therefore  it would be helpful if a forum  for discussion and experience exchange was set up.

8. DEMONSTRATING THE BENEFITS OF MMC

There is still a large amount of skepticism about the  need to go very far down the line with MMC. This is  reflected in the acceptance of the desirability of  maintaining or indeed enhancing the pool of traditional  craft skills throughout the UK.

A balanced view is that there is a demonstrable need  for the wider use of MMC which is recognized by both  industry and government.  The best way for clients  and the public generally to  become more confident and knowledgeable about the  quality of design achievable through MMC is to see it  demonstrated.

9. FINANCIAL INCENTIVES

There is no doubt that spreading the burden of  investment through the life of a project helps to ensure  a higher standard of specification and hence quality. In  the Netherlands, a ‘ Green Financing’   system has been  developed by the Dutch government that provides  favorable loan finance when certain sustainable  standards are reached. In the UK, the Gallions HA  has  pioneered  a study of this, based on a scheme in  Thamesmead, ‘ the Ecopark project’.

Eco Park is an eco-friendly business park built on the False Bay coast. This business park is at the cutting-edge of sustainable design and offers a unique working environment in a secure, well-managed facility.
Eco Park is an eco-friendly business park built on the False Bay coast. This business park is at the cutting-edge of sustainable design and offers a unique working environment in a secure, well-managed facility.

Straw Now Offers a Simple and Effective Home-grown Solution to the Uk’s Housing Needs

Straw-bale construction

Hey, fancy buying a straw house?  Straw-bale construction is a building method that uses bales of straw as structural elements and building insulation. These environmentally friendly homes use prefabricated timber-framed walls that are packed with straw bales and  are the result of an engineering research project led by the University of Bath.

Straw houses have been built on the African plains since the Paleolithic Era and  are on sale on the open market for the first time in the UK after becoming eligible for standard mortgages.

Don’t be Surprised if the Big Bad Wolf Comes Calling

pig-756026_1920

Though straw walls might be most readily linked to a story of pigs making the wrong  construction decisions, the team behind these homes says the material offers real potential for ultra low carbon housing throughout the UK.

Compressed and Plastered Straw Bale Walls Are Also Resistant to Fire

UK's first straw houses to be offered on the open market in Bristol
UK’s first straw houses to be offered on the open market in Bristol

Researchers  stressed  that  it is a safe and  robust  construction material,  boasting environmental  advantages such as insulation efficiency  that reduce  energy bills by up to 90%

Building with Straw Could Be a Turning Point in Our Trajectory Towards a Low Carbon Future

Until now the Straw homes have been used for  bespoke building projects and financed through specialist lenders but now a row of straw houses in Bristol have become the first to secure building certification making  them eligible for a standard mortgage.

You Can Huff and Puff but These Houses Won’t Blow Down!

“I believe  there’s a lot of misconception about using straw — stories about the Three Little Pigs and the Big Bad Wolf,” Professor Pete Walker told the BBC.

The only hint this new  construction method is  a ‘truth window’ in each property where a section of straw wall will be visible through a window.  Although these are not the first houses in the UK to be built using straw bales, they are the first to be built for any buyer on the open market.

The researchers worked with specialist architectural firm Modcell.

The houses are on a street of traditional brick-built homes in Bristol and are covered  in brick to fit in with the surroundings.  The team says this development should help move building with straw to the wider market.

As part of this EU-funded project, Prof Walker and his colleagues have systematically tested and refined the technology – including testing its structural and weight-bearing properties, and its thermal insulation.

Facts

  • Straw is the leftover stalks from cereal crops
  • Four million tonnes of this leftover straw is produced every year by the UK
  • According to the Agricultural and Horticultural Development Board it takes about seven tonnes of straw to build a three-bedroom house
  • There  is potential to grow the material for more than half a million new homes every year in British fields.

These are the first straw-bale homes  built speculatively for the open market a very exciting time for this building technology, as the  more we build out of renewable materials like straw and timber, the less carbon will be in the atmosphere, so we can reduce climate change effects.

About Dean Jones

Dean is an Associate in AECOM’s Programme Leadership Practice. Dean joined AECOM from Care UK, the UK’s largest independent provider of health and social care, where he was a Programme Manager and delivered a £250m investment growth programme over 2012/15 which increased Care Uk’s number of homes circa 33%. Dean was also Programme Manager for a £60m Suffolk programme to build ten new care homes and ten day clubs, bringing much needed additional nursing and specialist dementia care to the Suffolk community.

Prefab Comeback

Prefab  housing suffers from bad stigma due to the fact that some people saw the prefabs as ugly and characterless, and were afraid they would become slums – hardly the promised housing fit for heroes  following the second World War. However, building homes from pre-made parts can save time and money.  The term prefab or prefabrication often evokes thoughts of poor construction, substandard living conditions and a long-standing “temporary” solution.

Prefab dwellings are making a comeback driven by a lack of affordable housing, a rapidly growing economy and changing demographic trends.  

Methods Methods of Construction (Mmc) Offer Significant Potential to Minimise Construction Costs

The term ‘Modern Methods of Construction‘ refers to a collection of relatively new building construction techniques that aim to offer more advantages over traditional construction methods. Off-site construction (OSC) is a modern method of construction, based on off-site manufacturing of building elements.

With exponentially lower construction costs, quicker construction, reduced  labor costs and having the ability to achieve zero defects, MMC is gaining a lot of attention as the  potential answer to the UK’s housing crisis.

In a valiant attempt to strip away prefabricated housings’ bad rep are MMC with contemporary sleek designs, and constructed to withstand the test of time. MMC housing has the capability to deliver both quality and quantity housing to the tune of ‘ £50,000 per unit.

MMC units hold the promise of being extremely  energy efficient and environmentally sustainable. Many versions of MMC take into account how to utilise natural resources and reduce each unit’s carbon footprint. In addition, MMC also addresses environmental concerns by creating much less waste than a standard brick-and-mortar project. While it is plausible that a traditional build could hire a waste removal company who would have the ability to recycle up to 90 percent of the construction waste; with MMC projects, this will automatically happen.

M-house (pronounced “mouse
M-house (pronounced “mouse”)

There have already been a number of successful examples of MMC housing constructed in various parts of the United Kingdom. The M-house (pronounced “mouse”) is designed and constructed to last an upwards of 100 years. While Architect Alford Hall have created quality MMC apartment buildings proudly showcasing a patio and private entrance for each flat.

Architect Alford Hall
Architect Alford Hall
Compass House by AHMM
Compass House by AHMM

While many of the MMC homes  are still in their early years the upkeep and maintenance will be reduced by 50%  since the OSC  process lowers the risk of non-conformities.

MMC homes are being fabricated and designed to accommodate many different lifestyles, such as, two-story homes, tall six-story apartment buildings, single-family homes and log cabins are all available options for families looking at MMC.

While there is a plethora of design options available all MMC  OSC  projects have a common theme. The internal workings of the homes are fabricated off-site, while only the “outer skin” comes to fruition on-site. To even further streamline the process, it has been suggested that having a “catalog of pre-selected materials increases supplier relationships and makes the design process more streamlined.”

With the small sample available with progressive MMC systems, it is currently reasonable to conclude that using modern methods of construction to build homes can cost more than traditional home building procedures; due to the need for specialised MMC design consultants. However, outside of costs, MMC remains a faster home building method than traditional brick and block house building and is slowly  becoming a relevant front-runner to answer the  UK’s housing shortage.

 

As seen on