15 Shocking Project Management Statistics

15 Shocking Project Management Statistics

The project management landscape is changing  with an increased emphasis on productivity, reporting, and information technology. A number of studies have been completed that look into the success and  failure rates of projects.

Below are  15 shocking  statistics that reveal how project management has changed and is performing across various industries over the last 5 years.

  1. There is  projected to be 15.7 million new project management roles to  be added globally across seven project-intensive industries by 2020 reaching an economic impact of over $18 trillion, across seven project-intensive industries  including  Manufacturing, Finance & Insurance, Information Services, Utilities, Business Services, Oil & Gas  and  Construction (Project Management Institute)
  2. 75% of IT executives believe their projects are “doomed from the start. (Geneca)
  3. The healthcare industry is projected to increase project management roles by 30%,  a higher growth rate than any current project intensive industry between 2010 and  2020. (Project Management Institute)
  4. A third of all projects were successfully completed on time and on budget over the past year. (Standish Group)
  5. 80% of “high-performing” projects are led by a certified project manager.  (PricewaterhouseCoopers, Insights and Trends: Current Programme and Project Management Practices 2012)
  6. One in six IT projects have an average cost overrun of 200%.  (Harvard Business Review 2004)
  7. 44% of project managers use no software, even though PWC found that the use of commercially available PM software increases performance and satisfaction. (Pricewaterhouse Coopers)
  8. More than 90% of organizations perform some type of project postmortem or closeout retrospective. (The Standish Group: CHAOS Research Report 2013)
  9. On average, it takes 7 years in the profession to go from entry-level to managing large, complex projects.  (ESI International: Annual Salary Survey 2013)
  10. The average large IT project runs 45% over budget, 7% over time, and delivers 56% less value than expected. (Project Management Institute: Pulse of the Profession 2015)
  11. Only 64% of projects meet their goals. (Project Management Institute: Pulse of the Profession 2015)
  12. 60% of companies don’t measure ROI on projects. (KPMG New Zealand: Project Management Survey 2010)
  13. The United States economy loses $50-$150 billion per year due to failed IT projects. (Gallup Business Review)
  14. In just a 12 month period 49% of organizations had suffered a recent project failure.  In the same period only 2% of organizations reported that all of their projects achieved the desired benefits.  86% of organizations reported a shortfall of at least 25% of targeted benefits across their portfolio of projects and many organizations failed to measure benefits so they are unaware of their true status in terms of benefits realization. (KPMG – Global IT Project Management Survey 2005)
  15. According to an IBM study, only 40% of projects meet schedule, budget and quality goals. (Harvard Business Review 2004)

If you have any other project management statistics please share them with us.

You Were Never Made to Be ‘Productive’

Compared to people in other industrialized nations, Americans work longer hours, take fewer vacation days, and retire later in life. Busyness, once seen as the curse of the disadvantaged, has become equated with status and importance. Our work increasingly defines who we are.

“Godly rest (distinct from play, relaxation, or sleep) is inextricably tied to our identity as children of God.”

The solution perhaps is to be “Lazy Intelligent”?  That sounds like something an unsuccessful, lazy slacker would say, isn’t it? Actually, it’s the opposite. One of America’s most influential and controversial science fiction authors Robert Heinlein uttered these words during his time. Despite his nod to laziness, Heinlein went on to pen hit titles such as Starship Troopers and Stranger in a Strange Land.

Productive laziness is not about doing absolutely nothing at all. It’s not about just sitting around and drinking coffee or engaging in idle gossip while watching the non-delivered project milestones disappear into the horizon. In fact, this behavior would lead to a very short-lived project management career.

Laziness Is Not Synonymous with Stupidity

Instead, productive laziness should be viewed as a more focused approach to management. Adopting this mindset means concentrating efforts where it really matters, rather than spreading yourself thing over unimportant, non-critical activities that in some cases don’t need to be addressed at all.

According to the Pareto Principle — Also Known as the “80/20 Rule” — 80 Percent of the Consequences Stem from 20 Percent of the Causes.

While the idea has a rule-of-thumb application, it’s also commonly misused. For example, just because one solution fits 80 percent of cases, that doesn’t mean it only requires 20 percent of the resources needed to solve all cases.

The principle, suggested by management thinker Joseph M. Juran, was named after Italian economist Vilfredo Pareto, who observed that 80 percent of property in Italy was owned by 20 percent of the population. As a result, it was assumed that most of the result in any situation was determined by a small number of causes.

Rest Is at the Center of God’s Design

Every smart but lazy person should consider the 80/20 Rule each day. For managers, the principle is a reminder to concentrate on the 20 percent of work that really matters.

Contrary to belief, 80 percent of success is not just showing up. In fact, only 20 percent of what you do during the day will produce 80 percent of your results. Therefore, it is important to identify and focus on that 20 percent during the working day.

Project Journal5

When genius and laziness meet, the results can be magical. Being just the right combination of smart and lazy can bring you to have a real edge over others. Interestingly enough, smart lazy people are generally better suited for leadership roles in organizations.  These people make great strategic thinkers and leaders. They do things in a smart way in order to expend the least effort. They don’t rush into things, taking that little bit of extra time to think and find the shortest, best path.

They  question, contradict, and show dissent against inefficient methods or unnecessary tasks.

“Whenever There Is a Hard Job to Be Done, I Assign It to a Lazy Man; He Is Sure to Find an Easy Way of Doing It. — Bill Gates”

Bill’s not the only guy, who believes that laziness doesn’t necessarily have to be a bad thing.  German Generalfeldmarschall Helmuth Karl Bernhard Graf von Moltke was the chief of staff for the Prussian Army for 30 years. He is regarded as one of the greatest strategists of the latter 1800s among historical scholars and is the creator of the more modern method of directing armies in the field.

Moltke observed his troops and categorized them based on their intelligence, diligence and laziness. If soldiers proved to be both lazy and smart, they were promoted to leadership because they knew how to be successful with efficiency. If soldiers were smart and diligent, they were deployed into a staff function, focusing on the details. Soldiers who were not smart and lazy were left alone in hopes they would come up with a great idea someday. Finally, soldiers who were not smart but diligent were removed from ranks.

Like Moltke’s army, the lazy manager is all about applying these principles in the delivery and management of work. You’re likely not stupid since you’ve landed the management position, but how are your lazy skills? Applying smart-lazy tactics will not only allow your work to be more successful, but you will also be seen as a successful individual and a top candidate for future leadership roles.

Think return on investment (time spent versus money earned ratio) rather than busy work and  don’t restrict yourself to a certain way  of doing things just for the sake of the status quo.

These people make great strategic thinkers and leaders. They do things in a smart way in order to expend the least effort. They don’t rush into things, taking that little bit of extra time to think and find the shortest, best path.

In the wise words of Bill Gate’s and American automotive industrialist Walter Chrysler, “Whenever there is a hard job to be done, assign it to a lazy man or woman for that matter; as he or she is sure to find an easy way of doing it.”

For an overachieving people-pleaser like me, thinking of rest as an innate part of who we were created to be—not as a discipline or something to be earned—is compelling. It is yet another form of God’s infinite grace, one that’s needed today more than ever.

Co-Author Peter Taylor

Described as “perhaps the most entertaining and inspiring speaker in the project management world today”, Peter Taylor is the author of two best-selling books on ‘Productive Laziness’ – ‘The Lazy Winner’ and ‘The Lazy Project Manager’.

 

35 Powerful Quotes That Will Inspire You to Be Successful

Being a both a Christian and a leader can be an emotional ride, with ups, downs, joy, and disappointment. Words have power and these inspiring and motivating quotes are guaranteed to challenge the way you think and perhaps even change the way you live.

We  hope they resonate with you as much as they have with us.  Sometimes a little piece of advice or wisdom from a brilliant mind can help you motor through even the most difficult of times.

  1. I’ve learned that people will forget what you said, people will forget what you did, but people will never forget how you made them feel. ’- Maya Angelou
  2. It’s not the load that breaks you down, it’s the way you carry it. ’- Lou Holtz
  3. What happened, happened, and it wouldn’t have happened any other way. Lewis Carroll
  4. Choose a job that you like, and you will never have to work a day in your life. ’- Confucius
  5. Fools give full vent to their rage, but the wise bring calm in the end. ’-  Proverbs 29:11
  6. Perfection is not attainable, but if we chase perfection we can catch excellence. —Vince Lombardi
  7. Whatever the mind can conceive and believe, the mind can achieve. ’- Napoleon Hill
  8. Keep away from people who try to belittle your ambitions. Small people always do that, but the really great make you feel that you, too, can become great. ’- Mark Twain
  9. The function of leadership is to produce more leaders, not more followers. ’- Ralph Nader
  10. As iron sharpens iron, so one person sharpens another. ’- Proverbs 27:17
  11. If you cannot do great things, do small things in a great way. ’- Napoleon Hill
  12. What is not started will never get finished. ’- Johann Wolfgang von Goethe
  13. When you cease to dream, you cease to live. ’- Malcolm Forbes
  14. Build your own dreams, or someone else will hire you to build theirs. ’- Farrah Gray
  15. Your most unhappy customers are your greatest source of learning. ’- Unknown
  16. Winners never quit, and quitters never win. ’- Vince Lombardi
  17. Your time is limited, so don’t waste it living someone else’s life. ’- Unknown
  18. Life is 10% what happens to me and 90% of how I react to it. —Charles Swindoll
  19. The price of success is hard work, dedication to the job at hand  and the determination that whether we win or lose, we have applied the best of ourselves to the task at hand. ’- Vince Lombardi
  20. Speak your mind, even if your voice shakes. ’- Maggie Kuhn
  21. It takes 20 years to build a reputation and five minutes to ruin it. If you think about that, you’ll do things differently. ’- Warren Buffett
  22. Remember no one can make you feel inferior without your consent. —Eleanor Roosevelt
  23. When someone tells me “no,” it doesn’t mean I can’t do it, it simply means I can’t do it with them. ’- Karen E. Quinones Miller
  24. If you want to lift yourself up, lift up someone else. —Booker T. Washington
  25. You can’t build a reputation on what you are going to do. ’- Henry Ford
  26. A person who never made a mistake never tried anything new. ’- Unknown
  27. I am not a product of my circumstances. I am a product of my decisions. —Stephen Covey
  28. Logic will get you from A to B. Imagination will take you everywhere. ’- Unknown
  29. Remember that not getting what you want is sometimes a wonderful stroke of luck. ’- Unknown
  30. I can’t change the direction of the wind, but I can adjust my sails to always reach my destination. —Jimmy Dean
  31. If you’re offered a seat on a rocket ship, don’t ask what seat! Just get on. —Sheryl Sandberg. —  Proverbs 15:1
  32. A gentle answer turns away wrath, but a harsh word stirs up anger
  33. Everything you’ve ever wanted is on the other side of fear. —George Addair
  34. The most difficult thing is the decision to act, the rest is merely tenacity. —Amelia Earhart
  35. A good name is more desirable than great riches; to be esteemed is better than silver or gold. —  Proverbs 22:1

Bookmark this page and come back to it when you need some inspiration and motivation.

66% of IT Projects Fail

Is Britain a nation of slient Christians?

Only one in three software projects will turn out to be successful. According to Standish Group’s 2015 Chaos report, 66% of technology projects (based on the analysis of 50,000 projects worldwide) end in partial or total failure. More surprisingly, these statistics have been the same for the last five years, the report shows. Furthermore, 17% of large IT projects go so badly that they can threaten the very existence of  a company.

On Average, Large It Projects Run 45% over Budget and 7% over Time, While Delivering 56% Less Value than Predicted

Despite such failures, huge sums continue to be invested in IT projects and written off. For example the cost of project failure across the European Union was ┚¬142 billion in 2004.

It Projects Always Come with an Element of Risk, but There Are Huge Gains to Be Had If We Can Just Avoid Some of the Factors That Contribute Frequently to Project Failure

What makes a IT project successful, though?

According to the Standish Group, a successful project is on time, on budget and has satisfactory results (value, user and sponsor satisfaction, and meets target requirements). Other measures of success are widely known and accepted as true such as getting requirements right, providing effective leadership, and having full support and engagement from sponsors and users. Without these, it’s unlikely that any project would succeed.

But there’s more to success than what is widely known and, apparently, rarely followed. To reduce the risk of failure for your tech project, here are  six key actions to take on the road to success.

1. Executive Vision and Involvement

Without a Executive Senior Sponsor Its Easy for Projects to Fail with the Organizational Resistance That Accompanies Large Change

Executive involvement is a primary variable in predicting the success of an IT project.   Having a leadership team aligned across an organization articulating the purpose, value, and rationale for a project goes a long way towards getting stakeholders and end-users pulling the proverbial rope in the same direction.

2. Have a clear view of scope and timetable

Oftentimes, a tech project flops because its developers fail to plan and rush forward with  an idea. However, some project  managers plan so meticulously that they end up falling behind and lose momentum. The best approach is somewhere in between.

Interviewing team members, documenting requirements, prioritizing what is “mission critical” versus “nice to have,” getting agreement across stakeholders can feel like a never-ending cycle.   As a result, requirement gathering has fallen out of fashion with many organizations  in the past few years.

However, the ideal starting point for a successful technology project is to have a set of fundamental requirements with sufficient detail to develop against.

Requirement Gathering Is Labour-intensive and Challenging but Remains the Roadmap and Measuring Stick for Software Projects

This approach allows you to maintain sight of the business benefits as well as engaging stakeholders and responding to their feedback.  In combination with a  clear business case, a  well-defined set of requirements also simplifies design and testing, two areas where projects tend to go  sideways.

Ensure that requirements for the project are clearly defined and agreed upon among stakeholders and that you have a way to track, measure, and manage changes in requirements as appropriate during the project.

3. Define how you will deliver

When it comes to delivering a major project, one size does not always fit all. All products are customizable to some degree, so what might have worked  in one company may not work in another company.

That being said, why reinvent the wheel if it’s already proven successful?  Sometimes it  can be more beneficial to  use an existing  off the shelf solution. Whichever direction you take,  choose the delivery mode that works best for your company.

4. Risk Identification and Management

Every project has risk and  there are many  factors out of your control. People leave the organization, for better or worse, leadership changes,   budgets get cut, however, many risks  to projects can be mitigated or even eliminated with some forethought and on-going management.    For example, do you have the resources you need to deliver the project (resource risk).   Are project goals clearly understood and requirements clearly defined (scope risk).   Do you have a realistic project plan and timeline (time risk).

Mitigating Risk Is a Combination of Science and Art, and Always a Balancing Process

5. Test your product again and again

A technology project is something that should overall support your business. It should not be something that dictates and forces you to  change your operations. If this is happening, you should shift gears and focus on tweaking the technology, rather than lowering expectations and adopting less ideal requirements.

Adequate testing is a must for any tech project. While some features may be fine with automated testing, the best approach is to have a dedicated testing team. Testing activities should mirror those with the development team throughout the project’s lifetime. With thorough testing, a project should deliver with less design flaws or missing requirements.

6. Prioritize simplicity and performance

Developers often leave the external look and feel of a product to the wayside thinking these things are not necessities for the consumer to enjoy. However, user experience is absolutely critical to the success of the project.

Developers must consider things like storage, network requirements, processing speeds and overall performance in order to satisfy the customer. If users are going to have to wait for an extended period to allow information to load, there must be a good reason for the wait, otherwise they won’t return for future products.

Simplification and Improved Efficiency Is What Adds Value

Ultimately, using the product should be a smooth and intuitive experience. Additionally, tools and alternative routes must be placed logically without being intrusive. The process can be complicated, but the finished product should emit simplicity. After all, that’s what makes companies like Apple so successful. Simplification and improved efficiency is what adds value.

A Day in the Life of a Project Manager

Managing Daily Routines: A Day in the Life of a IT Project Manager

We all know that project managers are responsible for managing projects through to completion while remaining on time and within budget, but how exactly do they do it? What does a typical day look like for a project manager?

Here’s a sample of what a typical day might look like for a project manager.

The Early Bird Gets the Worm, Success Comes to Those Who Prepare Well and Put in Effort

8.30  am: Starting the day
After settling in for the day’s activities, it’s time to plan out the day. Start up the computer, email clients, draft team schedules, organize time sheets and  create the to-do list.

To-do lists help managers and their teams stay on track. If a manager notices that one team member has yet to deliver an assignment, they can address this issue first thing in the morning; otherwise, delays can build up and affect the project. Likewise, lists help managers see the next course of action for projects.

9:15 am: Time to get moving

Efficiency is a must and there is no time to be wasted in project management. After a quick review of project plans and to-do lists, the manager must be prepared to get his team moving right away.

Round up team members, review the project’s current position and emphasize the next course of action. In order to get the team moving on assignments, strong project managers set deadlines throughout the day.

Morning team meetings are also necessary to make sure each member understands the project and their assignments. It’s also a time to answer any questions for clarity or to get feedback or concerns from individuals.

While daily group meetings can be important, they are not always necessary and can be counter-productive. If the team is on the same page and everyone is ready to tackle the tasks of the day, spend a short period re-grouping so that the team can get on and complete their assignments. There’s no need to spend hours planning and reviewing.

10 am: Meetings, meetings, meetings
More than one project manager will be  more than likely  in the office  and they will all need to work together for the benefit of the programme. This is why meetings with other managers and higher ups are necessary in a project manager’s day.

Meetings allow each project manager to go through the status of their respective projects and to track the weekly schedule and other deadlines. It is also a time to address any business-critical tasks that might come up.

It’s worth considering that only 7% of communication is spoken. The other 93% is made up of tone (38%) and body language (55%). So although facts and figures are easily communicated via email, letter or phone, an actual discussion or negotiation is best handled where you can see the other person and therefore are able to see for yourself what their tone and body have to say on the matter.

10:30 am: Tackling the small stuff
Meetings will be on and off throughout the day for project managers, which is why it’s important to tackle the small tasks in between appointments. Small tasks include wrapping project reports, booking future meetings, answering correspondences with other colleagues, reviewing items and team reports among other things.

It’s also important to schedule post-mortem meetings with the project team  to review the success of  projects  in order  to apply any  lessons learnt to future projects.

11 am: Project kick-off meeting
When one project ends, another begins, which means it’s time for yet another project kick-off meeting. Kick-off meetings can take on various forms, depending on the type of business. However, they all share the same basic needs.

Every individual involved with the new project should be in attendance and have the latest version of project specifications in written form. As project manager, it might be wise to send this to team members several days before the kick-off meeting to ensure everyone has time to review.

During a kick-off meeting, it’s important to review the overall goals for the project, both commercial and technical details, break down functional requirements, and spend time for discussion and questions. By allowing team members to communicate questions and share ideas, it opens the lines of communication and may bring up potential concerns that might have been missed in the initial planning stages.

Conclude kick-off meetings with a definition of the next steps and be sure individuals are aware of deadlines and their assignments.

11:30 am: Reviewing project specs, budgets and scheduling submissions
Other important tasks to tackle in between meetings include reviewing specifications and budgets and schedules for future projects. If a project begins that day, now would be a good time to  apply the  finishing touches to the project documentation before presentation and approval.

When it comes to establishing project estimates and budgets, a project manager must bring all of his experience into play in order to create a realistic budget that includes wiggle room for factors such as project complexity, team experience and skill levels, stakeholders involvement, time needed, third-party services needed, and contingency allowances among many other things.

It’s Not Easy to Squeeze in a Lunch Break, but It’s Often Necessary for the Project Managers Health and Sanity

12 pm: Lunch
In the midst of the seeming chaos that is project management, be sure to fuel up for the rest of the day’s work. Lunch is also a great span of time to check in with team members to make sure they are still on target for later-day deadlines.

2 pm: Launching the next project
After digesting lunch, it’s time to launch the next project. Get the whole team ready to go live and present the project to the client and begin testing aspects of the project in a live environment. It’s a time to spot problems and address them and review schedules and deadlines and other project needs.

3 pm: Time for everything else
The final two hours in the office are spent addressing everything else on the project manager’s plate. A project manager must be good at multi-tasking and whatever duties couldn’t be accomplished throughout the day are reserved for the final hours. Most of the time, lower priority tasks are reserved for afternoon hours. These tasks could include project update meetings with various departments, logging finances, reviewing monthly project schedules, approving time sheets, writing weekly reports, sorting purchase orders and communicating with suppliers. There are so many other small to-do list items that project managers are responsible for, but are often overlooked.

Spending Time at the End of the Day as Well as the Beginning to Review and Plan Will Only Help You Succeed as a Project Manager

5 pm: Review the day, plan for tomorrow
Before heading home, review the day’s list and what’s been accomplished. Anything that has been added or was left unfinished should be scheduled for the next day or sometime throughout the week. Reflect on your team’s work and clear the email inbox. Use a filing system that makes sense for you and be ruthless about deleting stuff. The beauty of an empty inbox is a thing to behold. It is calming, peaceful and wonderful.

65% of Mega-projects Fail

There’s a reason why  Mega-projects are simply called “Mega-projects.” Extremely large in scale with significant impacts on communities, environment and budgets, mega-projects attract a lot of public attention and often cost more than 1 billion. Because of its grandiose, a successful mega-project requires a lot of planning, responsibility and work. Likewise, the magnificence of such projects also creates a large margin for failure.

Mega-projects Come with Big Expectations. But a Project’s Success Is Often in the Eye of the Beholder

Despite their socio-economic significance mega-projects – delivering airports, railways, power plants, Olympic parks and other long-lived assets – have a reputation for failure. It is thought that  over optimism, over complexity, poor execution, and weakness in organizational design and capabilities are  the most common root causes of megaproject failure.

Blinded by enthusiasm for the project, individuals and organizations involved with mega-projects often miscalculate the complexity of the project. When a mega-project is pitched, its common for costs and timelines to be underestimated while the benefits of the project are overestimated. According Danish economist Bent Flyvbjerg, its not unusual for project managers who are competing for funding to massage the data until it is deemed affordable. After all, revealing the real costs up front would make a project unappealing, he said. As a result, these projects are destined  for failure.

For example, building new railways spanning multiple countries could prove to be disastrous if plans are overly complex and over-optimized. Such a large-scale project involves national and local governments, various environmental and health standards, a wide range of skills and wages, private contractors, suppliers and consumers; therefore, one issue could put an end to the project. Such was the case when two countries spent nearly a decade working out diplomatic considerations while building a hydroelectric dam.

Complications and complexities of mega-projects must be considered thoroughly before launch. One way to review the ins and outs of a project is through reference-class forecasting. This process forces decision makers to look at past cases that might reflect similar outcomes to their proposed mega-project.

Poor execution is also a cause for failure in mega-projects. Due to the overoptimism and overcomplexity of a project, it’s easy for project managers and decision makers to cut corners trying to maintain cost assumptions and protect profit margins. Project execution is then overwhelmed by problems such as incomplete design, unclear scope, and mathematical errors in risk assessment and scheduling.

Researchers at McKinsey studied 48 struggling mega-projects and found that in 73 percent of the cases, poor execution was responsible for cost and time overruns. The other 27 percent ran into issues with politics such as new governments and laws.

Low productivity is another aspect of poor execution. Even though trends show that manufacturing has nearly doubled its productivity in the last 20 years, construction productivity remains flat and in some instances has even declined. However, wages continue to increase with inflation, leading to higher costs for the same results.

According to McKinsey studies, efficiency in delivering infrastructure can reduce total costs by 15 percent. Efficiency gains in areas like approval, engineering, procurement and construction can lead to as much as 25 percent of savings on new projects without compromising quality outcomes. This proves that planning before execution is worth its weight in gold.

We Tend to Exaggerate the Importance of Contracting Approach to Project Success or Failure

Finally, weaknesses in organizational design and capabilities results in failed megaprojects. For example, organizational setups can have multiple layers and in some cases the project director falls four or five levels below the top leadership. This can lead to problems as the top tier of the organizational chain (for example, subcontractors, contractors and construction managers) tend to focus on more work and more money while the lower levels of the chain (for example, owner’s representative and project sponsors) are focused on delivery schedules and budgets.

Likewise, a lack of capabilities proves to be an issue. Because of the large-scaled, complex nature of mega-projects, there is a steep learning curve involved and the skills needed are scarce. All the problems of megaprojects are compounded by the speed at which projects are started. When starting from scratch, mega-projects may create organizations of thousands of people within 12 months. This scale of work is comparable to the significant operational and managerial challenge a new start-up might face.

In the end, it seems that if organizations take the time to thoroughly prepare and plan for their mega-projects, problems like overcomplexity and overoptimism, poor execution, and weaknesses in organizational design and capabilities could be avoided. After all, mega=projects are too large and too expensive to rush into.

 

How To Deliver On The Promise of MegaProjects

Due to the large scale and outlook attached to them, mega-projects have a large opportunity for failure. Typically, the failure begins at the outset of the project, whether that be due to poor justification for the project, misalignment among stakeholders, insufficient planning, or inability to find and use appropriate capabilities.

Underestimated costs and overestimated benefits often offset the baseline for assessing overall project performance. This is why it is important for organizations to first establish social and economic priorities before even considering what projects will answer their needs. Once social and economic priorities are established, only then can a project be considered. Selecting projects must be fact-based and transparent in order to ensure accountability with stakeholders and the public.

Successful Megaprojects Must Have Robust Risk-analysis or Risk-management Protocols

It’s also important to maintain adequate controls. Successful megaprojects must have robust risk-analysis or risk-management protocols and provide timely reports on progress relative to budgets and deadlines. Typically, progress is measured on the basis of cash flow, which is less than ideal as data could be out of date and payments to contractors do not correlate construction progress. Instead, project managers should deliver real-time data to measure activity in the field. For example, cubic meters of concrete poured relative to work plans and budgets.

construction-646914_1920

Overall, improving project performance requires better planning and preparation in three areas: doing engineering and risk analysis before construction, streamlining permitting and land acquisition, and building a project team with the appropriate mix of abilities.

Project developers and sponsors should put more focus into pre-planning such as engineering and risk analysis before the construction phase. Unfortunately, most organizations and sponsors are reluctant to spend a significant amount of money on early-stage planning because they often lack the necessary funds, they are eager to break ground and they worry the design will be modified after construction is underway, making up-front designs pointless.

However, it’s proven that if developers spend three to five percent of capital cost on early-stage engineering and design, results are far better in terms of delivering the project on-time and on-budget. This is because through the design process, challenges will be addressed and resolved before they occur during the construction phase, saving both time and money.

It’s not unusual for permits and approvals to take longer than the building of a megaproject. However, if developers look to streamline permitting and land acquisition, that would significantly improve project performance. Best practices in issuing permits involve prioritizing projects, defining clear roles and responsibilities and establishing deadlines.

smoke-258786_1920

In England and Wales, developers applied these approaches to cut the time needed to approve power-industry infrastructure from 12 months to only nine months. On average, timelines for approval spanned four years throughout the rest of Europe. Likewise, the state of Virginia’s plan to widen Interstate 495 in 2012 was able to cut costs and save hundreds of homes thanks to land acquisition planning by a private design company.

Investors and Owners Must Take an Active Role in Creating the Project Team

When it’s all said and done, projects cannot deliver the best possible return on investment without a well-resourced and qualified network of project managers, advisers and controllers. Investors and owners must take an active role in creating the project team.

It’s not enough to have a vague overview of what the project might look like in the end. Instead, it’s necessary to review risks and costs and draft a detailed, practical approach to tackle various issues. An experienced project manager cannot do it all alone. The project team must include individuals with the appropriate skills, such as legal and technical expertise, contract management, project reporting, stakeholder management, and government and community relations among others.

Failure to Properly Plan for These Projects Could Have a Negative Impact on Society

While mega-projects are important in filling economic and social needs, failure to properly plan for these projects could have a negative impact on society.  Take  Centro Financiero Confinanzas (Venezuela), the eighth tallest building in Latin America at 45 stories, located in the financial district of Venezuela’s capital, Caracas for example.

t

To those unaware of its history, the Centro Financiero Confinanzas is actually home to over 700 families, a “vertical slum” that is a truly fascinating example of reappropriation of space in an urban environment. An ironic symbol of financial failure that was intended to represent the unstoppable march of Venezuela’s booming economy.

It’s much more than an unbuilt building, bridge or tunnel, failed mega-projects are a blow to the economic growth and social improvements of communities around the world.

Why Should I Hire a Project Manager for My Church Project?

Is it worth hiring a project manager when any seemingly knowledgeable pastor or church member might do?

The truth is, project managers can be a valuable asset to any organization. Whereas the average church member who is only familiar with certain tasks might be overwhelmed by the complexity of major organizational assignments, project managers are trained to handle programs with elaborate factors such as high budgets, increased manpower and layers of duties.

An Astounding 97% of Organizations Believe Project Management Is Critical to Business Performance and Organizational Success. (Source: PricewaterhouseCoopers)

On the flip side, some professional bodies disagree, arguing that professionals like pastors, marketers, and accountants are able to manage projects just as well as any project manager with some effort.

Barely over Half (56%) of Project Managers Are Certified  (Source: Wrike)

“It’s a raging debate,” said Tony Marks, author of the 20:20 Project Management guide.

“Some industries, such as oil and gas, are hesitant to hire outside project management specialists because they may lack industry knowledge. Instead, these industries prefer to employ technical experts and put them through project management training.”

“The danger is that these  people  are more likely to get  sucked into their comfort zone dealing with the nitty-gritty and technical detail they understand and are fascinated by when they should be managing the project,” said Tony Marks.

In addition to being trained to juggle tasks efficiently, project managers spend an enormous amount of time honing their skills. Much more goes into the craft than obtaining Prince2 or APM certifications.

According to Mike Savage of Thales Training and Consultancy, the International Project Management Association requires its professionals to have at least 15 years of experience and training. The association has four grades from D to A. At the A level, project managers must have a minimum of five years project management experience, five years of program management and five years of portfolio management.

“So to Say That Anyone Can Be a Project Manager Is like Saying Anyone Can Be a Brain Surgeon, Said Savage.”

But just because there are individuals specializing in project management doesn’t mean non-specialists can’t learn the techniques as well. Ian Clarkson of training course provider QA encourages everyone to learn project management practices.

“The skills, leadership, planning and stakeholder engagement techniques are vital to all disciplines,” he said.

“Projects which are run by engineers with project management training are less likely to be successful than the reverse,” said Lloyd’s Register energy program director Roger Clutton. “If there is a lack of technical expertise that will show up in the risk assessment. But a lack of project management skills is much less likely to be detected.”

With that, it seems that the argument on whether or not hiring an outside project management is necessary will continue. But the debate only seems relevant to rival professions as there is projected to be 15 million new project management jobs within the decade. (Source: Project Management Institute).

No matter how you look at it, though, it seems that trained and experienced project managers  must be  worth their weight in gold.

 

The Good, the Bad and the Ugly of Project Management for Christian Leaders

It’s Monday afternoon at the office. The week has only begun, but you’re already swimming in a sea of memos, spreadsheets, and schedules. Just as you’re daydreaming about what leftovers you might reheat for a late dinner, your boss pokes his head into your office. He or she mutters something about quotas and deadlines before he or she drops the bomb about a “little project” he or she needs you to complete by the end of the week. And just like that, you know you’ve been handed a nightmare but for whatever reason accept the challenge.

“According to the Cranfield School of Management in the Uk, 68% of Projects Are Destined for Failure Before They Even Start.”

The lack of project management training or experience of many Christian leaders can be an enormous stress factor for them. Whilst natural organizational ability is enormously helpful, in itself it is no guarantee of any project being both successful and low stress.

What is a  nightmare project? It’s something we’re all familiar with. The boss assigns us some vague task and a deadline but leaves the means to a solution up to our creative intellect.

So how do you solve  the problem of this dreaded “project”?

1.             Understand the scope of the project  

First things first, create a list to layout your ideas on how to go about the job at hand. Write out questions you might have that need to be answered, people you might need to work with or talk to in order to understand what work must be done.

Without fully understanding what work must be done, it is impossible to accurately estimate a project’s schedule or budget.

After creating a list, share your ideas with colleagues. Work with peers who have the same goal and share the same work ethics as you. Too often, when faced with an unrealistic project, we tend to work with just about anybody who wearily agrees to have their name on board. The enthusiasm of a new project quickly fades when actual work is needed. Instead of “How can I help?” were met with “I’m busy right now” and “Can it wait until next week?”  The sponsor, project manager, and project team must share a common understanding of the scope of the project.

2.             Get estimates from the people who will be doing the work

To avoid the stress of friendly fatigue, create a solid plan of action with your co-workers. Assign duties and responsibilities and set a deadline for each task.

4.             Re-estimate as soon as you realize an estimating assumption was wrong

Don’t get discouraged if people and other things fall through. Even though it’s frustrating with the broken promises, missed deadlines, mistakes, and poor quality outputs. As soon as you realize a mistake was made, assess the impact and re-estimate the project.

“Unfortunately When Project Managers Spend the Majority of Their Time Trying to Achieve the Unachievable, the Result Is Frustration and Potential Burnout.”

But say you’ve followed those steps and were able to remain positive throughout this grueling week. You completed the assignment, whether enthusiastically or completely drained of all energy, only to be told the higher-ups decided to go a different route and don’t need the results of your project after all. “Good effort, though,” your boss tells you as he or she hands back your laminated report.

If you find yourself in this situation, just remember to never say “yes” to a “little project without first taking a look at what you’ve been handed.

Small Projects Often Mean Greater Innovation

Small projects often embody more innovation than larger more costly or high profile ones.

Innovation is a wide concept that includes improvements in processes, products and services. It involves incorporating new ideas which generate changes that help solve the needs of a company and so increase its competitiveness. That’s hardly big news. But what may be surprising to some is that innovation has itself, well, innovated and it isn’t what it used to be.

New materials and energy, design approaches, as well as advances in digital technology and big data, are creating a wave of innovation within the construction industry. These new ideas are increasingly often tested and proven on smaller and agiler projects. Investing time and money is well spent on  these  ideas and technical improvements can then be used on large-scale developments.

Here are  three exciting small projects:

Vanke Pavilion - Milan Expo 2015 / Daniel Libeskind
Vanke Pavilion – Milan Expo 2015 / Daniel Libeskind
Vanke Pavilion - Milan Expo 2015 / Daniel Libeskind
Vanke Pavilion – Milan Expo 2015 / Daniel Libeskind
VANKE PAVILION Milan, Italy
VANKE PAVILION
Milan, Italy

1. Vanke Pavilion – Milan Expo 2015

The  corporate pavilion for Vanke China explores key issues related to the theme of the Expo Milano 2015, “Feeding the Planet, Energy for Life”.

Situated on the southeast edge of the Lake Arena, the 800-square meter pavilion appears to rise from the east, forming a dynamic, vertical landscape.

The original tiling pattern would have resulted in thousands of ceramic tiles of different sizes and shapes. The resulting complexity and lack of repetition could have led to high costs and a longer erection time.

Working with Architects Studio Libeskind, Format Engineers  (Engineering Designers with backgrounds in structural engineering, coding, mathematics, and architecture) changed the pattern from thousands of different tiles to less than a dozen and  simplified the  backing structure generating  huge cost savings. Format Engineers also proposed ‘slicing’ of the building and then fabrication of  the primary structure of steel ribs using  low tech flat steel plate elements.  These were then used in a series of long span portalised frames reminiscent of the ribs and spars in traditional boat building  resulting in a  column-free area for the display of Chinese Cultural Heritage.

The frame was built to a budget and without difficulty ahead of the neighboring Expo buildings.

Building Size
12 meters high
740 mq gross floor area (exhibition, service & VIP levels)
130 mq roof terrace

Architect:  Studio Libeskind

Engineer:  Format Engineers

Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion

2.  Oxford Brookes Rain Pavilion

The Rain Pavilion is an urban forest sculpture forming the front entrance to Oxford Brookes University’s Architecture Faculty.

“Rain Pavilion artwork is a sensory experience for the community.”

The complex form required extensive wind modeling and comprehensive structural analysis within a generative 3d model. This was allied with Format Engineers in-house code for the self-organization of voids and their subsequent redistribution.

.At each stage of the design process different modeling and analysis techniques were used to exploit the form and to optimise the structure. The considerable challenges posed by the slenderness of the structure and its dynamic behavior under wind were resolved by combining Computational Fluid Dynamics (CFD)  (a branch of  fluid mechanics  that uses numerical analysis and algorithms to solve and analyze problems that involve  fluid  flows) with a generative design environment. Conceptual design introduced the ideas of tubular stems and folded steel canopies, both of which were  perforated by circular holes arranged to allow the interplay of light and water through the structure. The voids were generated using a self-organizing process.

Grasshopper  (a graphical algorithm computer 3-D modeling tool)  was used  to produce a mesh that could include the voids in both the stems and the petals.

The Rain Pavilion is designed to celebrate the sound of rain, and the noise of water interacting with different sections of the installation is part of the experience of passing through it. The structure has a design life of five years and can  be transported to other locations.

Architect:  Oxford Brookes University, Oxford, UK

Engineer:  Format Engineers

KREOD Pavilion
KREOD Pavilion
KREOD Pavilion
KREOD Pavilion
KREOD Pavilion
KREOD Pavilion

3.  KREOD Pavilion

The KREOD pavilions were first erected on the London Greenwich Olympic site in 2012.  Easily rearranged, three pod-like pavilions were formed with a wooden structural framework comprised of an open hexagonal composition.

Standing three meters tall, each double-curved wooden shell enclosed a footprint of 20 square meters,  totaling 60 square meters. A  waterproof tensile membrane sealed the interior from the elements fully portable with demountable joints,  the individual components can be  stacked for efficient transportation.

Chun Qing Li the architect required a temporary exhibition or function space that could be erected and demounted mostly by hand and by untrained staff. The quality of finish needed to  echo that of handmade furniture and had to be low cost and quick to erect. The continuously changing double curved form of the enclosure meant that in theory, every nodal connection was  different. A conventional bolted solution would have cost hundreds of pounds per fixing. Format Engineers  suggestion of a ‘reciprocal’ jointed timber grid shell required standard  bolts which equated to a fraction of the normal cost. It also allowed the structure to be built from simple and light flat timber elements.

The structure used Kebony timber throughout, a sustainable alternative to tropical hardwood. As this material had not previously been used in a structural context Format Engineers undertook load testing of the material and the connections at the University of Cambridge. The timber was fabricated using CNC routing (a computer controlled cutting machine)  allowing a highly accurate fit between members and basic  erection on site.

Architect:  Chun Qing Li  

Engineer:  Format Engineers

 

The Good, the Bad and the Ugly of Agile Methodologies

The Good, the Bad and the Ugly of Agile Methodologies

The “agile” buzzword has really taken hold among a myriad organisations worldwide. That result is not particularly surprising. Who wouldn’t love to employ light and fast tactics that allow them to respond to rapidly changing challenges? Despite all the optimism about agile methods, the bigger question is how well companies are actually doing when it comes to employing these methodologies in the real world. Without understanding what the core objectives of embracing agile methods are, it’s not going to be easy to gain results.

Agile methodology is employed in order to reduce the time, risk, and cost that is associated with a project. However, these massive benefits are not going to materialise out of thin air. They are the result of the dedicated work of a team who is well versed in implementing the methodology.

To become “agile” will require organisations to take a quantum leap in their culture. They will have to embrace the entire philosophy behind these methods or no real change will take place. Truly agile companies are the ones that have gone through a transformative process in order to implement brand new processes that say goodbye to the past. This takes a lot of work and effort and not all organisations are willing or able to do this.

Ugly Agile Implementations

Project teams that are solely focused on results and who don’t do their homework end up with very ugly agile implementations. These teams are so excited about agile as a concept that they convert everyone in their organisation into adopting the methods. The problem is, they do not spend the requisite time getting everyone on board with exactly what needs to be done.

Because of this oversight, the projects are plagued with poor communications and engagement. The project team and others in the organisation are each working on their own tasks with no thought to how the pieces fit together in the “big picture.” This is a major problem because agile methods really only shine when the whole organisation works as one well-oiled unit. In this scenario, major issues at the core of the project are neglected and the entire project goes off the rails. This leaves a bad taste in the mouths of managers, who are no longer excited about agile methods.

Really ugly agile implementations have the wrong focus. Because of this myopia, the true benefits of agile employment are never realised. Before long, things, unfortunately, go back to “normal.”

Bad Agile Implementations

Some businesses completely miss the boat when it comes to agile deployment. They’re interested in receiving the benefits of reduced costs, faster time to market, and cutting “red tape.” Despite this knowledge, they’re not truly committed to the all of the values that are espoused by the Agile Manifesto. Without this commitment, they cannot possibly hope to fully embrace a functional implementation.

Organisations like to invest in education and communications, but they ignore important concepts like utilising the tools that help them truly embrace agility. They even form teams that understand cross-functionality, but without empowerment they are unable to make vital decisions.

Lastly, organisations that do poor agile implementations perform project reviews regularly enough, but the input from the meetings is never acted on by anyone. The key issues that are preventing proper implementation are never properly addressed and the project fails on its promise. Organisation members swear off the agile methods forever at this point.

Good Agile Implementations

When business personnel and IT staff work together, good implementations of agile are the result. These units work together so that a project delivery methodology is presented to the organisation that meets its needs. They also spend the time to create the cultural changes needed to ensure the methods are successful.

In organisations like this, team members, business end users, along with senior management and key stakeholders received a continuous education that empowers them all. Cross-functional teams that excel are the results. These organisations also invest in the techniques and tools that fully support agile. That includes test driven development, continuous builds, new standards, and more. With these in place, a platform that ensures long-term success will be installed.

Particularly telling, these businesses conduct regular project reviews which they conceptualise as opportunities to improve instead of something that simply has to be done. When change is needed, they embrace it and plan for it. When it arrives, they are ready and the organisation continues to excel. A sign of a good agile implementation is when the organisation is  commits to making long-term changes that will benefit the methodology in the long run.

It doesn’t pay to underestimate just how difficult implementing good agile really is. Since major internal changes to how project delivery is done need to be embraced, the road ends up being a challenging one. Traditional managers will be challenged because empowered teams now have more input than ever before.

Once a good agile implementation is in place, the benefits are obvious and plentiful. An energised, cross-functional community of empowering people who are all focused on common goals get more done than ever before. Good implementation put platforms into use that improve project delivery because they allow for test-driven development, continuous integration, standards implementation, and best practice design applications.

Top 10 Project Management Myths Debunked

Since the dawn of time, mankind has used myths to make sense of the uncertainty that surrounds us.  In the early 1990s  a lot of  people believed that project management was the best kept secret in business.  However,  because project management was not  seen as a  prevailing profession at that time, it suffered from a lack of awareness  which was  in a sense, a double edged sword. Those who were knowledgeable in the practice of project management became extreamly valuable to organisations and pioneers for  the profession.

These early adopters were able to convince organisations that project management practitioners were needed.  Myths around project management began to form in the business community  and as the role of the  project manager was unclear, questions were raised as to what project management was  and what it could offer organisations.

The definition of the word myth is a “widely held, but false belief or idea.” Here, we’re going to examine 10 of the most pervasive PM myths that have emerged.

Myth #1 – Contingency pool is  redundant  

This is one of the most ‘mythical’ myths that has plagued the industry  for a long time. Coupled  with the tendency to presume that ‘real work’ is tantamount to implementation or building something concrete and you have the perfect recipe for project disaster.  The thought pattern behind this approach typically originates from budget constraints and/or having unrealistic expectations. As we all know, or should know, the unexpected happens quite regularly. An effective contingency plan is important as it aims to protect that which has value (e.g., data), prevent or minimise disruption (e.g., product lifecycle), and provide post-event feedback for analysis (e.g., how did we fare? did we allocate funds correctly?).

Myth #2 – Project Management software is too expensive

If your idea of project management software involves purchasing servers, and purchasing a software application from a major vendor for a small practice with 10  practitioners  then, yes, it  is too expensive. If, however, you have gone cloud and elected to use a powerful web-based project management solution (such as Smartsheet), then you are likely to save thousands of pounds while reaping the benefits of a pay-as-you-go price structure. The present, and future, lie in cloud solutions that provide equal, or superior, functionality at a fraction of the cost.

Myth #3 – Project Management methodologies will slow us down

Project  managers  have  a reputation of using  process-intensive  methodologies  that favour ideology over pragmatism. In some instances this may, indeed, be the case when  there is a mismatch between a specific project management approach and the organisation’s acutall needs (e.g., a process-driven method, such as PRINCE2, may not be appropriate for a slightly chaotic environment that favours an adaptive approach, such as Scrum). So, in sum, put down the paint roller (“Project Management isn’t for us!”) and take out your fine-bristled brush (“The Critical-Chain method may not be our cup of tea, but Agile on the other hand”¦”).

Myth #4 – Facts and figures are more important than feelings and perceptions

While facts are very important, projects are often derailed and sabotaged because of false perceptions.  The PM must pay attention to both fact and fiction to navigate through turbulent  organisational change.

Myth #5 – Project managers need to be detail oriented and not strategic in nature

While it is of the utmost importance for the project manager to understand how to read the details of the project, they must also understand how the project supports organisational objectives.  Having a strategic perspective adds great value to the skill-set of the project manager.

Myth #6  Rely on the experts in everything that you do

It is true, we do need to rely on the experts but our trust can not be a blind faith.  The job of the project managers in this area is twofold.  First we must extract information and second we must verify that the information is accurate.  A good example of this is asking a planner  to provide an estimate on the effort required to perform a task.  In some instances team members forget to include tasks which ultimately results in a faulty estimate.

Myth #7  All the battles have to be fought and won so that we can succeed

Project managers sometimes make the assumption that they need to stand firm to get the job done, however, coming to compromise  on a particular issue is often a better course of action  in order to  win the war.

Myth #8 Project Managers  can wear multiple hats  

Wearing different hats can be extremely confusing.  This is especially true if the project manager is asked to be a business analyst or technical expert on top of serving in their PM role.  They end up doing  both roles with mediocrity.  When we “wear two hats” we essentially tell ourselves that both hats fit on one head at the same time. However, what happens if the demands of two roles conflict  and what assurances do we have that we’re managing the inherent conflict of multiple roles  and the  risks the  roles introduce? Sadly, multiple roles become more common as we move up the management hierarchy in an organisation, and that’s exactly where potential conflicts of interest can do the most harm.

Myth #9  Once the risk register is created, it’s full speed ahead

Risk management provides a forward-looking radar. We can use it to scan the uncertain future to reveal things that could affect us, giving us sufficient time to prepare in advance. We can develop contingency plans even for so-called uncontrollable risks, and be ready to deal with likely threats or significant opportunities.  Too often, it’s not until a catastrophic event occurs and significantly impacts project progress that ongoing risk reviews are conducted.

Myth #10 Project managers can not be effective in their role unless they have specific technical expertise in the given field that the project falls  within

You don’t need to be an engineer to manage a construction project or a IT  technician to manage a software development project.  All you need is a  fundamental  understanding with strong PM skills to manage  the team.  Experience in the field helps but does not guarantee success.

Project management is challenging enough without the myths. The profession has come a long way since the 1990s and some of these myths are fading. However, we still see remnants of them in one form or another.  Great projects cut through false assumptions and confusion, allowing their teams to make smart decisions based on reality.

These are just 10 project management myths, what are yours?  

13 Basic Facts You Should Know about Modular Homes

The concept behind a tiny garden pavilion in London, UK was simplified by the following equation: shed + office = Shoffice.

Modular homes sometimes referred to as “factory-built construction“,  encompass a category of housing built in sections typically at a factory  location.   These houses must conform to local and regional building  codes for the country the buyer plans to situate the dwelling.  

Just like site-built housing, construction teams build modular homes to  last and increase in value over time.   As the factory finishes building sections of the house, each piece is transported to the homeowners build site on large truck beds.   Local building contractors then assemble the house and inspectors ensure the manufacturer has built your residence to code.   Most customers find that modular housing is less expensive than  site-built homes.

modularhomes7

1. Benefits of Construction

One of the benefits of  construction is that manufacturers build them indoors in an enclosed factory setting, where the materials  used to build the homes are not subject to adverse weather during construction.  

Most building contractors can finish erecting a house in as little as 1-2 weeks, though it may take up to 4 weeks or more for local  contractors to finish building the dwelling on-site once it has been  delivered.

modularhomes9

2. Differences Between Modular and Site Built

Modular homes are not the same as site-built homes, which contractors create 100% at the build site.   That means the
contractor must collect all the materials for a house and built it on-site.   Like a modular home, the site-built home must conform to all regional, state and local building codes.   Many refer to site-built construction as stick-built homes.   Stick built housing is also well-built and designed to last a lifetime.

modularhomes2

3. Difference Between Modular and Manufactured

modularhomes14
Manufactured housing is another form of factory construction.   Many  consumers have mistakenly referred to these homes in the past as mobile homes.   Others refer to manufactured homes as trailers.   Manufacturers do build these houses in a factory like modular homes on a steel chassis.  

The manufacturer then transports sections of the home to the building site as completed.   These dwellings are usually less expensive than both modular housing and site built housing, in part because they don’t come with a permanent foundation.   Trailers and mobile homes are more likely to depreciate than modular or site built homes.

4, Advantages of Modular Construction Over Site Built

Modular homes offer many advantages over traditional site built dwellings. Many consider modular homes a hybrid breed of housing.   Not a manufactured house and not a site built house, these homes offer consumers multiple benefits including costs savings, quality and convenience.   In many ways modular homes surpasses site built housing in quality and efficiency.  

Modulars have grown up. They are more and more becoming a mainstream  selection for first time and secondary homebuyers.   Most people now realise they don’t’ have to give up design quality or customization to buy a prefabricated house.   One of the biggest misconceptions people have of prefabricated housing is they are look alike.   “Boxy” is not a word that can begin to describe prefab dwellings. In fact, more suitable descriptions of these buidlings would include: “Elegant, durable, customised and high-class”.   Many people find they can afford to include more specialization and customization when they buy a factory built house over a traditional stick built construction.  

modularhomes41

5. Cutting-edge Designs

Looking for a building design with a little pizzazz?   You need to check out the latest architectural designs associated with prefabricated buildings.   Firms are now building more    elegant and unique designs to meet the increasing demands of selective customers.   People are selecting modular designs over stick built designs to build their dream homes.

green-prefab-homes-contemporary-ideas-on-home-design-ideas

6. Customised Design and Modification

There are hundreds of companies that offer modular prefabricated construction kits and plans, and most employ various architects and specialized designers to help customize your  home.   That means you have more choices and a wider selection of designers to choose from.   If you don’t find a style you like with one designer you can often move onto another, without even switching  manufacturers.  

green-prefab-homes-contemporary-ideas-on-home-design-ideas

7. Huge Range of Selection

Its always best to select a home that matches your lifestyle and design preferences.

8. Rapid Customisation  

These are often the ideal selection for homeowners in need of a speedily designed homes.   You simply can’t build a dwelling faster.   Site built housing can take months to design and build.   A manufacturer can design and place a prefab house in a few short weeks. You can pick from just as many different styles as you would a site built home if not more, but don’t have to wait weeks for contractors to build your custom house.

9. Precise Budgeting and Timing

Yet another benefit of these designs is the lack of guesswork involved.   You don’t have to worry about how something will look.   You know that everything will arrive to the build site complete and you will know the exact outcome. You also don’t need to worry about unexpected expenses, which is commonly the case with site built homes.   With a prefabricated house, you know exactly what your home will cost and can control that cost from the point of buying to final construction.   This isn’t the case with stick built housing. With stick built housing you also have to worry about surprises in the middle of construction.   It isn’t uncommon for example, for a contractor to quit in the middle of a project.   If this happens you have few choices.  

Your home will sit partially built until you are able to find a new construction team.   This alone may cost you valuable time and money.  

10. Improved Energy Efficiency    

Many prefab houses also come with what manufacturers call the “Energy Star” certification.   This is a national company that promotes energy efficiency.   Buildings with this label use 30-40 percent less energy yearly than traditional stick built housing.  

This saves you time and money.   Some key features of prefabricated housing that help improve energy efficiency include tight installation,  high performance and weather resistant windows, controlled air systems and duct systems, upgraded air-conditioning and heating units and use of efficient lighting and heating appliances.   As a bonus, these features not only save on annual energy costs but also improve the quality of your indoor air. Think energy efficiency isn’t significant?   Think again.   Over the lifetime of your house you could save thousands of pounds  in energy bills by buying a prefabricated dwelling.

11. Design Modification is Easier  

Most prefab homemakers now use computer aided design systems when conducting operations.   This adds to the efficiency of construction and improves the appearance and architecture  of homes.   Prefabricated construction ranges from plain vanilla styling to intricate and complex modern designs.

12. On Time and  on Budget    

Perhaps the two biggest features or benefits of prefabricated housing that manufacturers hone in on are the speed that  they can be built with and the competitive pricing they can offer on the final product.   This is one reason that modular homes are gaining popularity.  

13. Appreciate in Value

These dwellings also appreciate much like site  built housing designs.   Most homeowners are interested in building value in their house over time.   Prefab housing afford you the opportunity to do this (keep in mind however much appreciation is dependent on real estate location).   Select a good build site and your house will gain significant value over time. Other factors may also affect appreciation including landscaping and how well the house is cared for year after year.   These factors also affect site built housing.   Unlike mobile homes, which depreciate, a modular homeowner can expect to gain value from their home year after year. Study after study suggests that modular homes appreciate just as well as site built homes.   They are also just as easily insured and financed.

As far as risk goes, you are no more at risk buying prefabricated housing than site built construction.

Modular Home Facts

  • Modular homes appraise the same as their on-site built counterparts do.
  • Modular homes can be more easilly customised.
  • Most modular home companies have their own in-house engineering departments that utilize CAD (Computer Aided Design).
  • Modular home designs vary in style and size.
  • Modular homes are permanent structures – “real property.”
  • Modular homes are considered a form of “Green Building.”
  • Modular homes are faster to build than a 100% site-built home.
  • Home loans for modular are the same as if buying a 100% site-built home.
  • Insuring your modular home is the same as a 100% site-built home.
  • Modular homes can be built to withstand 175 mph winds.
  • Modular homes can be built for accessible living and designed for future conveniences.


Would you consider a modular home for yourself, or are you more of a traditionalist?

 

As seen on