If You Want to Make Enemies, Try to Change Something: 17 Inspiring Change Quotes to Live By
- “One of the reasons so many celebrities keep going in and out of rehab is that they leave out the critical element to lasting change: God.” – Unknown
- “There is nothing more difficult to take in hand, more perilous to conduct, or more uncertain in its success than to take the lead in the introduction of a new order of things.” — Niccolo Machiavelli
- “Change has its enemies.” — Robert Kennedy
- “He who rejects change is the architect of decay.” — Harold Wilson
- “Change is not made without inconvenience, even from worse to better.” — Samuel Johnson
- “The world hates change, yet it is the only thing that has brought progress.” — Charles Kettering
- “God supplies everything you need for successful change, and when you make changes with his help, it says changed.” – Unknown
- “It is always easier to talk about change than to make it.” — Alvin Toffler
- “It must be considered that there is nothing more difficult to carry out nor more doubtful of success nor more dangerous to handle than to initiate a new order of things.” — Machiavelli
- “The path of least resistance is the path of the loser.” — H. G. Wells
- “When you feel weak in the face of change, God is omnipotent, or all-powerful. “If God is for us, who can be against us?” the Bible says. (Romans 8:31, NIV) Knowing the invincible God is on your side gives you tremendous confidence.” – Unknown
- “Paralyze resistance with persistence.” — Woody Hayes
- “Culture does not change because we desire to change it. Culture changes when the organization is transformed – the culture reflects the realities of people working together every day.” — Frances Hesselbein
- “The greatest danger in times of turbulence is not the turbulence – it is to act with yesterday’s logic – Peter Drucker
- “The rate of change is not going to slow down anytime soon. If anything, competition in most industries will probably speed up even more in the next few decades.” — John P. Kotter
- “Your success in life isn’t based on your ability to simply change. It is based on your ability to change faster than your competition, customers, and business.” — Mark Sanborn
- “If you want to make enemies, try to change something.” — Woodrow Wilson
Don’t make change harder than it has to be. Do it the right way. Ask God for help.
How Technology Has Changed Procurement in the Last 10 Years
Over the past decade business procurement has experienced rapid technological upheaval that, in the main, has made life easier for everyone involved.
The first ever Global Procurement Technology Summit was held in March 2016. It shows the emphasis procurement is now putting on understanding and utilising new technologies, and that it’s clearly a huge talking point for professionals across the world.
Looking in greater detail: which technology has been responsible and what has the effect been on procurement and buying professionals?
1. More informed decisions are being made
The digitalisation of procurement processes and integration of data-sharing across buyer behaviour, ratings and history of purchases over extended periods of time, has made for smarter and more informed decisions.
Despite the greater insight into decision-making, a study of US procurement professionals still revealed accurate forecasting to be the biggest challenge, something that’s possibly down to the rise in budget responsibilities over the last ten years.
The Coupa ‘Top 5: Constants and Change in Cloud Procurement’ report revealed that in 2003, budgets were reported as an average of $31m, compared to $100m in 2013.
2. Response times have drastically reduced
Procurement solutions are now quicker and easier than ever thanks to new marketplace technologies.
Buyers can take advantage of online purchasing possibilities, using websites like Amazon to source, purchase and arrange delivery of items.
The speed of procurement reflects the new speed in which consumerism moves ’’ the integration of digital mediums with online shopping has made the process of deliberation through to transaction much easier, a trend which has been reflected in the world of procurement.
3. Integration has brought its own problems
Technological integration has created many positives for procurement, but it’s also created challenges.
Millennials will make up 40% of the workforce by 2020, which is great for improving current procurement solutions as younger generations have higher expectations for technology and are early adapters.
However, the average age of procurement professionals in the UK is currently 44 – much older than the next generation of workers, who fully understand the capabilities of technology, and who will be easier to train and able to work with increased speed and accuracy.
The gap will close in the coming years, but procurement faces a struggle as older workers need to ensure their skills are relevant to the changing world around them.
Additionally, Hays’ ‘Procurement Salary Guide’ revealed that demand for procurement professionals has increased at all levels within the public sector, pushing salaries up. This demand is the result of a squeeze on public finances and attempts to cut costs following the slowdown in the economy.
4, Technology and the future of procurement
To conclude, technology is clearly a powerful enabler that’s here to stay. Plenty of companies are now seeing the importance of procurement technology as a means to improve their bottom lines, which was reflected in the inaugural Global Procurement Technology Summit earlier this year.
Integration of contract management, risk management and supplier lifecycle systems through investment in improved systems with added capabilities, has ensured more accurate sourcing is possible and due to the skills involved in running these systems, has driven salaries up.
Sophia Chapman is a guest contributor from Portfolio Procurement, expert recruiters in the compensation, benefit and reward sector.
The New Day: How Should I Think About My Failures?
Everyone wants to be a success. I have never met anyone who purposely set out to be a failure. Undoubtedly, this is why so much has been written on the topic “How to be a Success” and why these books are so popular.
However, The New Day daily newspaper closed just nine weeks after launching, Trinity Mirror confirms.
The New Day was a British compact daily newspaper published by Trinity Mirror, launched on 29 February 2016. It was aimed at a middle-aged female audience and was politically neutral. The editor, Alison Phillips, intended readers to get through the newspaper in under 30 minutes.
The new paper was initially available for 25p for two weeks, then rising to 50p. Two million copies of the New Day was given away on the first day, as the turquoise-branded upstart attempted to spark a revival in readership and gain ground against the mid-market Mail and Express offline.
Arrogance about their own ability to rescue a situation can prevent leaders from changing course
The New Day had no leading articles, no website, and columnists and believed it could successfully drag readers back to print? The sad truth is that it did not attract enough attention and failed to create a daily newspaper that could co-exist in the digital age, especially as tabloids and broadsheets continue to suffer a significant circulation decline.
Shareholders at Trinity Mirror’s annual meeting called the failure “demoralising”. Analysts said it was “embarrassing”.
Assume for a moment that the leaders of The New Day had no idea about the changes swamping the print media as a result of the digital revolution, and carelessly decided to invest millions into the venture without undertaking a risk assessment and also decided to ignore every indication that the paper was failing. That would have been embarrassing and demoralising.
However, the leaders decided to fail quickly and shut down the project they started.
Abandonment is a rare, difficult and a valuable management skill. The natural instinct of most people is to persist, particularly when the project is a collective commitment, as most corporate ventures are, but then it becomes even harder to hit the red “stop” button.
The New Day’s editor, Alison Phillips, said in a statement posted on Facebook that the team “tried everything we could” but were unable to reach the figures needed to make it work financially.
We dread failure. We don’t like talking about it. Some of us will internalise and rethink our failures in our heads time and time again. Others will swipe them away, moving onto the next thing immediately. In the public, we prefer sweeping our failures under the rug, silently, while nobody is watching.
While this might save our feelings momentarily, this is not the way learn and innovate.
According to Albert Savoia – ex Googler and innovation expert, most project innovations will fail.
“Most New Things Will Fail – Even If They Are Flawlessly Executed.” – Albert Savoia – Ex Googler
Does this mean you should stay away from trying new things (and failing in the process)? Certainly not. It just means you need to accept failure will inevitably be a part of the process.
In most cases, however, a combination of arrogance about personal ability to rescue the situation and blindness to the lengthening odds of success stops leaders from changing course.
The natural lifespan of most projects is finite, and the rarities are companies that survive.
The Art of “strategic Quitting” Will Become More Important as Careers Fragment and Companies Exert More Discipline
So if an idea is doomed, organisations usually treat the person who pulled the plug early on as a hero right? Not exactly, it’s complicated.
Roy Greenslade, Professor of Journalism at City University London, wrote a report in The Guardian explaining how The New Day had failed. He pinpointed the error of marketing a newspaper to people who inherently despise newspapers, and the short period of time between the announcement and launch, leaving no time to advertise the product. It was also published early in the evening thus missing out on late-night breaking news such as Leicester City F.C.’s shock win of the Premier League.
“Nothing so powerfully concentrates a man’s mind on innovation as the knowledge that the present product or service will be abandoned in the foreseeable future.” – Peter Drucker
The first thing the Bible wants to say is that all of us have failed. None is without failure. If you think you haven’t failed, two things are true of you. One is you are blind to your failures and the other is you probably haven’t taken enough risks to try enough hard things so that you would be aware of your failures.
Peter Drucker’s influence on business management is legendary. Peter realised that “systematic abandonment” a regular, unsentimental spring-clean is critical to the fostering of new business ideas.
Conclusion, every organization needs to have a regular “rummage sale” to determine which products, services, and programs are worth keeping and which ones must be abandoned.
Willow Creek Interviews Jack Welch, Former GE CEO
Jack Welch, the salty former CEO of GE, sat down for an interview with Bill Hybels, senior pastor of Willow Creek Community Church, for the 2010 Leadership Summit and served up more truth and wisdom in 30 minutes than most seminary classes give over a semester.
Known for his own brutal candor, Welch emphasized authenticity and candor in leaders.
“You’ve got to be yourself. You’ve got to be comfortable in your shoes,” he said. “You’ve got to not portray yourself as something other than what you are. People can see through a phony in a minute.” and “Nothing is worse than negative energy,” Welch stressed.
Meanwhile, the top 20 percent are those who are filled with energy and likable, who love to reward and celebrate their people, aren’t mean-spirited or cheap and aren’t afraid to have great people around them, he said.
The mean-spirited hide the good people. But the top workers don’t have a lot of envy.
“Envy’s a terrible thing,” he pointed out.
Jack Welch impact on society has been no doubt been tremendous, but good deeds and riches do not grant you automatic access to the Kingdom of God.
“Before you are a leader, success is all about growing yourself. When you become a leader, success is all about growing others.”
In another interview with Dan Rather on the CBS program 60 Minutes, Jack Welch, the former CEO of General Electric, said that the most difficult question he was ever asked was, “Do you think you will go to heaven when you die?”
“Welch replied and said had been a really good person, had done a lot of good things for others in his most influential years in the business world.”
Whilst Welch isn’t a Christian, he has now started attending First Presbyterian Church for the past several months after he was hospitalized for 104 days for a spinal infection called discitis.
When asked if the health scare opened him up to things of God, he said, “Maybe.”
Europe’s Biggest Stadium Will Be Even Bigger Within Five Years at a Reported Cost of Nearly ┚¬420 Million
A Japanese architecture firm Nikken Sekkei and Barcelona studio Pascual i Ausió Arquitectes have been selected to renovate the Camp Noustadium, home of FC Barcelona following a joint bid.
Europe’s Biggest Stadium Will Be Even Bigger Within Five Years at Reported Cost of Nearly ┚¬420 Million ($460 Million)
Camp Nou, often referred to as the “Nou Camp” in English is a football stadium in Barcelona, Catalonia, Spain. It has been the home of FC Barcelona since its completion in 1957. With a current seating capacity of 99,354 and is the largest stadium in Spain by capacity. It’s also the largest stadium in Europe and the second largest association football stadium in the world in terms of capacity. In additional it has hosted numerous international matches at a senior level, including a 1982 FIFA World Cup semi-final match, two UEFA Champions League finals and the football competition at the 1992 Summer Olympics.
Barca is expected to sell the stadium’s naming rights to help fund the new construction.
Nikken Sekkei, one the world’s third largest architecture firm according to the World Architecture 2016, is known for its construction of stadiums and skyscrapers and were chosen out of a list of 26 candidates. Nikken is over 100 years old and has offices in China, Vietnam, Korea, Saudi Arabia and Dubai, in addition to its headquarters in Japan.
Construction is to start in the 2017-18 season and be completed for the 2021-2022 season, but will not keep the club from hosting games.
The iconic home of the Spanish and European champions will involve increasing seating capacity from 99,354 to 105,000. The reigning European and Spanish champions promise that every seat will offer an unobstructed view of the pitch and new high-definition video scoreboards. Barca is on course to repeat its treble of last season, winning the La Liga title, Spanish Cup and European Champions League.
A Statement on the Club’s Website Said, “the Nikken Sekkei [and] Pascual I Ausio Arquitectes Proposal Stands out for Being Open, Elegant, Serene, Timeless Mediterranean and Democratic.
“The proposal presents a very subtle attempt to intervene in the environment to facilitate circulation and achieve diverse urban usage in the Barça Campus and guarantees a clear and safe construction.” according to the club.
The triple-tier structure will remain, but the third tier will be extended and a roof covering more than 47,000 square metres will be added to make sure all seats are sheltered from the weather.
The project also includes an ice rink, basketball court and an auxiliary multipurpose court capable of hosting 2,000 spectators. The Espai Barça also foresees construction of an underground parking lot.
Other current high-profile football stadium projects include the new Chelsea FC ground by Swiss architects Herzog & de Meuron, a stadium for Tottenham Hotspur by Populous, and Arup’s design for AC Milan’s new building.
29 of the Best Ministry Interview Questions
Need help figuring out what to ask candidates during the interview?
You can bet that most candidates are well-versed in how to answer standard interview questions like, “What’s your greatest strength? Weakness?” or “Why should I hire you?” or even “Where do you see yourself in five years?”
Because questions like these are so often used to gauge a candidates potential to perform well in a particular sector, answers are usually very scripted, insincere, and most cases tailored to what you’re looking for in a candidate. And, unfortunately, that doesn’t tell you a whole lot.
The best candidates are like axles: If you want to route out the good candidates from the mediocre ones, you’ll need to spark a more authentic and revealing discussion.
How? the answer is simple, ask better questions!
- “Why are you here?”
- “What’s your definition of hard work?”
- “Tell me a little bit about your career path, how did you move into this field?”
- “How do you take advantage of your strengths? How do you compensate for your weaknesses?”
- “What’s the one accomplishment you’re most proud of? Why?”
- “Describe one of your most challenging jobs? Why was it challenging and how did you pull the job through it?”
- “Tell me about the kinds of performance metrics you use to see if the job is on track?”
- “Tell me about a time when you encountered a serious conflict and how you dealt with it.”
- “How do you handle a situation where the client does not want to surface and address Risk?”
- “How do you make decisions?”
- “How do you deal with client employees with low motivation or low skills?”
- “What is motivating your job search?”
- “What qualities in your co-workers bother you most? Do you appreciate most?”
- “If I were to ask your current boss what your greatest strength is, what would he or she tell me?”
- “What types of jobs don’t you want to work on?”
- “Tell me about a work incident in which you were totally honest, despite a potential risk or downside?”
- “What will make you love coming to work here every day?
- “If you were limited to just one person to get advice and help from, which person would you choose? Why?”
- “What’s your greatest fear about this opportunity?”
- “Tell me about a time you screwed up?”
- “Was there a time you thought the program was going “too fast?” What happened?”
- “Describe a time when you were asked to do something you weren’t trained to do. How did you handle it?”
- “What would you do if management made a decision you didn’t agree with?”
- “What changes have you made in working with others to be more effective at work?”
- “If you had only one word to describe yourself, what would it be?”
- “What is there about this opportunity that most excites you?”
- “Describe the boss who would get the very best work from you?”
- “What can you tell me about this job that isn’t in the description?”
- “Is there any question I haven’t asked you that I should?”
What do you think are the most revealing interview questions to ask job candidates? Share in the comments!
Has Nigeria Become the World’s Junk Yard of Abandoned and Failed Mega Projects worth Billions?
Dim1, N. U., Okorocha2, K. A., & Okoduwa3 V. O.
The Nigerian construction industry is mostly concerned with the development and provision of projects such as roads, bridges, railways, residential and commercial real estates, and the maintenance necessary for the socio-economic developments contributes immensely to the Nigerian economic growth (Bureau of Statistics, 2015). Butcher and demmers (2003) described projects as an idea which begins and ends by filling a need. However, a project fails when its idea ends without meeting the needs and expectations of its stakeholders.
Nigeria Has Become the World’s Junk – Yard of Abandoned and Failed Projects worth Billions of Naira!
Hanachor (2013), revealed that projects form part of the basis for assessing a country’s development. However, a damming report from the Abandoned Projects Audit Commission which was set up by the Ex-President Goodluck Jonathan in 2011 revealed that 11,886 federal government projects were abandoned in the past 40 years across Nigerian (Abimbola, 2012). This confirmed the assertion by Osemenan (1987) “that Nigeria has become the world’s junk –yard of abandoned and failed projects worth billions of naira”.
Abandoned projects including building and other civil engineering infrastructure development projects now litter the whole of Nigeria.
Physical projects do not only provide the means of making life more meaningful for members of the community where the projects are located, successful projects also result in empowerment and collective action towards self improvement (Hanachor, 2013).
This Issue of Abandonment Has Been Left Without Adequate Attention for Too Long, and Is Now Having a Multiplier Effect on the Construction Industry in Particular and the Nigeria’s National Economy as a Whole. (Kotngora, 1993)
PROJECT FAILURE
Project Failure might mean a different thing to different stakeholders. A project that seemed successful to one stakeholder may be a total failure to another (Toor and Ogunlana, 2008). Some stakeholders, more especially the project users and some private owners, think of failed projects as a situation where a completed building project collapsed, a situation where by a completed dam project stopped working after few days of completion, or a completed road project that broke down after few months of completion. Other experienced stakeholders, such as engineers and architects conform to the iron triangle by Atkinson (1999) which states that the most strategically important measures of project failure are “time overrun”, “cost overrun”, and “poor quality”.
Turner (1993) noted that a project fails when the project specifications are not delivered within budget and on time; the project fails to achieve its stated business purpose; the project did not meet the pre-stated objectives; the project fails to satisfy the needs of the project team and supporters; and the project fails to satisfy the need of the users and other stakeholders. Lim and Mohamed (1999) cited in Toor and Ogunlana (2009) clarified that there are two possible view points to project failure namely; the macro-level and the micro-level. They further explained that the macro view point reviews if the original objectives and concepts of the project was met. Usually the end users and the project beneficiaries are the ones looking at the project failure from the macro view point, where as the project design team, the consultants, contractors, and suppliers review projects from a micro view point focusing on time of delivery, budget, and poor quality.
In the early 1990s, the failure as well as the success of any project was determined by the project duration, monetary cost, and the performance of the project (Idrus, Sodangi, and Husin, 2011). Belout and Gauvrean (2004), also confirmed that the project management triangle based on schedule, cost, and technical performance is the most useful in determining the failure of a project. Moreover, a project is considered as an achievement of specific objectives, which involves series of activities and tasks which consume resources, are completed within specifications, and have a definite start and end time (Muns and Bjeirmi 1996, cited in Toor and Ogunlana, 2009). Reiss (1993) in his suggestion stated that a project is a human activity that achieves a clear objective against a time scale. Wright (1997) taking the view of clients, suggested that time and budget are the only two important parameters of a project which determines if a project is successful or failed. Nevertheless, many other writers such as Turner, Morris and Hough, wateridge, dewit, McCoy, Pinto and Slevin, saarinen and Ballantine all cited in Atkinson (1999), agreed that cost, time, and quality are all success as well as failure criteria of a project, and are not to be used exclusively.
FACTORS OF PROJECT FAILURE
Cookie-Davies (2002) stated the difference between the success criteria and the failure factors. He stated that failure factors are those which contributed towards the failure of a project while success criteria are the measures by which the failure of a project will be judged. The factors constituting the failure criteria are commonly referred to as the key performance indicators (KPIs).
Time and Cost Overrun
The time factor of project failure cannot be discussed without mentioning cost. This is because the time spent on construction projects has a cost attached to it. Al-Khali and Al-Ghafly, (1999); Aibinu and Jagboro, (2002) confirmed that time overrun in construction projects do not only result in cost overrun and poor quality but also result in greater disputes, abandonment and protracted litigation by the project parties. Therefore, focus on reducing the Time overrun helps to reduce resource spent on heavy litigation processes in the construction industry (Phua and Rowlinson, 2003). Most times, the time overrun of a project does not allow resultant system and benefits of the project to be taking into consideration (Atkinson, 1999). Once a project exceeds the contract time, it does not matter anymore if the project was finally abandoned or completed at the same cost and quality specified on the original contract document, the project has failed. Furthermore, Assaf and Al-Hejji, (2006) noted that time overrun means loss of owner’s revenue due to unavailability of the commercial facilities on time, and contractors may also suffers from higher over heads, material and labour costs.
Poor quality/Technical Performance
The word “Performance” has a different meaning which depends on the context it is being used and it can also be referred to as quality. Performance can be generally defined as effectiveness (doing the right thing), and efficiency (doing it right) (Idrus and Sodangi, 2010). Based on this definition of performance, at the project level, it simply means that a completed project meets fulfilled the stakeholder requirements in the business case.
CAUSES OF PROJECT FAILURE
A lot of research studies have investigated the reasons for project failures, and why projects continue to be described as failing despite improved management. Odeh and Baltaineh, 2002; Arain and Law, 2003; Abdul-Rahman et al., 2006; Sambasivan and Soon, 2007; all cited in Toor and Ogunlana, 2008, pointed out the major causes of project failures as Inadequate procurement method; poor funding and availability of resources; descripancies between design and construction; lack of project management practices; and communication lapses
The contract/procurement method
A result obtained from two construction projects which were done by the same contractor but using different procurement methods showed that rework, on the design part which occurs when the activities and materials order are different from those specified on the original contract document, makes it difficult for the project to finish on the expected time (Idrus, Sodangi, and Husin, 2011). This is as a result of non-collaboration and integration between the design team, contractor, and tier suppliers. The rework on the design portion has a huge impact on project failure leading to the time overrun. The traditional method of procurement has inadequate flexibility required to facilitate late changes to the project design once the design phase of the construction project has been concluded.
Nigerian most widely used procurement method is the traditional method of procurement (design-bid-construct) which has been confirmed to be less effective to successfully delivery of a construction project (Dim and Ezeabasili, 2015). And, the world bank country procurement assessment report (2000) cited in Anigbogu and Shwarka, (2011) reported that about 50% of projects in Nigeria are dead even before they commence because they were designed to fail.
The way the construction projects are contracted, in addition to the way the contracts are delivered, contributes to the causes of projects failure. Particularly, among the methods of project contracting is lump-sum or a fixed-price contracting method, in which the contractor agrees to deliver a construction project at a fixed price. The fixed-price contract can be low-bid or not however, once the contract cost has been agreed upon the contract award, it cannot be changed. And, contractors are expected to honor and deliver the contract agreement, failure to do so can result in a breach of contract which can result in the contractor being prosecuted.
Awarding a contract to an unqualified personnel also contributes to project failures. When a contractor places more emphasis on money and the mobilization fee after a construction project has been initiated instead of getting the right workforce and skilled professionals that will execute the project. Instead the workforce chosen will often not be base on competence and required skills rather it will be based on availability. Moreover, poor strategy and planning by contractors who have overloaded with work also contributed to one of the causes of project failure.
Poor funding/Budget Planning
A lot of public projects in the Nigerian construction industry failed as a result inadequate funding, and the difference between the national annual budget and the budget actual released. Most of the Nigerian public projects are signed even before the actual release of the national budget. The difference in budget of the contracted project and the actual budget release can get the contracted company stuck as a result of inflation of prices, scarcity of construction material at the time of the budget release and mobilization to site. Also un-planned scope of work which can be as a result of the contractor working on another contract when he is called back to mobilization to start work. Moreover, poor budget planning is a regular mistake made by some contractors by not undertaking feasibility assessments before starting the design. The construction project should be planned according to the available resources and not according to the unrealistic expectations a client has in mind.
Discrepancies Between the Design and Construction
Limited collaboration between the contractors, engineers, and the architect results in discrepancies between the project designs and construction on site, and further leads to rework. Changes on a project designs, and changing to the scope of work in the middle of construction processes on site can be dangerous, and can lead to time overrun, increase in cost, and most of all can lead to abandonment. Moreover, many cases have been seen where the designs from the architects are not buildable on site, while In some cases, most contractors are unable to adequately specify the scope of work for the construction processes on site. Therefore any default on the design by the architect can be an opportunity for the contractor to make more money which might cause the project duration to exceed the time specified on the contract document.
RESEARCH METHODOLOGY
This research starts with a general reasoning or theory which says that the major cases of project failure in the Nigerian construction industry are defined based on time overrun and cost overrun. The findings from the data analysis will help on the decision to accept the theory or not. The research data was collected from the progress report for the month ending of October, 2015 published by the Nigeria of Federal Ministry of works on thirty-nine on-going highway construction projects at the South-South geopolitical zone. The table 1 below shows the information on the data collected which comprises of the project title, contract Number, project description, the contractor that was awarded the projects, the date of project commencement, date of completion and the extended date if any. The scheduled time for each project was specified as follows: project commencement date labeled as “a”, project completion date labeled as “b”, and the extended date labeled as “c”.
DATA ANALYSIS
The data analysis was done with the use of Microsoft excel. The analysis started by obtaining the number of days between the date of commencement of each project and the date of completion to show the duration of each highway project. And, the number of days between the project completion date and the extension date showed the time-overrun. The project duration and the extended days were obtained with the use of NETWORKDAYS function in Microsoft Excel which calculates the number of working days between two dates excluding weekends and any dates identified as holidays.
The standard deviation between the specified project duration for each highway projects and the extended days was calculated to obtain the extent to which each highway project contract failed on its time of delivery. This was denoted as the degree of failure. The table 1 above showed the projects ranking which was done based on the degree of failure of all the highway projects. The highway projects that were ranked from one to sixteen have low degree of failure and are represented with green color, while the rest are those with high degree of failure and are represented with red color.
FINDINGS
The findings made showed that the successfully completed highway projects have no extended days or time overrun, and the successful on-going highway projects are still on schedule and have no extended days unlike the on-going highway projects that have already failed as a result of the extended dates. Other projects have been abandoned because they have exceeded the delivery date as specified on the contract document, and have no extended date of completion. Thus, no work is going on.
Figure 2 above showed that 14% of highway projects are still on-going projects because they have not exceeded the original date of completion as specified on the contract document. However, they are heading towards failure because they have been given an extended date of completion which can be as a result of some critical activities running behind schedule, causing delay on the critical path network of the projects. Moreover, the other 86% completely failed because they have exceeded their completion date specified on the contract document.
The figure 3 above showed that 63% of the successful highway projects are still on-going because they have not exceed their completion dates, and they are not yet completed. However, those on-going highway projects might end up as failed projects as a result of poor funding, discrepancy between the design and the construction on site, and conflict between the construction parties or stakeholders.
“Say what you will do, and do what you said” or “Say as you will do it, and do it as you said”
CONCLUSION AND RECOMMENDATION
The idea of knowing what a failed project is, the factors and the causes is very important in project management. Success in project management can neither be achieved nor measured without the knowledge of project failure, its factors, and causes in the Nigerian construction industries. This work has shown that project failure is as a result of exceeded time of delivery, cost overrun, and poor quality. However, the analysis was only done based on exceeded time of project delivery because of the nature of the data collected.
This work suggested a few approaches to help reduce the number of failed projects in the Nigerian construction industry if properly implemented. Firstly, Having good collaboration between the project stakeholders involved in a construction project at the early stage of project conception is most important in order to accomplish the project objectives, and deliver the project on time, within budget, and quality specified on the original contract document (Othman, 2006).
Secondly, Adopting the ISO 9000 technique which is used for quality management will also help in achieving a successful project delivery. This technique states “ say what you will do, and do what you said” or “say as you will do it, and do it as you said”. This technique is not an indication of high quality but it promotes control and consistency which leads to specialization, and improved productivity and quality. Also, adopting the principles of lean construction will help to reduce waste within the construction and stream-line activities in order to improve the on-time delivery of projects.
Thirdly, Learning from the precedent failed projects, how those projects failed, and the reason for their failures. This will help the project manager to plan and mitigate the risks of project failures in the future. And, finally, more seminars and workshops will help to educate and enlighten clients (the federal government representatives), users, contractors, engineers, and architects on what is project failure, the factors that contributes to abundant failed projects, and their causes.
REFERENCE
Abimbola, A. (Novermber 24, 2012). About 12,000 Federal Projects Abandoned across Nigeria. Premium times (November 16, 2015). Retrieved from www. Premium timesng.com/news/108450-about-12000-federal-projects-abandoned-across-nigeria.html.
Al-Khali, M.I and Al-Ghafly, M.A. (1999). Important Causes of Delays in Public Utility Projects in Saudi Arabia. Construction management and Economics, 17, 647-655
Aibinu, A.A and Jagboro, G.O. (2002). The Effects of Construction Delays on Project Delivery in Nigeria Construction Industry. International journal of Project management, 20(8), 593- 599.
Anigbogu, N. and Shwarka, M. (2011). Evaluation of Impact of the Public Procurement Reform Program on Combating Corruption Practices in Public Building Project Delivery in Nigeria. Environtech Journal, 1(2). 43-51.
Assaf, S. and Al-Hajji, S. (2006). Causes of Delays in large Construction Projects. International Journal of Project Management, 24, 349-357.
Atkinson , R. (1999). Project management: Cost, time, and quality, two best guesses and a Phenomenon, it’s time to accept other success criteria. International Journal of project Management, 17(6), 337-342.
Belout, A and Gauvrean, C. (2004). Factors Influencing the Project Success: The impact of human resource management. International Journal of project Management, 22, Pp. 1-11.
Butcher, N. and Demmers, L. (2003). Cost Estiumating Simplified. Retrieved from www.librisdesign.org.
Cookie-Davies, T. (2002). The Real Success Factors on Projects. International Journal of Project management, 20(3), 185-190.
Dim, N.U. and Ezeabasili, A.C.C (2015). Strategic Supply Chain Framework as an Effective Approach to Procurement of Public Construction Projects in Nigeria. International Journal of Management and Susutainability, 4(7), 163-172.
Hanachor, M. E. (2012). Community Development Projects Abandonment in Nigeria: Causes and Effects. Journal of Education and Practice, 3(6), 33-36.
Idrus, A., Sodangi, M., and Husin, M., H. (2011). Prioritizing project performance criteria within client perspective. Research Journal of Applied Science, Engineering and Technology, 3(10), 1142-1151.
Idrus, A. and Sodangi, M. (2010). Framework for evaluating quality performance of contractors in Nigeria. International Journal of Civil Environment and Engineering. 10(1), 34-39.
National Bureau of Statistics (January, 2015). Nigerian Construction Sector Summary Report: 2010-2012.
Kotangora, O. O. (1993). Project abandonment, Nigerian Tribune.
Osemenan, I. (1987). Project Abandonment. New Watch Magazine, Vol. 1, pp. 15.
Othman, M.,R. (2006). Forging main and sub-contractor relationship for successful projects. Retrieved from http://rakanl.jkr.gov.my/csfj/editor/files/file/projek/lessonslearned/MAIN&SUB_2.pdf
Phua, F.T.T and Rowlinson, S. (2003). Cultural Differences as an Explanatory Variable for Adversarial Attitude in the Construction Industry: The case of HongKong. Construction Management and Economics, 21, 777-785.
Reiss, B. (1993). Project Management Demystified. London: E and FN Spon Publishers.
Toor, S. R. and Ogunlana, S. O. (2008).Problems causing Delay in Major Construction Projects in Thailand. Construction management and Economics, 26, 395-408.
Toor, S. R. and Ogunlana, S. O. (2008). Critical COMs of Success in Large-Scale Construction Projects: Evidence from Thailand constructuction industry. International Journal of Project management, 26(4), 420-430.
Toor, S. R. and Ogunlana, S. O. (2009).Beyound the “Iron Triangle”: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. International Journal of Project management, doi: 10.1016/j.ijproman.2009.05.005.
Toor, R. and Ogunlana, S. (2009). Construction Innovation: Information, process, management. 9(2), PP. 149-167.
Turner, J. R. (1993). The Handbook of project-Based Management: Improving the process for achieving strategic objective. London, McGraw-Hill.
Wright, J., N. (1997). Time and Budget: The twin imperatives of a project Sponsor. International Journal of Project Management, 15(3), 181-186.
Professor Pavel Matousek – Laser Man
Professor Pavel Matousek, a Science and Technology Facilities Council (STFC) Senior Fellow and Chief Scientific Officer of Cobalt Light Systems Ltd, has pioneered revolutionary techniques for analysing the chemical composition of materials and co-founded a highly successful spin-out company. He has helped develop and commercialize award-winning laser technologies that detect liquid explosives at airports, rapidly check the quality of pharmaceutical products, and that may one day non-invasively diagnose breast cancer. Pavel states:
“I Am Very Excited about What I Do and Driven to Answer Questions in Front of Me, Unravel Complex Problems and Deliver Something Useful to Society.”
STFC science writer James Doherty meets the Laser Man.
Pavel, what first got you interested in physics?
I became fascinated by the stars and Universe while growing up in the Czech Republic. I joined an astronomy society at secondary school and it became clear I wanted to study physics. I got very interested in laser physics during my MSc at the Czech Technical University in Prague. It is a very dynamic field.
When did you arrive at Rutherford Appleton Laboratory (RAL)?
I joined as a research associate in 1991, and went on to complete my PhD in ultra-fast Raman Spectroscopy at RAL, awarded by the Czech Technical University. I’ve been here almost 25 years to the day.
So what is Raman Spectroscopy?
It is a technique that involves shining a laser beam at the surface of a material, and then observing the colour of light scattered from the point of illumination. This typically provides information about the chemical composition of the material’s surface. C.V. Raman observed the effect in 1928 and subsequently won a Nobel Prize.
You pioneered a technique called Spatially Offset Raman Spectroscopy (SORS): What is it and how does it differ from normal Raman Spectroscopy?
“We couldn’t have developed the SORS technique without the instrumentation and long term research continuity available at the Central Laser Facility at RAL”
SORS is a technique that we stumbled across in the Ultrafast Spectroscopy Laboratory (ULTRA) by chance. We had assumed that photons could only be detected at the illumination point but we were wrong. Some photons migrate sideways through the material then emerge adjacent to the illumination point. As these photons have interacted with molecules deeper inside the medium, they provide information about internal chemical make-up: SORS probes deeper into the material. And the further you move from the illumination point, the deeper you see into the medium. The process
involves large photon migration distances, often extending to several centimetres or more. This came as a big surprise.
“SORS involves probing at one location and detecting at another. Our minds, and those of others, were constrained by our perception of how the Raman Spectroscopy process worked but once we made this serendipitous discovery, we quickly realised it had potential major applications.”
What kind of applications?
“The Range of Potential Applications for Sors Is Staggering.”
We immediately realised SORS could determine the chemical make-up of substances by non-destructive means. This could have applications in bio-medicine, chemistry, security, forensics, heritage, and beyond. But we first focused on pharmaceuticals, and developed novel ways for analysing the chemical make-up of manufactured drugs.
We swiftly filed 8 patents, which became the basis of our company Cobalt Light Systems.
Cobalt Light Systems is perhaps best known for its airport security scanners. Can you describe how these work and their impact to passenger travel?
Security scanners represent the second generation of technology developed by Cobalt. To date there are around 400 operational units in 70 airports across Europe and Asia. They are used to scan traveller essentials, such as medicines or baby milk, and compare their chemical make-up to a database of potentially explosive substances. Suspicious substances are automatically identified and flagged. For example, the technology avoids passengers having to drink liquids (e.g. baby milk) in front security officer to prove they are not dangerous, which is clearly safer and more hygienic. It has also contributed to new legislation, and is expected to lead to a relaxation of the complete ban of taking liquids on board a plane in the future.
The scanners are currently the size of a microwave oven but right now we are launching a SORS handheld device. This should have further applications for first responder teams called to spillages of unknown substances and fire fighters attending chemical fires.
Pavel Matousek Pioneered a Technique Called Spatially Offset Raman Spectroscopy (SORS)
How did STFC help with this process?
First off, we used instrumentation at STFC’s Central Laser Facility to demonstrate the basic capability to detect the SORS subsurface signal. Once we made the discovery in 2004, we worked closely with STFC’s Technology Transfer Office SIL (formerly CLIK) and Business and Innovations (BID) to develop, optimise and protect our ideas. There was a complex path to navigate from discovery, to optimising SORS, building a prototype, and ultimately to securing investment in 2008. BID/SIL coordinated the company at all levels and provided the support necessary to achieve this goal.
“My story illustrates the national and international importance of STFC. If its determination to deliver impact on science was absent, the chain from a fundamental discovery to Cobalt Light Systems’ product would have been broken. STFC responded appropriately at every stage. And this is just one example of how STFC contributes to the UK’s know-how economy.”
What are you working on currently?
I’m focused on developing novel non-invasive medical screening techniques, including diagnosing bone disease such as osteoporosis (jointly with STFC’s Prof Tony Parker and University College London’s Prof Allen Goodship), and I’m working with Professor Nicolas Stone of Exeter University on non-invasive breast cancer screening.
In addition, I’m collaborating with Consiglio Nazionale delle Ricerche in Italy to apply the SORS technology to objects of art on microscales. For example, we can scan different layers of paint to determine compositional information essential in restoration and preservation of artefacts.
How will the medical applications benefit patients?
Patient benefit could be enormous. Current diagnosis techniques for osteoporosis are around 60-70% accurate as they sense only mineral content. SORS on the other hand has a high specificity for mineral and collagen content – both of which determine bone strength – and so holds considerable promise for providing improved diagnostic accuracy. SORS could also be used to classify breast or prostate tumours as malignant or benign without needle biopsy. This would reduce patient stress and save medical provider costs.
However, medical problems are challenging as the human body is complex and variable. These applications are probably still 7-10 years away.
Why do you do this research?
This is where my passion and interest lies – I’m very excited about what I do.
“As You Push the Boundaries of Technology and Make New Discoveries, the End Goal Always Changes. This Is the Nice Thing about Science.”
Heathrow Airport Expansion – Exploring the Controversy
LONDON – The debate over the £19 billion scheme for the third runway at Heathrow airport has been a long-running row which has grown into fierce opposition within the last couple of months.
We shall not be moved, Heathrow Airport management has stuck to its original course of action, while ignoring constant protests and public discontent and insists that expanding Heathrow will provide the growth, jobs, experts, and connections to make Great Britain greater still.
Sir Richard Branson Urges Heathrow Expansion, and Says “Britain Is ‘being Held Back Massively”.
The billionaire founder of the Virgin Group has accused politicians of neglecting to back the expansion project at Heathrow because they are more concerned about their own jobs rather than doing “what is right for the UK”.
The entrepreneur, Sir Richard Branson urged the Government to be ” bold and brave on big infrastructure decisions like this”.
Hounslow Council, on the other hand, has been accused of “throwing in the towel” over the Heathrow expansion after it promoted the “opportunity of a third runway”. In response, Hounslow Council leader Steve Curran stated its stance on Heathrow had not changed but said it needed to be prepared if the government approves the recommendation for a third runway later this year.
Meanwhile, twelfth century St Mary the Virgin sits right in the middle of flight paths in the village of Harmondsworth, Middlesex and under blueprints for the expansion of the airport, most of the buildings in the village will be demolished but the 951-year-old grade II listed church will be spared. Protesters say there would no longer be anyone to use it.
Amid mounting concerns and opposition from the whole community Justine Greening, the International Development Secretary predicts the government will ditch the £16bn plan for a third runway at Heathrow.
“Trying to Expand Heathrow Is like Trying to Build an Eight Bedroom Mansion on the Site of a Terraced House. It Is a Hub Airport That Is Just Simply in the Wrong Place” – Justine Greening
London Mayor Boris Johnson has been a vehement opponent of Heathrow expansion and has said
that the New Heathrow runway will negatively affect public health. In his report ‘Landing the Right Airport’ presented in March, Boris Johnson evaluated damages caused by the new runway to be between £20bn to £25bn during the next 60 years.
Both Zac Goldsmith and Sadiq Khan, respective Conservative and Labour candidates to succeed Mr. Johnson are also on the bandwagon and are campaigning against a third runway. This controversial debate has also resulted in Downing Street issuing an instruction to ministers asking them not to discuss the proposed third runway at Heathrow airport.
The North West Runway Will Be Two Miles (3,200m) Long, Making It Big Enough for Any Aircraft in the World to Use It
The commission, which was ordered by the government coalition, stated that the Heathrow expansion is ‘the best answer’ to easing the pressure on the UK’s crowded air terminals and that it will not increase noise above current levels, but will generate up to £147 billion in GDP impacts over 60 years.
Furthermore, if the plan for the third runway is approved, it will provide 740,000 flights a year, putting it on equal footing with Paris, Frankfurt, and Amsterdam.
A decision on whether to build a third runway at Heathrow Airport has been delayed until summer 2016, the government has confirmed.
33 of the Most Inspirational Leadership Quotes for You to Live By
We’ve all seen quotes designed to motivate or inspire us. Well, according to a new study, people who post these ‘inspirational’ quotes also have lower levels of intelligence. However, Godinterest disagrees, and see’s some quotes as universal nuggets of wisdom. You know the ones – those quotes that give you “Aha!” moments of inspiration or meaningful insights into your personal and professional lives. These are the ones you want to print out and place on your fridge so you’ll see them every day.
This collection of inspirational quotes features some of the all-time classics you may know, as well as some lesser-known ones you’ll love too. If you have any quotes you would have added, feel free to share in the comments section!
- “The reason most people never reach their goals is that they don’t define them, or ever seriously consider them as believable or achievable.” – Denis Watley
- “Our goals can only be reached through a vehicle of a plan, in which we must fervently believe, and upon which we must vigorously act. There is no other route to success.” – Stephen A. Brennan
- “Without goals, and plans to reach them, you are like a ship that has set sail with no destination.” – Fitzhugh Dodson
- “Goals are dreams with deadlines.” – Diana Scharf Hunt
- “You must have long-term goals to keep you from being frustrated by short-term failures.” – Charles C. Noble
- “Crystallize your goals. Make a plan for achieving them and set yourself a deadline. Then, with supreme confidence, determination, and disregard for obstacles and other people’s criticisms, carry out your plan.” – Paul Meyer
- “The tragedy of life doesn’t lie in not reaching your goal. The tragedy lies in having no goals to reach.” – Benjamin Mays
- “Progress has little to do with speed, but much to do with direction.” – Unknown
- “The world makes way for the man who knows where he is going.” – Ralph Waldo Emerson
- “Goals help focus you on areas in both your personal and professional life that are important and meaningful, rather than being guided by what other people want you to be, do, or accomplish.” – Catherine Pulsifer
- “What you get by achieving your goals is not as important as what you become by achieving your goals.” – Zig Ziglar
- “It doesn’t matter where you are coming from. All that matters is where you are going.” – Brian Tracy
- “The true measure of a man is not how he behaves in moments of comfort and convenience but how he stands at times of controversy and challenges.” – Martin Luther King Jr.
- “It’s not the load that breaks you down, it’s the way you carry it.” – Horne, Lena
- “Difficulties are meant to rouse, not discourage. The human spirit is to grow strong by conflict.” – William E. Channing
- “Nothing is particularly hard if you divide it into small jobs.” – Henry Ford
- “It’s not whether you get knocked down. It’s whether you get up again.” – Vince Lombardi
- “You must do the thing you think you cannot do.” E- Eleanor Roosevelt
- “Motivation is what gets you started. Habit is what keeps you going.” – Jim Ryun
- “Strong lives are motivated by dynamic purposes.” – Kenneth Hildebrand
- “People who are unable to motivate themselves must be content with mediocrity, no matter how impressive their other talents.” – Andrew Carnegie
- “Be miserable. Or motivate yourself. Whatever has to be done, it’s always your choice.” – Wayne Dyer
- “The surest way not to fail is to be determined to succeed.” – Richard B. Sheridan
- “A determined person will do more with a pen and paper than a lazy person will accomplish with a personal computer.” – Catherine Pulsifer
- “There is no chance, no destiny, no fate, that can hinder or control the firm resolve of a determined soul.” – Ella Wheeler Wilcox
- “It was courage, faith, endurance and a dogged determination to surmount all obstacles that built this bridge.” – John J. Watson
- “Failure will never overtake me if my determination to succeed is strong enough.” – Og Mandino
- “You’ve got to get up every morning with determination if you’re going to go to bed with satisfaction.” – George Lorimer
- “We will either find a way or make one!” – Hannibal
- “That some achieve great success, is proof to all that others can achieve it as well.” – Unknown
- “Do not let what you cannot do interfere with what you can do.” – John Wooden
- “Success seems to be largely a matter of hanging on after others have let go.” – William Feather
- “Success is the sum of small efforts, repeated day in and day out.” – Robert Collier
10 Proposed Infrastructure Projects for London to Retain Its World Class Status
London hasen’t reached the density of Hong Kong, but it’s certainly heading that way as the cities population continues to expand. The “London Infrastructure Plan 2050″ aims to tackle the problem and outlines the spending needed for the capital to remain one of the world’s leading cities.
London Mayor Boris Johnson Has Said £1.3tn of Investment Is Needed over the next 35 Years in Order for London to Retain Its World Class Status
“This plan is a real wake up call to the stark needs that face London over the next half century. Infrastructure underpins everything we do and we all use it every day. Without a long-term plan for investment and the political will to implement it this city will falter.”
London School of Economics Professor Tony Travers Said: “the London Infrastructure Plan Is a Necessary Step Towards Understanding the Needs of the ‘10 Million City’ Which London Will Soon Become.
Transport is the biggest focus of the “London Infrastructure Plan 2050” as the population hit 8.5 million in 2014 the largest it has been since 1939. By 2050 it is predicted to exceed 11 million, growing at a rate of 41,000 a year.
Some infrastructure project proposals are already in development, others may not be approved at all, however, these are some transport developments suggested for London by 2050.
1. Air con on the Tube, £900m
It was find in the beginning, in fact, conditions were so pleasant in 1906 that the city proclaimed the underground ‘The coolest place in hot weather’. But that was before deep lines and millions of passengers.
Better Late than Never, London’s Tube Is Getting Air-con
In summer, temperatures on parts of the London Underground can become very uncomfortable due to its deep and poorly ventilated tube tunnels: temperatures as high as 116 °F were reported in the 2006 heat wave. New Tube trains, which allow better access for customers, are being rolled out on the Circle line as part of the introduction of 53 new trains on both the Hammersmith & City and Circle lines. By the end of 2016 there will be a total of 191 walk-through, air-conditioned trains covering 40% of the Tube network running on the District,Circle, Metropolitan and Hammersmith & City lines.
2. Inner orbital tolled tunnel, £15bn-25bn
Mayor sets out plan for 22-mile ring-road tunnel under London, which is considered by many to be one of the most ambitious infrastructure scheme ever proposed in the city.
The tunnel will cost an estimated £30 billion to construct and will remove tens of thousands of cars from the crowded streets of London and avert traffic gridlock. With subterranean dual carriageways linking key routes, from the A40 Westway to the A12 in the east, and the A1 route north to the A2 running south.
London Major Boris Johnson, who commissioned work to develop the idea, believes it could dramatically improve quality of life for residents. He said: “I would love the views of Evening Standard readers on this. There are big arguments in favour. There are obviously arguments against.”
Transport for London is working on the concept.
3. Northern Line extension, £1bn
Works commenced on London Underground’s £1bn Northern Line extensionfrom Kennington to Battersea via Nine Elms in the UK in 2015.
Tunnelling work is scheduled to start in early 2017 and will take six months to complete, while the project is expected to be completed in 2020.
The project will reduce journey times to the West End and the city to less than 15min.
4. Cycle Super Highways, £2bn- £4bn
London’s New Superhighway Linking East and West London Will Open on 30 April, Says the Capital’s Mayor Boris Johnson
The route, which links Barking, Canary Wharf and Tower Hill to Westminster, will open less than a week before his term is set to end.
Chris Boardman, the former Olympic champion and policy advisor to British Cycling, said: “This YouGov poll shows us, yet again, that the vast majority of the public want to see more cycle tracks on main roads.
“If this kind of evidence isn’t enough to give politicians and transport authorities the confidence to act, I don’t know what is.”
Last month, Boris Johnson pressed ahead with plans for three cycle superhighways.
5. Bakerloo and Overground extensions, £2.5bn-3.5bn
The extension of the Bakerloo line could help regenerate South East London from Old Kent Road to Catford, improve routes into London and relieve congestion on the main rail services into London Bridge.
6. Crossrail 2 and 3, £23bn- £30bn
TRANSPORT chiefs say it is “full steam ahead” for Crossrail 2 after the Government made an £80million pledge towards the project – but it will be months before passengers find out if a station will be built at Balham or Tooting.
Construction work is due to begin on the rail link in the early 2020s, which would enable the service to be operational by 2033.
7. New Stations, £500m and 24/7 Night Tube service
New stations at Cricklewood, Beam Park in Rainham and Thames Wharf could be built to support redevelopment in these areas. It has also been claimed that night services on the Piccadilly, Central, and Northern Lines are then due to start in September, with all major lines being served by the weekend night tube by September 23.
8. Another channel tunnel, £1bn
The “London Infrastructure Plan 2050″ suggests an additional cross-channel rail tunnel would provide high speed links from the UK to the rest of Europe for passengers and freight.
9. 13 new crossings in London, £1-2bn
The vision for east London includes 13 proposed new river crossings include Gallions-Thamesmead, Belvedere-Rainham, Woolwich- Royal Docks to replace the Woolwich Ferry, as well as the Silvertown tunnel.
Boris Johnson states “By creating more links between the north and south of the river, we won’t just improve day-to-day travelling across the capital, we’ll unlock areas for development and create thousands of jobs and homes.
- Rotherhithe to Canary Wharf: Pedestrian and cycle bridge (feasibility).
- North Greenwich to the Isle of Dogs: a passenger ferry linking North Greenwich and the Isle of Dogs (Blackwall) (conceptual).
- Silvertown tunnel: Twin bore tunnel connecting Silvertown on the north side to the Blackwall Tunnel Approach on the south side (preparation).
- Charlton: a passenger ferry crossing linking the Royal Docks and Charlton Riverside (conceptual).
- Crossrail: New rail line linking Woolwich with Custom House and onward to Canary Wharf, central London and Heathrow Airport (construction).
- Gallions Reach: Multi-modal crossing linking Thamesmead with Beckton along a safeguarded alignment (consultation).
- Belvedere: Multi-modal crossing connecting Belvedere with Rainham (consultation)
- Barking Riverside to Thamesmead: London Overground tunnel extension from Barking Riverside to Thamesmead (conceptual).
- Lower Thames Crossing: New road crossing linking Essex and Kent (progressing).
- Diamond Jubilee: Pedestrian and cycle bridge linking Fulham with Battersea (planning permission granted).
- Crossrail 2: New railway line connecting Hertfordshire and Surrey via central London and providing a new cross river link between Victoria and Clapham Junction (consultation).
- Vauxhall, Nine Elms and Battersea: Pedestrian and cycle bridge (feasibility).
- Garden Bridge: New pedestrian crossing linking the South Bank to Temple station (planning permission granted).
10. Thames Estuary airport, 18bn-25bn
A new Thames Estuary Airport has been proposed at various times since the 1940s. Economic considerations have ruled out a new coastal airport, while political considerations have ruled out a new inland airport, leaving planners with an as-yet-unresolved dilemma.
‘Bizarre proposal’ states Rehman Chisthti, MP for Gillingham and Rainham “The airport in the estuary was not the right thing do so we all worked together to oppose it. It’s really good news and we’re really pleased that common sense has prevailed.”
However,Boris Johnson refloats idea of Thames Estuary airport 18 months after it was rejected by Airports Commission. Mr Johnson believes a hub in the east of the capital would offer around double the number of long haul and domestic routes served by Heathrow while exposing 95 per cent fewer people to significant aircraft noise.
‘Grain isn’t the answer’ states Rodney Chamber, Leader of Medway Council “We have said all along that it should never have even been considered as it would have resulted in the mass destruction of habitat and wildlife that could never be replaced.”
How to Cope with a Mis-Sold Job
Everyone knows a story about a smart and talented professional who has lost his or her passion for a role, who no longer looks forward to going to the office yet remains stuck without a visible way out. Getting on the career ladder is a great thing, you start off at the bottom and work your way up, but sometimes you can get stuck and do not even realize it.
“One in Five Employees Claim They Were Mis-sold Opportunities When They Joined Their Organisation – Kelly Global Workforce Index (Kgwi).”
Commenting on the findings, Debbie Pettingill, Director, Kelly Services UK and Ireland said
“Employee retention will become an increasing challenge for employers as we move out of the recession. As we move into a more candidate driven market, this trend is likely to accelerate. Our findings indicate that this problem is being exacerbated by the misrepresentation of job role or company culture at the interview stage, leading to the dissatisfaction of new hires.”
Most of us know what we are trying to escape a “mis-sold” job resulting in a narrowly defined career, inauthentic or unstimulating work, numbing corporate politics, and perhaps blackmail including direct threats of being used as a scapegoat. A job where you are both overlooked and underappreciated. One may ring true for some of you.
“Fewer than Half of Uk Employees Are Happy with the Way Their Careers Are Progressing According to New British Research.”
Why Would A Company or Person Block Your Move?
Well, this could be because of his or her personal insecurity i.e. as the team works well, why rock the boat? Comfort zone: sometimes the team gets too comfortable? Golden child syndrome: you’re working your butt off and your sponsor or other senior is reaping the recognition from your amazing deliverables?
Working a job you don’t like can leave you feeling stuck, forgotten by God, and asking yourself questions like:
Why hasn’t God opened another door for me yet?
Why is God not moving?
Why would God leave me here in this job I hate?
But the truth is God has not left you. He’s not holding back on you. When you feel God is silent, that’s exactly when He’s moving! Your situation does not change God. He still loves you and is with you no matter what.
Instead of looking at our situation from a perspective of fear and worry, we need to look at it through faith and hope.
What Can You Do About it?
Don’t fret, you can handover your work or completely leave the organisation and still stay sane. You might worry that announcing your intentions will cause your company grief, but ultimately you have to do what’s best for you no matter what!
Think and pray long and hard about how you’re going to drop this bombshell as you will need to give notice. A sound method is required to overcome the assault and possible backlash – including of course more prayer and fasting.
So how are you going to approach it? What’s your reasoning going to be? How are you going to get them to understand exactly why you’re doing this? What do you need to do in order to prepare for the big day?
Easy, you’re going to read this guide.
Strategy 1 – Remote Working Arrangement
This could be a great approach if 80% of your work can be undertaken remotely. However, while there is a very logical argument to be made in favor of working from home, many people equate remote work to a lack of productivity and laziness. These people do not realize that the switch from an office to working from home can actually lead to significant increases in productivity.
Strategy 2 – What’s in It for Me?
What’s in it for me? That question sounds a little selfish, doesn’t it? Maybe you aren’t being compensated fairly, or you’re not happy with the effort vs return. When you know your client and team needs you and you’re willing to stay for a price, don’t mess around. Give them the real number or offer that will make it worth your while to stick it out for awhile.
Strategy 3 – The Budget Cut
The re-structuring. The downsizing. The dreaded budget cut. Whatever name you want to give it, this can be terrifying for a lot of professionals. However, if you’re already thinking about leaving, so maybe it doesn’t have to be such a scary thing. In fact, maybe it can be extremely positive for both parties.
Strategy 4 – The Ease Out
Still feeling weary about leaving the organization. Propose easing yourself out of the post. Pick a time frame, maybe four weeks or so, and come up with a plan for slowly taking yourself out of the position. This also allows you some time to slowly ramp down your time commitment.
Strategy 5 – Burning Bridges in the Industry
“Sometimes it’s about networking and being nice to people and not burning any bridges – but remembering to draw line where you must.”
There’s no harm in an early exit from a job you never plan to mention again or an interim role where you have clearly agreed on a start and finish date. But if your manager is well connected to your industry you should try to leave on a good note. Why? Because it’s a small world and the next hiring manager may put in a call to his or her former colleague (a.k.a., your new manager) to get the unofficial scoop. It happens, so if you’re going to leave anyway then try to fulfill your end of the deal.
Strategy 6 – Get Moving Fast
Imagine, for example, that you were hired to help the company manage multiple programmes and projects across the globe, but a recent change in leadership means all efforts moving forward will be focused locally.
If you’re spending your days just trying to find ways to be productive or are undertaking a role you never signed up for, you have every right to pursue new opportunities. Of course, the first course of action should normally be to discuss this with your manager to see if there are other roles you can take on. But if you know that this isn’t going to happen in the new world, get moving fast.
Strategy 7 – Your Dream Job Awaits
“When you’re being interviewed, always treat the interview as a 50-50 thing,” says Andy Dallas, a director at Robert Half International, recruitment consultants. “Ask what you can expect to be doing in your first week, month and three months. Ask what a successful year looks like.”
Dream jobs don’t come every day. So, if you have a chance at yours, take it quickly and congratulate yourself for being strong enough to leave when you were unhappy.
Strategy 8 – Remeber to Be Patient
We will not always be in a job we desire. Maybe you are fresh out of school and are working a job that has nothing to do with the degree you just earned. Maybe you are in a situation where you are working at a job where you are overqualified, overworked, and fed up. Maybe, for the most part, you love your job but get discouraged by the mundane tasks that take up time from doing the aspects of your job you love most.
“Humble yourselves before the Lord, and he will exalt you.” – James 4:10 NIV
Here’s the thing: God will still use this season to grow, develop, and prepare you. Any season that humbles us is preparing us for what God has next.
Any thoughts to share?
Bridge House, Croydon, Is Prefab Really Prefabulous?
Prefabricated homes have been available for years and date back at least a century. The Sears Roebuck index made and offered prefab homes to the public as early as 1908, and Prefab was later explored by famous twentieth-century architects, such as, Walter Gropius, Le Corbusier, Marcel Breuer, Frank Lloyd Wright, who saw the method as a likely solution to the dilemma of housing in modern society. Interest in Prefab grew in the first half of the twentieth-century, with the outburst of manufacturing expertise and the creation of the assembly line.
Historically the mention of prefabricated houses invokes memories of housing built to cover in the temporary a deficiency of housing in the UK following the World Wars.
The Government promised ‘homes fit for heroes’, however, negative public attitudes surfaced towards prefabricated housing because of substandard building materials used and poor workmanship.
A staggering 1 million of these homes were built during the 20th century and more than half a century on, many are still standing despite no foundations. A few are listed while others have been demolished.
Today people remember the shabby mobile classrooms as in, bitter cold in winter and like an oven in summer. Therefore, memories have rendered the concept of prefabricated houses an unattractive idea. Talk about the term prefabricated housing to an architect, and their eyes will beam with visions of fascinating contemporary homes. However, talk to the ordinary person on the street and people immediately think that we are going down the same path, a pretty hard image to shake off. The very factors that are presented as positive advantages of prefabricated homes became liabilities in the eyes of homeowners who wanted a durable appreciating asset.
An example can be found by looking at the prefabricated houses on Catford estate built by German and Italian prisoners of war in 1946.
‘They were not built to last and need regular maintenance. They are just large sheds really and taking up a lot of space. They should really be demolished.’ (Drake 2008)
Over the ten years, Lewisham Council has tried to develop the site many times and a review found none of the dwellings met Decent Homes Standard.
So why do more and more developers choose prefabricated construction?
First and foremost – Speed. “It may take a bit longer in terms of design, preparation and planning but site based activities are taking up to 30% less time and allowing homes to reach the market sooner. Other reasons cited include, in order of preference:
- Design Quality
- Cost
- Previous Experience
- Funding
Source: Design and Modern Methods of Construction. The Housing Corporation and CABE 2004″
Bridge House (Example)
Croydon Vision 2020 is a regeneration programme by the London Borough of Croydon for the centre of Croydon in South London. The Old Town Masterplan focused on the area between the High Street and Roman Way, one of the oldest areas of Croydon.
Formerly the site of a telephone exchange, Bridge House is a £20 million development that has provided 27 private and 48 affordable apartments, above ground and mezzanine retail spaces.
The block wraps around an existing multi-storey car park and offers the opportunity for cafs and shops to open onto the new square. A mix of green and brown roofs, to support biodiversity, form part of a series of environmental measures and the scheme is to be of modular construction.
The Croydon chose the modular approach principally because of the speed of construction offered. The project began on site in the spring of 2006 and the 75 flats were stated to have been erected in approximately 26 days, vastly outperforming the time taken by traditional construction.
Client: Howard Holdings plc
Architect: AWW
Structures: Walsh Associates
Principal Supplier: MC First
The Garden Bridge Project, London
Thomas Heatherwick’s Garden Bridge has moved one step closer to reality with the appointment of building contractors Bouygues Travaux Publics and Cimolai. Building work is now scheduled to start this summer 2016, but opponents and locals are still not convinced.
Why Is London’s Garden Bridge worth as Much as Five Lancashire Museums? Ask’s Joanna Lumley
The Opponents
For those of you who aren’t aware of the project, it’s intended to be a plant-covered pedestrian bridge across the River Thames between the South Bank and Temple. The Bridge was designed by Heatherwick after being conceived by British actress Joanna Lumley.
Coined as a “wondrous green oasis floating above the River Thames”, the £175m 367-metre-long Garden Bridge, backed by London mayor Boris Johnson, has sparked a huge amount of controversy in London with calls for the project to be halted from a number of local politicians. This includes Vauxhall MP Kate Hoey and three councillors from the London Borough of Lambeth, even though planning permission was granted by both local authorities in late 2014.
Writing in the Guardian, Ian Jack contrasted the £60m taxpayer support for the project with the closure of five Lancashire museums – two of the which are nationally important and forty libraries. Jack described the bridge as unwanted and unnecessary and the closures as “cultural disembowelment.
In November 2014, it was claimed that the bridge would be off limits to groups of eight or more people and cyclists, and closed between midnight and 6am. Critiques fear that the £175m bridge, which already has £60m in official grants and loans, will require a bailout if costs rise or efforts to drum up further private money fail.
Halt London Garden Bridge Project, Says RIBA President
An study by The Architect’s Journal found that Heatherwick was present for at least five meetings with London’s mayor Boris Johnson prior to the contest. The AJ also claimed that a manager for government body Transport for London (TfL) had reported anomalies in the design competition.
“It’s Now Abundantly Clear That the Design Competition That Transport for London Held in Early 2013 Was Nothing of the Sort,” Aj Deputy Editor Will Hurst Told Dezeen
Kate Hoey, the Labour MP whose Vauxhall constituency is on the south side of the bridge, has said “it is quite clear they haven’t raised nearly as much money as they originally thought.” However, The Garden Bridge Trust which was launched on 1 November 2013 to oversee the project argued that its perfectly ordinary for large infrastructure projects to begin work while fundraising determinations continue, however, in Project Journal’s experience such ambitious construction projects commonly overrun in terms of budget and time. For example, an extension to the Tate Modern art gallery was scheduled to open in 2012 at a cost of £215m. It will instead open this year at an estimated cost of £260m.
The Garden Bridge Trust has now raised an additional £85 million.
The Project
The Garden Bridge project began as a seamlessly innocent idea, a beautiful new garden floating above the River Thames, sounds amazing. Imagine crossing a river surrounded by wildlife in the middle of London City. Imagine a morning commute through a peaceful garden. Well, the Garden Bridge Trust intends to make this a reality. However, who will benefit the most, the rich, middle class, or the poor?
The bridge is planned to be 30 metres (98 ft) across at its widest point. It would run from the roof of Temple station as a continuation of Arundel Street on the north bank to Queen’s Walk by the London Studios, where a large public green open space would be redeveloped to provide a commercial building associated with the project. The bridge will feature trees, shrubs, and wildflowers. Its construction would require 32 mature trees in the avenue on Queen’s Walk, on the South Bank.
“The Garden Bridge Will Be an Extraordinarily Special Place, Either to Race Across, Relax in or Look Back at the Rest of the City’s Sights.” Thomas Heatherwick
The bridge is officially scheduled to open late 2018. Hoey said it would be “particularly inexcusable” for any more public money to be committed when her constituency was struggling under government cuts.
If you’re wondering why the bridge is being built in the first place, or why Jane Duncan is asking for the project to be terminated, read Ian Jack’s opinion piece ‘Why is London’s Garden Bridge worth as much as five Lancashire museums? Ask Joanna Lumley’ a particularly powerful and unforgiving piece, and for us, the truth.