Garden of Eden is in Singapore!

Garden of Eden is in Singapore!

From vertical farms to living buildings, the city is on the cutting edge of environmentally sustainable urban solutions in the world.

Home to over 5.5 million, Singapore had no choice but to adopt high-density development because of its tight land constraints.

“We take steps to ensure our self-sufficiency,” says Yvonne Soh, general manager of the  Singapore Green Buildings Council. “In Singapore, we have a lot of initiatives to promote sustainability.”

As Singapore expands, a novel approach preserves green space. New developments must include plant life, in the form of green roofs, cascading vertical gardens, and verdant walls mandatory since 2008. This has resulted in urban planners literally weaving nature throughout the entire city – visible from across the landscape. Innovative design has created the illusion of space using “green” and “blue” elements. This includes the creation of one of the largest freshwater city reservoirs in the world.

Much of that vision to keep Singapore both sustainable and livable stems from Cheong Koon Hean, the first woman to lead Singapore’s urban development agency (UDA).  With a rising population and finite freshwater resources, some positive action was needed fast, so ministers set up a national water agency, PUB, which became the sole body responsible for the collection, production, distribution, and reclamation of water in the city.

 The Gardens: look east for Eden, Singapore Style

Symbol of Singapore and its efforts to promote green space, these “Supertrees
Symbol of Singapore and its efforts to promote green space, these “Supertrees” belong to a display at the 250-acre Gardens by the Bay. The high-tech structures range from 80 to 160 feet and collect solar energy to power a nightly light show. They have a softer side too: their trunks are vertical gardens, laced with more than 150,000 living plants.
PHOTOGRAPH BY LUCA LOCATELLI, INSTITUTE

Throughout the city, there are many green buildings such as the CapitaGreen office tower, the Park Royal on Pickering hotel and the Tree House condo near Bukit Timah Nature Reserve.

“Singapore is an island about half the size of London which has managed to preserve its cultural—Chinese, Indian, and Malay—and architectural legacy through a heritage conservation program.”

The futuristic ‘Gardens by the Bay’ in central Singapore, is a revolutionary botanical garden spanning over 100 hectares of reclaimed land. It’s  a beautiful asset to the city but may also offer a path to the health and happiness of its citizens.

Transport is another sector that has seen investment recently. On an island of 4.8 million people with limited space.  After a series of smart card innovations, people have been able to use e-Symphony, an IBM-designed payment card that can be used to pay for road tolls, bus travel, taxis, the metro, and even shopping.

Have little ones with you? Take them to the Jacob Ballas Children’s Garden, where they’ll learn all about shrubs, plants, and all things green.

Up for a hike? Visit the  MacRitchie Nature Trail & Reservoir Park. Complete the 11-kilometer-long nature trail and don’t miss the Treetop Walk, a 250-meter high suspension bridge that connects two of the park’s highest points.

History buffs can make a beeline for  Fort Canning Park. Conveniently located in the heart of town, this site is home to numerous historical landmarks, such as Fort Gate, a remnant of a fortress that was built in the 19th century.

Singapore in 1965

When Singapore became independent in 1965, it was a city filled with slums, choked with congestion and a lack of jobs with limited land and no natural resources.

Singapore’s version of public housing is unique.

In 50 years, it has built a clean, modern metropolis with a diversified economy and reliable infrastructure and has transformed from a nation of squatters to a nation of homeowners with a 90% home-ownership rate, currently the highest in the world.

For vulnerable families who cannot afford a flat of their own, HDB helps them through its public rental program.

PARKROYAL on Pickering |  © Patrick Bingham / Courtesy of PARKROYAL on Pickering
PARKROYAL on Pickering | © Patrick Bingham / Courtesy of PARKROYAL on Pickering

All these measures combine to make Singapore a smarter city.

“What we have done is to research and try to distill the principles for Singapore’s success in sustainable urban development – we call it a liveability framework,” says Khoo Teng Chye, executive director at the Centre for Liveable Cities based in Singapore.

Back to Eden

The planet simply can’t sustain current levels of resource use and environmental degradation. It has not a choice; cities have to change.

Cities cover just 2% of the Earth’s surface yet consume about 75% of the world’s resources.  By 2050, it is expected that 70% of the world population will live in urban areas.  According to a 2014 study by the United Nations, rural living is in decline on a global scale. Whereas just 30% of the world’s population were urban dwellers in 1950, more than half (54%) are now housed in cities, therefore, it’s clear they are key to tackling climate change and reducing resource use.  

However, quality of life, environmental sustainability, and competitive economics. These are the components that make cities liveable and there  is very strong evidence to show that maintaining a  connection to nature is good for our health;

“People are happiest when they’re most connected to nature,” says Chris Trott, Head of Sustainability at Foster and Partners, who believes setting schemes and legislation in this way can create awareness in the mind of both developers and the public.”
Fredi Devas, producer of the Cities episode of Planet Earth II says.
“Many studies show that hospital beds with a window onto greenery result in their patients recovering faster. Schools have better attendance and companies have better staff retention, if they have vegetation close at hand.”  

Visitors to Singapore are often surprised by how green the island is considering how large a population it crams onto its small landmass.  According to the latest Siemens’ Green City Index for Asia, Singapore is the best-performing city in the region when measured against a range of sustainability criteria.

Singapore stands as a model of sustainability and water management in the region and beyond and is the Eden garden city of the future.  

‘Creation From Catastrophe’ a New exhibition looks at how architects are doing more to prepare us for disaster – but is it enough?

Out of the ashes rises great opportunity. That is the theme of the new exhibit “Creation from Catastrophe — How Architecture Rebuilds Communities” at the Royal Institute of British Architects. Featuring a number of impressive projects dedicated to rebuilding communities after a disaster, the exhibit explores the evolving relationship between man, architecture, and nature.

In an interview with Dezeen magazine, curator Jes Fernie said the exhibit reveals an “expanded idea of what architecture is and what architects can do.”

From Floating Schools to Unseen Plans for an Alternative London, a New Exhibition Showcases the Good, the Bad and the Ugly Architectural Responses to Urban Disasters

The exhibit, which opened on Jan 27  and runs through April 24, spans nearly four centuries riddled with successful disaster relief projects. It features designs for rebuilding after London’s Great Fire in 1666 as well as plans for water communities in Nigeria, which could be affected by unpredictable coastal water levels in Africa’s near future.

Here are five other unique projects you can follow up on when visiting the Catastrophe exhibit this spring:

The Reliance Building
The Reliance Building

1. The Reliance Building, Atwood, Burnham and Co., North State Street, Chicago, 1890-1895
While devastating, Chicago’s Great Fire of 1871 paved a new way for architectural design. Considered by many to have birthed the Chicago School architectural style, the disaster also led to a new type of architectural design: the skyscraper.

In an effort to create fire-retardant buildings, designers utilized tools such as steel frames and sheet glass coverings. The Reliance Building, constructed by Atwood, Burnham, and Co, is one of the first post-fire buildings that fathered a design very similar to the modern day skyscrapers we know.

Nepal Project by Shigeru Ban Dezeen
Nepal Project by Shigeru Ban Dezeen
The Architect Bringing Cheap, Super-Light Disaster Shelters to Nepal
The Architect Bringing Cheap, Super-Light Disaster Shelters to Nepal

2. Housing for Nepal earthquake victims, Shigeru Ban, 2015
Simple, traditional homes in Nepal were the ones that withstood the catastrophic earthquake in 2015. As a result, Pritzker Prize-winning, disaster-relief architect Shigeru Ban designed housing structures for the victims.

Ban’s modular housing concept is modelled on the traditional homes that survived the earthquake. His design uses wood frames for the structure, cardboard tubes for the truss system of the roof, and debris from the disaster as infill for the wall. Thatch and plastic sheeting provided an extra layer of protection on the rooftop.

Women’s Centre in Darya Khan
Women’s Centre in Darya Khan

3. Women’s Centre in Darya Khan, Pakistan, Yasmeen Lari, 2011
Pakistani architect Yasmeen Lari (the first woman architect in Pakistan) showcases architecture’s role and influence in society. Throughout her career, the 75-year-old designer has built over 36,000 homes for earthquake and flood victims throughout Pakistan. She is also the founder of Heritage Foundation of Pakistan, which allows architecture students to train local residents to rebuild their homes and communities after a disaster using natural resources like bamboo and mud.

One of her well-known projects includes the Women’s Centre in Darya Khan, Pakistan. Lari holds a deep affection for Pakistani women, who are typically displaced and struggling with the care of their children following a natural disaster. The layout allows women to unite and socialize and keep their children safe. And in the event of a flood striking, the first floor is high enough so that waters cannot reach it.

Sustainable post-tsunami reconstruction master plan for Constitución
Sustainable post-tsunami reconstruction master plan for Constitución

4. Post-tsunami sustainability plan for Constitución, Chile, Elemental, 2014
After 2010’s deadly earthquake shook the coastal cities of Chile, plans for rebuilding and protecting cities like Constitución became a priority. In an effort to work with nature and the community, Pritzker Prize-winning architect Alejandro Aravena’s firm Elemental, proposed the intriguing method to plant more trees along the coast to absorb waters and prevent flooding.

The idea is that there is an opportunity to do something that would have long-term positive impacts, rather than a temporary fix that might be ruined by another major earthquake or tsunami in the area. The project will hopefully address short-term needs as well as potential long-term problems.

Ideas for rebuilding Hoboken, New Jersey after Hurricane Sandy.
Ideas for rebuilding Hoboken, New Jersey after Hurricane Sandy.

Resist. Delay. Store. Discharge. A Comprehensive Urban Water Strategy

Resist. Delay. Store. Discharge. A Comprehensive Urban Water Strategy
Resist. Delay. Store. Discharge. A Comprehensive Urban Water Strategy

5. Rebuilding of Hoboken, New Jersey after Hurricane Sandy, OMA, 2012
Following the disastrous Hurricane Sandy that struck the Northeastern United States in 2012, about 80 percent of Hoboken, New Jersey homes were flooded, leaving the community wondering how to rebuild itself with an emphasis on flood defense.

That’s when Dutch architect Rem Koolhaas’ firm OMA offered a solution that would combine hard infrastructure and soft landscaping, integrating coastal defense and natural drainage to protect against future flooding. The ideas between OMA’s and Elemental’s projects are very similar in that they look to work with nature rather than avoiding it.

Fernie told Dezeen that OMA offers a multi-pronged approach: resist, delay, restore and discharge. It acknowledges the complex water system and works with it, he said.

Small Projects Often Mean Greater Innovation

Small projects often embody more innovation than larger more costly or high profile ones.

Innovation is a wide concept that includes improvements in processes, products and services. It involves incorporating new ideas which generate changes that help solve the needs of a company and so increase its competitiveness. That’s hardly big news. But what may be surprising to some is that innovation has itself, well, innovated and it isn’t what it used to be.

New materials and energy, design approaches, as well as advances in digital technology and big data, are creating a wave of innovation within the construction industry. These new ideas are increasingly often tested and proven on smaller and agiler projects. Investing time and money is well spent on  these  ideas and technical improvements can then be used on large-scale developments.

Here are  three exciting small projects:

Vanke Pavilion - Milan Expo 2015 / Daniel Libeskind
Vanke Pavilion – Milan Expo 2015 / Daniel Libeskind
Vanke Pavilion - Milan Expo 2015 / Daniel Libeskind
Vanke Pavilion – Milan Expo 2015 / Daniel Libeskind
VANKE PAVILION Milan, Italy
VANKE PAVILION
Milan, Italy

1. Vanke Pavilion – Milan Expo 2015

The  corporate pavilion for Vanke China explores key issues related to the theme of the Expo Milano 2015, “Feeding the Planet, Energy for Life”.

Situated on the southeast edge of the Lake Arena, the 800-square meter pavilion appears to rise from the east, forming a dynamic, vertical landscape.

The original tiling pattern would have resulted in thousands of ceramic tiles of different sizes and shapes. The resulting complexity and lack of repetition could have led to high costs and a longer erection time.

Working with Architects Studio Libeskind, Format Engineers  (Engineering Designers with backgrounds in structural engineering, coding, mathematics, and architecture) changed the pattern from thousands of different tiles to less than a dozen and  simplified the  backing structure generating  huge cost savings. Format Engineers also proposed ‘slicing’ of the building and then fabrication of  the primary structure of steel ribs using  low tech flat steel plate elements.  These were then used in a series of long span portalised frames reminiscent of the ribs and spars in traditional boat building  resulting in a  column-free area for the display of Chinese Cultural Heritage.

The frame was built to a budget and without difficulty ahead of the neighboring Expo buildings.

Building Size
12 meters high
740 mq gross floor area (exhibition, service & VIP levels)
130 mq roof terrace

Architect:  Studio Libeskind

Engineer:  Format Engineers

Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion

2.  Oxford Brookes Rain Pavilion

The Rain Pavilion is an urban forest sculpture forming the front entrance to Oxford Brookes University’s Architecture Faculty.

“Rain Pavilion artwork is a sensory experience for the community.”

The complex form required extensive wind modeling and comprehensive structural analysis within a generative 3d model. This was allied with Format Engineers in-house code for the self-organization of voids and their subsequent redistribution.

.At each stage of the design process different modeling and analysis techniques were used to exploit the form and to optimise the structure. The considerable challenges posed by the slenderness of the structure and its dynamic behavior under wind were resolved by combining Computational Fluid Dynamics (CFD)  (a branch of  fluid mechanics  that uses numerical analysis and algorithms to solve and analyze problems that involve  fluid  flows) with a generative design environment. Conceptual design introduced the ideas of tubular stems and folded steel canopies, both of which were  perforated by circular holes arranged to allow the interplay of light and water through the structure. The voids were generated using a self-organizing process.

Grasshopper  (a graphical algorithm computer 3-D modeling tool)  was used  to produce a mesh that could include the voids in both the stems and the petals.

The Rain Pavilion is designed to celebrate the sound of rain, and the noise of water interacting with different sections of the installation is part of the experience of passing through it. The structure has a design life of five years and can  be transported to other locations.

Architect:  Oxford Brookes University, Oxford, UK

Engineer:  Format Engineers

KREOD Pavilion
KREOD Pavilion
KREOD Pavilion
KREOD Pavilion
KREOD Pavilion
KREOD Pavilion

3.  KREOD Pavilion

The KREOD pavilions were first erected on the London Greenwich Olympic site in 2012.  Easily rearranged, three pod-like pavilions were formed with a wooden structural framework comprised of an open hexagonal composition.

Standing three meters tall, each double-curved wooden shell enclosed a footprint of 20 square meters,  totaling 60 square meters. A  waterproof tensile membrane sealed the interior from the elements fully portable with demountable joints,  the individual components can be  stacked for efficient transportation.

Chun Qing Li the architect required a temporary exhibition or function space that could be erected and demounted mostly by hand and by untrained staff. The quality of finish needed to  echo that of handmade furniture and had to be low cost and quick to erect. The continuously changing double curved form of the enclosure meant that in theory, every nodal connection was  different. A conventional bolted solution would have cost hundreds of pounds per fixing. Format Engineers  suggestion of a ‘reciprocal’ jointed timber grid shell required standard  bolts which equated to a fraction of the normal cost. It also allowed the structure to be built from simple and light flat timber elements.

The structure used Kebony timber throughout, a sustainable alternative to tropical hardwood. As this material had not previously been used in a structural context Format Engineers undertook load testing of the material and the connections at the University of Cambridge. The timber was fabricated using CNC routing (a computer controlled cutting machine)  allowing a highly accurate fit between members and basic  erection on site.

Architect:  Chun Qing Li  

Engineer:  Format Engineers

 

9 Suggestions for Overcoming Barriers to Good Design When Using Modern Methods of Construction (Mmc)

The term ‘Modern Methods of Construction’ (MMC)  embraces a range of technologies involving various forms  of prefabrication and off-site assembly.

MMC is increasingly regarded as a realistic means of  improving quality, reducing time spent on-site, improving  on-site safety and addressing skills shortages in the  construction of UK housing.

Bridge Crossing Modern Design
Bridge Crossing Modern Design

The variety of systems now available potentially allows the  designer enough choice to sidestep problems deriving  from constraints posed by the use of any one method.  MMC systems, from closed-panel timber framed  systems to bathroom pods are a palette from which  designers can make choices. They are not necessarily  stand-alone solutions that anticipate all the needs of  an individual site and can be mixed and matched  as appropriate.

These limitations are not obstacles to achieving the good design in MMC-based schemes, but may hinder  the incorporation of more complex and innovative  types of MMC from which greater overall benefits  may be obtained  which  are considered under the  following headings:

1. COST UNCERTAINTY

There is no doubt that, given products of comparable  performance the key issue in purchases of MMC construction  systems is the price. At present not enough is known  about the potential costs of using volumetric and  closed panel systems to enable confident specification  at an early date. This inhibits designers from exploring  the full potential of MMC systems. This is particularly true of the less repetitive,  small, one-off scheme, where a smaller margin  of benefits is gained from using MMC. The principal  barrier to the uptake of MMC, therefore, seems  to be the perception of cost uncertainty with respect to using more complex systems.  Without doing substantial project-specific research,  consultants and their clients simply do not know with  enough degree of certainty how much the volumetric or  closed panel systems are likely to cost, and what  would be the savings to overall project costs produced  by potential speed gains to offset against increased  capital expenditure.

This is due to the complexity of assessing the ratio of  cost of repetitive elements where pricing is relatively  straightforward to the cost of adjusting elements or  building in another method for the abnormal condition.  Decisions to use innovative systems are likely to be  made once designs are well progressed to enable  teams to be more certain of costs. This can increase  the potential for change or result in design compromise  as the designer attempts to incorporate the specific  limitations of a particular system in their design.

In an attempt to improve this situation, the MMC consultant and or clients  could  pull together a  directory of MMC  expanded to include cost comparison data. The huge  range of variables involved inevitably makes this  difficult, but a database of current construction cost  information  would be an  invaluable resource.

Contemporary Building Facade
Contemporary Building Facade

2. PLANNING PROCESS AND EARLY COMMITMENT  TO A SYSTEM

The time it can take to obtain planning permission has  obvious implications both for project cost but also, in  some circumstances, for architectural  design innovation.

Most of the more complex types of MMC have an  impact on dimensioning, the choice of external finish  and detailing may have some effect on the buildings  mass. Therefore,  the construction system should be  chosen prior to a planning application to avoid  abortive work, redesign or amendment, or even  resubmission for planning permission.

However,  developers  whose money is at risk, frequently hold  off deciding on the construction technique until the last  practicable moment, in order to get any advantage from  fluctuations in material or component pricing.

Given the potential for lengthy duration of planning  applications, this means that there is little incentive to  prepare initial designs for planning with a prior decision  to incorporate MMC firmly embedded. In cases where  the developer has a financial or business link with the  supplier, this is less likely to be the case. As the majority  of commercial or  residential developments involve some kind of arrangement with a developer, agreement on construction systems is often left to the stage after planning.

3. TIME INVESTMENT

Another very significant factor is the time investment required at  the early stages of projects. This is needed to develop the design when the project is still at risk. There is a  direct relationship between the scale and complexity of  MMC component and the amount of time required to  develop a design at an early stage.

The introduction of advanced or complex MMC  techniques into the design process is potentially costly  to the design team. A significant amount of research is  needed to explore alternative systems, to obtain  verification of suppliers’   credentials, investigate  mortgage and insurance issues, visit previous sites,  talk to system suppliers, obtain technical performance  guidelines, understand junctions and interfaces, coordinate  other consultants, obtain building control input  and so on.

For a consultant, the only way of investing in this  research is either through timely payment of increased  fees by a visionary understanding client or through the anticipation of increased future productivity through repetition when a  project is phased, or large enough, or likely to be  followed by another similar project.

The potential of learning a system and then being able  to repeat lessons learned efficiently is a powerful  incentive for both client and consultant. By contrast, HTA’ s project at Basingstoke is an example  of a phased project with a three to four-year duration allowed the design team to repeat  various elements of the design, and the manufacturer to  develop improved solutions to technical and supply  problems.

HTA’ s project at Basingstoke
HTA’ s project at Basingstoke

4. INSUFFICIENT COMMUNICATION

Improved dialogue at the outset of the  project is  vital if design quality is to be  maximised. Constraints and opportunities implicit within  a particular system are more easily incorporated into  design if partners communicate pre-planning.  Increased early communication can be fostered through  improved long-term partnering relationships.

Clients  should also partner with a range of suppliers and  architects so that choice and flexibility is not restricted.

5. INEXPERIENCE

Generally, the inexperienced client or design team will  have to do more research, with the result  that there is likely to be significant design development  without a specific system being incorporated.

This is a  disincentive to using a more complex system involving a  higher proportion of MMC, where early decision making  and knowledge of a system’ s capabilities have a decisive influence on the nature of the architecture.  However,  encouraging the take up  of MMC through the use of a dedicated funding mechanism may  assist clients  in  finding time for  research into suitable MMC techniques.

Dome Construction Berlin
Dome Construction Berlin

6. SUPPLIER’S ROLE

Site capacity  studies and early stage pre-planning design studies  could be undertaken directly by system suppliers  on behalf of clients, cutting out the usual procedure  of commissioning design work by independent  consultants.

7. ASSUMPTIONS

There are a  number of assumptions that  are generally held about certain types of MMC that may  have been valid at one time but are no longer true today.  There is a need for reliable and up to date information  comparing system criteria, performance data, timescales, lead in times, capacity, construction time,  sequencing issues, limitations, and benefits.

Therefore  it would be helpful if a forum  for discussion and experience exchange was set up.

8. DEMONSTRATING THE BENEFITS OF MMC

There is still a large amount of skepticism about the  need to go very far down the line with MMC. This is  reflected in the acceptance of the desirability of  maintaining or indeed enhancing the pool of traditional  craft skills throughout the UK.

A balanced view is that there is a demonstrable need  for the wider use of MMC which is recognized by both  industry and government.  The best way for clients  and the public generally to  become more confident and knowledgeable about the  quality of design achievable through MMC is to see it  demonstrated.

9. FINANCIAL INCENTIVES

There is no doubt that spreading the burden of  investment through the life of a project helps to ensure  a higher standard of specification and hence quality. In  the Netherlands, a ‘ Green Financing’   system has been  developed by the Dutch government that provides  favorable loan finance when certain sustainable  standards are reached. In the UK, the Gallions HA  has  pioneered  a study of this, based on a scheme in  Thamesmead, ‘ the Ecopark project’.

Eco Park is an eco-friendly business park built on the False Bay coast. This business park is at the cutting-edge of sustainable design and offers a unique working environment in a secure, well-managed facility.
Eco Park is an eco-friendly business park built on the False Bay coast. This business park is at the cutting-edge of sustainable design and offers a unique working environment in a secure, well-managed facility.

Prefab Comeback

Prefab  housing suffers from bad stigma due to the fact that some people saw the prefabs as ugly and characterless, and were afraid they would become slums – hardly the promised housing fit for heroes  following the second World War. However, building homes from pre-made parts can save time and money.  The term prefab or prefabrication often evokes thoughts of poor construction, substandard living conditions and a long-standing “temporary” solution.

Prefab dwellings are making a comeback driven by a lack of affordable housing, a rapidly growing economy and changing demographic trends.  

Methods Methods of Construction (Mmc) Offer Significant Potential to Minimise Construction Costs

The term ‘Modern Methods of Construction‘ refers to a collection of relatively new building construction techniques that aim to offer more advantages over traditional construction methods. Off-site construction (OSC) is a modern method of construction, based on off-site manufacturing of building elements.

With exponentially lower construction costs, quicker construction, reduced  labor costs and having the ability to achieve zero defects, MMC is gaining a lot of attention as the  potential answer to the UK’s housing crisis.

In a valiant attempt to strip away prefabricated housings’ bad rep are MMC with contemporary sleek designs, and constructed to withstand the test of time. MMC housing has the capability to deliver both quality and quantity housing to the tune of ‘ £50,000 per unit.

MMC units hold the promise of being extremely  energy efficient and environmentally sustainable. Many versions of MMC take into account how to utilise natural resources and reduce each unit’s carbon footprint. In addition, MMC also addresses environmental concerns by creating much less waste than a standard brick-and-mortar project. While it is plausible that a traditional build could hire a waste removal company who would have the ability to recycle up to 90 percent of the construction waste; with MMC projects, this will automatically happen.

M-house (pronounced “mouse
M-house (pronounced “mouse”)

There have already been a number of successful examples of MMC housing constructed in various parts of the United Kingdom. The M-house (pronounced “mouse”) is designed and constructed to last an upwards of 100 years. While Architect Alford Hall have created quality MMC apartment buildings proudly showcasing a patio and private entrance for each flat.

Architect Alford Hall
Architect Alford Hall
Compass House by AHMM
Compass House by AHMM

While many of the MMC homes  are still in their early years the upkeep and maintenance will be reduced by 50%  since the OSC  process lowers the risk of non-conformities.

MMC homes are being fabricated and designed to accommodate many different lifestyles, such as, two-story homes, tall six-story apartment buildings, single-family homes and log cabins are all available options for families looking at MMC.

While there is a plethora of design options available all MMC  OSC  projects have a common theme. The internal workings of the homes are fabricated off-site, while only the “outer skin” comes to fruition on-site. To even further streamline the process, it has been suggested that having a “catalog of pre-selected materials increases supplier relationships and makes the design process more streamlined.”

With the small sample available with progressive MMC systems, it is currently reasonable to conclude that using modern methods of construction to build homes can cost more than traditional home building procedures; due to the need for specialised MMC design consultants. However, outside of costs, MMC remains a faster home building method than traditional brick and block house building and is slowly  becoming a relevant front-runner to answer the  UK’s housing shortage.

 

As seen on