Politics and Project Management, a Lesson in Leadership

We all know that the more power you have, the better you are able to get the job completed. The problem is most project managers have lots of responsibility, but hardly any authority and since most projects exist outside core business structures, they are forced to develop other methods of influence.

One unspoken evil that is often ignored on project management training courses is the politics of project management. While most of us view politics with disgust; there is no refuting that effective project managers are often seen as those who are equipped and able to employ fitting political strategies to further their project goals. 

“In a Perfect World the Best Workers Would Be Promoted on Merit Alone and the Best Ideas Would Be Adopted Regardless of Personal Interest – but We Do Not Live in Utopia”

Have you ever included ‘office politics’ as a risk on your risk register? Probably not. Though, consider the potential implications of ignoring the ugly stepchild of project management?

“The Objective of Office Politics Is to Manipulate a Situation in Order to Achieve an Outcome That Will Benefit One Individual or Group at the Expense of Other Individuals or Groups.”

While it is unlikely that ‘office politics’ would be listed directly as a risk on your risk register, it is quite likely that one or more of the outcomes of it would. As a result, if you want to survive and prosper in the real world you need to combine good work with smart politics to ensure your own success and that of your projects. The biggest mistake a project manager can make is to assume that politics in project management doesn’t exist. After all, politics is human nature and has played an integral part in history since the dawn of civilization.

In a group where working interactions are fraught with tension and individuals have their own personal agendas or want to be “top dog” personal conflicts will often get in the way of the project aims. Issues between members of the team become the over-riding concern both for the individuals afraid and sometimes even the project manager. Meetings can consist of jostling for power or simply trying to justify your position and when that happens progress on the project will undoubtedly suffer.

For most project managers, playing politics is a form of slow, soul-destroying torture where logic, self-control, transparency and trustworthiness are replaced by deception, concealment, and sabotage. However, ignoring the external and internal politics surrounding your project or organization is dangerous. Successful project managers need to understand organizational politics and how to make them work for project success.

In the case of project politics you can use these key techniques in a constructive manner:

Carefully Manage Your Own Conduct

  1. The first rule is to at all times act in a way that commands respect and beyond that, respect others. That means not gossiping, spreading rumors or getting sucked into interpersonal conflicts and arguments. Maintain your honesty!
  2. Be positive as a positive outlook is a choice that you can always make and remain professional. 
  3. Be confident and firm but not hostile and make sure you take organizational perspectives, not a personal one when voicing objections or giving criticism.
  4. Always assume things will be disclosed, so don’t rely on confidentiality.
  5. Over time you will learn what works in your organization’s culture and what doesn’t. Try to watch other people and identify successful behaviors that you can model to navigate the political minefield.

Review the Organization Chart

  1. Sit back and watch for a while. Identify the real influencers, those who are respected, champions, those who have authority but don’t use it, the mentors and last but not least the true brains behind the organization. Then re-map the organization chart in terms of political influence as politics will often bypass the formal organization chart.

Understand the Social Network

  1. Once you know who’s who in the organization, you have to understand the social networks. This involves identifying who gets along with whom, groups or cliques that have formed and ongoing interpersonal conflicts. Over time you will learn who has the most trouble getting along with others and the basis for the interrelationship whether it be friendship, respect or manipulation, including how the influence flows between all parties.

Build Good Relationships

  1. Now you need to build multiple networks but avoid aligning yourself with one group or another this way you can keep your finger on the pulse of the organization.
  2. Don’t be afraid of politically powerful people and instead, develop relationships that cross the formal hierarchy in all directions.
  3. Build your relationships on trust and respect and avoid empty flattery.

Use Your Social Network

  1. You will need to learn to use your social network to stay clear of negative politics. You can do this through positive political action.
  2. Use your network to gain access to information, build visibility of your achievements and improve difficult relationships.
  3. Attract opportunities where you can shine and seek out ways to make yourself, your team and your boss look good.

Counteract Negative Play

“The Expression, Keep Your Friends Close and Your Enemies Closer” Couldn’t Be Any Truer When It Comes to Office Politics.”

  1. Your mapping of the organization will help you to identify those people who use others for their own political purposes, and not for the common good. Know that these people typically have low self-worth (that’s why they rely on destructive politicking to get ahead). Always be very careful what you say to them.  Understand what motivates them, their goals, and how to avoid or counter the impact of their politics
  2. Remember loyalty is not a reliable factor in the workplace!

“It is easy to become a target if you’re ambitious or if you strive for change. One of the biggest mistakes we make in our career is to assume that everyone likes progress. This is not true’Å —’Å many are content with the status quo and will defend it with their life.”

Projects are rarely easy and office politics can compound other sorts of problems that arise so they need to be dealt with swiftly and firmly. 

Top 10 Project Management Myths Debunked

Since the dawn of time, mankind has used myths to make sense of the uncertainty that surrounds us.  In the early 1990s  a lot of  people believed that project management was the best kept secret in business.  However,  because project management was not  seen as a  prevailing profession at that time, it suffered from a lack of awareness  which was  in a sense, a double edged sword. Those who were knowledgeable in the practice of project management became extreamly valuable to organisations and pioneers for  the profession.

These early adopters were able to convince organisations that project management practitioners were needed.  Myths around project management began to form in the business community  and as the role of the  project manager was unclear, questions were raised as to what project management was  and what it could offer organisations.

The definition of the word myth is a “widely held, but false belief or idea.” Here, we’re going to examine 10 of the most pervasive PM myths that have emerged.

Myth #1 – Contingency pool is  redundant  

This is one of the most ‘mythical’ myths that has plagued the industry  for a long time. Coupled  with the tendency to presume that ‘real work’ is tantamount to implementation or building something concrete and you have the perfect recipe for project disaster.  The thought pattern behind this approach typically originates from budget constraints and/or having unrealistic expectations. As we all know, or should know, the unexpected happens quite regularly. An effective contingency plan is important as it aims to protect that which has value (e.g., data), prevent or minimise disruption (e.g., product lifecycle), and provide post-event feedback for analysis (e.g., how did we fare? did we allocate funds correctly?).

Myth #2 – Project Management software is too expensive

If your idea of project management software involves purchasing servers, and purchasing a software application from a major vendor for a small practice with 10  practitioners  then, yes, it  is too expensive. If, however, you have gone cloud and elected to use a powerful web-based project management solution (such as Smartsheet), then you are likely to save thousands of pounds while reaping the benefits of a pay-as-you-go price structure. The present, and future, lie in cloud solutions that provide equal, or superior, functionality at a fraction of the cost.

Myth #3 – Project Management methodologies will slow us down

Project  managers  have  a reputation of using  process-intensive  methodologies  that favour ideology over pragmatism. In some instances this may, indeed, be the case when  there is a mismatch between a specific project management approach and the organisation’s acutall needs (e.g., a process-driven method, such as PRINCE2, may not be appropriate for a slightly chaotic environment that favours an adaptive approach, such as Scrum). So, in sum, put down the paint roller (“Project Management isn’t for us!”) and take out your fine-bristled brush (“The Critical-Chain method may not be our cup of tea, but Agile on the other hand”¦”).

Myth #4 – Facts and figures are more important than feelings and perceptions

While facts are very important, projects are often derailed and sabotaged because of false perceptions.  The PM must pay attention to both fact and fiction to navigate through turbulent  organisational change.

Myth #5 – Project managers need to be detail oriented and not strategic in nature

While it is of the utmost importance for the project manager to understand how to read the details of the project, they must also understand how the project supports organisational objectives.  Having a strategic perspective adds great value to the skill-set of the project manager.

Myth #6  Rely on the experts in everything that you do

It is true, we do need to rely on the experts but our trust can not be a blind faith.  The job of the project managers in this area is twofold.  First we must extract information and second we must verify that the information is accurate.  A good example of this is asking a planner  to provide an estimate on the effort required to perform a task.  In some instances team members forget to include tasks which ultimately results in a faulty estimate.

Myth #7  All the battles have to be fought and won so that we can succeed

Project managers sometimes make the assumption that they need to stand firm to get the job done, however, coming to compromise  on a particular issue is often a better course of action  in order to  win the war.

Myth #8 Project Managers  can wear multiple hats  

Wearing different hats can be extremely confusing.  This is especially true if the project manager is asked to be a business analyst or technical expert on top of serving in their PM role.  They end up doing  both roles with mediocrity.  When we “wear two hats” we essentially tell ourselves that both hats fit on one head at the same time. However, what happens if the demands of two roles conflict  and what assurances do we have that we’re managing the inherent conflict of multiple roles  and the  risks the  roles introduce? Sadly, multiple roles become more common as we move up the management hierarchy in an organisation, and that’s exactly where potential conflicts of interest can do the most harm.

Myth #9  Once the risk register is created, it’s full speed ahead

Risk management provides a forward-looking radar. We can use it to scan the uncertain future to reveal things that could affect us, giving us sufficient time to prepare in advance. We can develop contingency plans even for so-called uncontrollable risks, and be ready to deal with likely threats or significant opportunities.  Too often, it’s not until a catastrophic event occurs and significantly impacts project progress that ongoing risk reviews are conducted.

Myth #10 Project managers can not be effective in their role unless they have specific technical expertise in the given field that the project falls  within

You don’t need to be an engineer to manage a construction project or a IT  technician to manage a software development project.  All you need is a  fundamental  understanding with strong PM skills to manage  the team.  Experience in the field helps but does not guarantee success.

Project management is challenging enough without the myths. The profession has come a long way since the 1990s and some of these myths are fading. However, we still see remnants of them in one form or another.  Great projects cut through false assumptions and confusion, allowing their teams to make smart decisions based on reality.

These are just 10 project management myths, what are yours?  

Transformation House: Former Granada Cinema, 58 St Johns Hill

Former Granada Cinema, 58 St Johns Hill

Off-site manufacture of housing is  not without its opponents,  particularly in the traditional masonry  sector who lobby hard for a site based  approach which is low in  capitalisation and highly responsive  to the changes in economic  circumstances.  Prefabrication, they argue, is given  unfair prominence through  government support and is not the  answer to the typical homeowner’s  desired property. More precisely they  argue that prefabricated homes are  lightweight and therefore lack  solidity and thermal mass and are  unproven in their durability.

Transformation House: Former Granada Cinema, 58 St Johns Hill

The Grade II Star Listed Conference Centre formally the Granada Cinema has been sympathetically refurbished to portray the splendour and stunning architectural features of the original building.

Site history: Former Granada Cinema
Architect: Assael
Site area: 0.25
Gross internal area: 8,830
Number of dwellings: 59
Density: 236
Plot ratio: 1:3.5
Construction value:  15,000,000

Many attempts were  made  to revive this Grade II* listed building,  which  was  on the English Heritage  Buildings at Risk register. It has been  vacant since 1997. All previous  proposals included intrusive  modifications to the magnificent listed  interior.

This final proposal by Assael was  based on the  premise that it should allow for new  construction without affecting the  internal spaces. The solution was to  suspend lightweight prefabricated  modular residential units from full  arches over the auditorium. In so  doing, the auditorium would remain  untouched by intrusive columns  required by other more traditional  construction methods. The listed  ceiling would also be retained.  Materials used would be glass, timber  and steel. In addition, the design  would ensure a total physical and  acoustic separation of the uses.  Within the development all  residential units would have access  to a terrace or balcony. Winter  gardens, sun rooms and terraces  have been staggered to prevent  overlooking, whilst the planting  between arches acts as privacy  screens.

The auditorium is 34, 600 sq ft, and has the capacity for 2,500 attendees.  Transformation House is surrounded by a lively mix of bars, restaurants, cafes and shops on Battersea rise, St Johns Hill, Lavender Hill and Northcote Road.

 