The State of the Union 

Each year the President delivers to Congress the annual State of the Union Message and across America governors of their respective states deliver their State of the State messages to the various legislatures. Its purpose is to summarize the status of various things throughout the land and to make a change, for the chief executive to suggest legislative action…  

I sat and watched the president give his state of the union message not too long ago. He started by saying that the state of our union is strong. He cited several achievements during his administration and glossed over several storms.  

Today, what it would be like if God had come to the podium and delivered His state of the union message. I’ll bet he wouldn’t hold anything back or not tell it like it is. 

I wonder what he would single out first. Perhaps he would talk about the rampant proliferation of pornography. Certainly, he would mention rampant sexual immorality. Maybe he would remind us that we are about to enter a post-Christian era as we have turned our back on Him. He would give reference to tolerance ‘which says we must tolerate the beliefs of others and not thrust ours upon them. He would challenge us to be bold in speaking of our faith. He would talk about a watered down feel good’ theology and modern preaching that de-emphasizes the salvation message. He might remind us that we seem to have forgotten Him while focusing our attention on ourselves and our hedonistic pleasures. Maybe He would talk about sexual disorientation rampant across our land. He would paint a grim prognosis for the land if its people do not return to him. Certainly, He would quote from Revelation. 

“But seek first his kingdom and his righteousness, and all these things will be given to you as well. Therefore do not worry about tomorrow, for tomorrow will worry about itself. Each day has enough trouble of its own.” Matthew 6:33-34 

Let’s Pray 

Yahweh, there are many opponents to Christians in the world today. Father, help me to have a healthy spiritual state and keep in the forefront of my mind that I am in a war, not against flesh and blood, but against the evil powers of the spiritual realm. Please God Embolden me to be a formidable soldier for You and join in the battle to fight for You. Clothe me in the Armor of God and energize my spirit. Make me bold. Make me strong. In Christ’s name Amen. 

The chosen one – Millions of Americans Believe God Made Trump President

The Ungodly American

Two years into Trump’s tumultuous presidency, evangelical Christians remain some of his most loyal supporters.

A pastor recently stated on a popular evangelical Christian TV show that he interceded on behalf of Donald Trump to get him elected as president of the United States–and that those busy at work trying to get him removed are “fighting against God.”

He said: “We stood in the courts of heaven, in the council of the Lord, and in that council, God told me to make a decree out of James 1:11, which is, ‘All flesh is as grass, and flower is as the glory of the grass.’

On the Jim Bakker Show, Robert Henderson said that he had a prophetic dream in March 2016 in which Trump asked him to promote his presidential campaign in heaven he said, to cheers from the studio audience and a cry of “wow” from the host.

“We did that and that’s exactly what happened.”

Henderson was promoting his book Prayers and Declarations that Open the Courts of Heaven, which was advertised  during the segment.

“We did that and that’s exactly what happened,” he said, to cheers from the studio audience and a cry of “wow” from the host.

Henderson was promoting his book Prayers and Declarations that Open the Courts of Heaven, which was advertised  during the segment and retails for $25. It comes with a three-lesson DVD set. 

Its mission statement describes how it the church “must become the government God intended instead of just a place of meeting needs,” and that nations should “shift from their present state into a kingdom culture.”RELATED STORIES

White Evangelicals Are Still the Heart of Trump’s Base

Trump has been a divisive figure within the evangelical community, with some prominent evangelicals – like Jerry Falwell, Jr., the president of Liberty University – staunchly defending Trump and his policies.  A recent Pew Research poll found that 69 percent of white evangelicals supported him. This figure has been as high as 80 percent during his presidency. Others still, like Beth Moore, who has a large following of mostly female evangelicals have openly oppose Trump. And some leaders, like Rick Warren, the pastor of Saddleback megachurch in Orange County, California, which serves more than 20,000 congregants on a weekly basis, have expressed mixed feelings about Trump.

Donald Trump Facts

  1. His full name is Donald John Trump.
  2. Donald Trump is 72 years old, he was born on 14th June 1946 in New York City, New York.
  3. He has been married three times. First to Ivana Zelnickova from 1977-1991, then to Marla Maples from 1993-1999, and Melania Knauss from 2005 to present.
  4. He is the second youngest of five children.
  5. Trump does not smoke nor drink. The death of a sibling, his older brother Red Jr., urged Donald toward these decisions.
  6. He is of German and Scottish ancestry.
  7. Trump’s family fortune began when his grandfather Frederick Trump pulled in a fortune by operating restaurants and boarding houses in the boom towns of Seattle and Klondike, Canada.
  8. He attended the New York Military Academy aka NYMA to whom he credits much of his success to.
  9. Trump attended Fordham University, Wharton School at the University of Pennsylvania and graduated Wharton in 1968 with a Bachelor of Science degree in economics.
  10. Trump avoided being drafted into the military by getting four student deferments. After being determined twice to be fit for duty, he got a 1-Y medical deferment in October of 1968. Then in December 1969 he received a high placement number in the draft lottery that exempted him from service.
  11. His first real estate venture was with his family’s company, Elizabeth Trump and Son, where he was given control of in 1971 and renamed it The Trump Organization. The project ended up in controversy when the Justice Department in 1973 accused the company of discrimination against Blacks. Admitting no wrongdoing, an agreement between the company and DOJ was struck to resolve the issue.
  12. Donald Trump made his bones, or made his first really big real estate deal happened in Manhattan with the remodeling of the Grand Hyatt Hotel in 1978.
  13. His signature base of operations, Trump Tower, was completed in 1983.
  14. Trump has never filed for personal bankruptcy, but six times he’s filed for bankruptcy for his business properties between 1991 and 2009.
  15. Donald Trump owns and operates around 18 golf courses around the world.
  16. At one time, Trump was part owner of three major beauty pageants, from 1996-2015 he partly owned Miss Universe, Miss USA & Miss Teen USA.
  17. From 2005 until 2010, Trump owned and ran the Trump University LLC, where his courses covered real estate training.Report this ad
  18. He once ran the Donald J. Trump Foundation established in 1988, but was shut down by the NY State Attorney General’s office in 2013 for multiple violations.
  19. Trump became an executive producer of the reality show hit, The Apprenticefrom 2003 until present. The show has been on hiatus due to his presidential run.
  20. Donald is a WWE, World Wrestling Entertainment fan.
  21. He has five children from three of his marriages. Three children from his first marriage to Ivana Trump, Donald Jr, Ivanka and. From Trump’s third wife, he has a daughter called Tiffany. His fifth child was born on 20th March 2006, a boy named Barron.
  22. Donald Trump has eight grandchildren.
  23. As of November 2016 his net worth is $3.7 billion.
  24. Donald Trump won the Republican nomination for President of the United States on 19th July 2016.
  25. He became the 45th President of the United States on 9th November 2016.

Shocking Report reveals 1 in 12 Christians are persecuted around the world: Six women were raped every DAY and 3,000 were killed in 2017

Shocking Report reveals 1 in 12 Christians are persecuted around the world: Six women were raped every DAY and 3,000 were killed in 2017

A Shocking report revealed that 1 in 12 Christians worldwide is suffering persecution for their faith making them the target of vicious savage rape attacks.

The report by Open Doors USA stated that 215 million Christians live in regions with high degrees of persecution worldwide.

Open Doors USA is an organization that studies Christian persecution.

Open Doors USA documented that in statical terms over 3,000 Christians were killed, 1,252 were abducted; and approximately 800 churches were subjected to vandalism in 2017 within the reporting period for the 2018 list.

David Curry, the president, and CEO of Open Doors USA told Fox News. That ‘in maybe a way that he hasn’t seen before, the most disturbing findings suggest that Christian women are among the most violated in the entire world, ‘   David also stated that ‘We need to raise the flag as these are tactics that are being increasingly used by extremists.’

50 countries were identified across the world where following Christianity is most dangerous.

For the second year in a row, the list’s number one cause of Christian persecution is the spread of radical Islamic persecution in 35 of the 50 nations according to the report.

North Korea topped the list as it is an atheist state and public worship is illegal, also as Afghanistan has a conservative Muslim population and lacks a strong central government it wasn’t far behind.

Open Doors USA finds that there has been tremendous growth in underground Christianity in North Korea with over 300,000 Christians practicing their religion behind closed doors for fear of government persecution.

‘In a nation where the ruling regime demands total control over the general public, anything that challenges the government’s power is seen as a threat, including religion,’ Jeff King, president of International Christian Concern, told Fox News. ‘As a result, the North Korean government does everything in its power to squash the spread of Christianity.’

Islamic militancy has also been on the rise in Somalia, where Christians if caught, are usually martyred. Christians in Egypt, India, Libya, and Kazakhstan also experienced increased persecution since last Open Doors report.

“The World Watch List matters. It matters because it is the most trusted measurement of religious persecution in the world today,” CEO David Curry said. “But even more important, the list matters because it’s a spiritual EKG showing the strength and vulnerability of the global Church.”

Open Doors is a non-denominational mission ministry launched in 1955 by the Dutch Brother Andrew, author of God’s Smuggler, which tells the stories of his secret missions to smuggle Bibles into hostile regions.

Open Doors has been monitoring worldwide Christian persecution since the 1970s.

The Church, a Wolf, and Little Red Riding Hood

The Church, a Wolf, and Little Red Riding Hood

Most of us have grown up with many popular fairy tales told to us as children. The legendary story “Little Red Riding Hood” In most versions (although definitely not all of them) there is one common theme: a wolf attacks a young woman through deception.  Like parables, such stories are never intended to convey meaning in every detail. Yet, much of it may draw, even in unsuspecting ways, the reader to precepts or principles pertinent to circumstances behind the story. Such is the following on Little Red Riding Hood.

There is actually a lesson in that theme for God’s people today.

1. The Church. Satan’s wolves do more than disguise themselves as Granny. As Paul warned, they often present themselves as “ministers of righteousness” (2 Corinthians 11:15). Beware of false prophets, which come to you in sheeps clothing, but inwardly they are ravening wolves.

“That’s a lie!” said the wolf. “You won’t die!”

2. The Law. One of the most common deceptions by these types of wolves is the claim that the law was done away with. Using selective sections of the apostle Paul’s writings, these wolves deceive people into crying,  “Oh, what freedom you have!”

This was the very same tactic that Satan employed in the Garden of Eden.

3. False prophets. While these people appear to be godly—they come in sheep’s clothing—Christ said that inwardly they were “ravenous wolves” (Matthew 7:15). These are people who claim to be children of God—but who don’t teach and live the word.

Another  Fake Jesus Christ was recently arrested and remanded in Uganda on Thursday, November 9th, for belonging and managing an unlawful society by the Magistrate’s court.  According to a report by Uganda’s Newspaper, Daily Monitor, the accused claimed not to be under any authority including the police, local council administration or the president of Uganda. The man purporting to be Jesus was arraigned in court alongside his three followers who preferred to be identified with their alias names.

“Who’s afraid of the big bad wolf?”

4. The world. Wake up from your Slumber. Frequently in Scripture believers are exhorted to wake up, to be revived, and they are warned of the dangers of spiritual sleep. Christ warned us “Go your way; behold, I send you out as lambs among wolves” (Luke 10:3). The world is under the sway of Satan.

As a believer in Jesus, we are promised a new life covered under the protection of God in which NOTHING can separate us from His love. Rest knowing that no matter what hardship you face, God is your provider and protector!  Be strong and courageous. Do not be afraid or terrified because of the wolf, for the LORD your God goes with you; he will never leave you nor forsake you.”

5. Wealth. These wolves say, “all this I will give you if you will bow down and worship me.” Christ warned of the “deceitfulness of riches” (Matthew 13:22; Mark 4:19). Your response should be   “Away from me, Satan! For it is written: ‘Worship the Lord your God, and serve him only.’

Do not lay up for yourselves treasures on earth, where moth and rust destroy and where thieves break in and steal, but lay up for yourselves treasures in heaven, where neither moth nor rust destroys and where thieves do not break in and steal. For where your treasure is, there your heart will be also.

“There was something wolfish about them?”

6. Marriage  How many times have we heard the story of the little red riding hood (aka Christian Sister or Brother) who fell in love with a big bad Wolf?    ‘It wasn’t beauty, it was the beast, she or he says in regret.  Being equally yoked is not meant to inhibit our dating lives. Rather, it is a command designed for protection and honor. Being unequally yoked is more dangerous than you think – and waiting for someone with whom you share the same spiritual heritage is far more rewarding than many believe.

Hey, Little Red Riding Hood, where are you going, so alone, so”¦ alone?

7. Relationship. Without Jesus, you can do nothing. An intimate relationship with God is required. That means fellowship with God daily. The big bad wolf was disguised to trick little red riding hood, but the wolf could not mislead her because Little red riding hood knew her grandmother intimately. “My sheep listen to my voice; I know them, and they follow me. – John 10:27”

“You can huff and puff but I will not worship you!”

8. Worship.  Shadrach,  Meshach, and Abednego answered King Nebuchadnezzar, “We don’t need to answer your last question. If our God, whom we honor, can save us from a blazing furnace and from your power, he will, Your Majesty.  Nebuchadnezzar was so filled with anger toward Shadrach, Meshach, and Abednego that his face turned red and he ordered that the furnace should be heated seven times hotter than normal. However,  God commissions His angels to save His chosen ones from calamity, to guard them against “the pestilence that walketh in darkness” and “the destruction that wasteth at noonday.”  

These eight types (or packs, if you will) of “wolves” have plagued Christ’s followers throughout history.

These are just a few of the tricks and deceptions that are used by Satan and his wolves. Some wolves are masters of deception and disguise. They talk like Christians. They use the Bible. They seem like nice people. They are so loving! But they will draw you in to eat you for dinner!

God’s people must learn the lesson of Little Red Riding Hood. Let’s never allow ourselves to fall prey to the Satan’s deceptions.  

Has Nigeria Become the World’s Junk Yard of Abandoned and Failed Mega Projects worth Billions?

Dim1, N. U., Okorocha2, K. A., & Okoduwa3 V. O.

The Nigerian construction industry is mostly concerned with the development and provision of projects such as roads, bridges, railways, residential  and commercial real estates, and the  maintenance necessary for the socio-economic developments contributes immensely to the Nigerian economic growth (Bureau of Statistics, 2015). Butcher and demmers (2003) described projects as an idea which begins and ends by filling a need. However, a project fails when its idea ends without meeting the needs and expectations of its stakeholders.

Nigeria Has Become the World’s Junk – Yard of Abandoned and Failed Projects worth Billions of Naira!

Hanachor (2013), revealed that projects form part of the basis for assessing a country’s development. However,  a damming  report from the Abandoned Projects Audit Commission which was set up by the Ex-President Goodluck Jonathan in 2011 revealed that 11,886 federal government projects were abandoned in the past 40 years across Nigerian  (Abimbola, 2012). This confirmed the assertion by Osemenan (1987) “that Nigeria has become the world’s junk –yard of abandoned and failed projects worth billions of naira”.

Abandoned projects including building and other civil engineering infrastructure development projects now litter  the  whole of Nigeria.

Physical projects do not only provide the means of making life more meaningful for members of the community where the projects are located, successful  projects also  result in  empowerment and collective action towards self improvement (Hanachor, 2013).  

This Issue of Abandonment Has Been Left Without Adequate Attention for Too Long, and Is Now Having a Multiplier Effect on the Construction Industry in Particular and the Nigeria’s National Economy as a Whole. (Kotngora, 1993)

PROJECT FAILURE

Project Failure might mean a different thing to different stakeholders. A project that seemed successful to one stakeholder may be a total failure to another (Toor and Ogunlana, 2008). Some stakeholders, more especially the project users and some private owners, think of failed projects as a situation where a completed building project collapsed, a situation where by a completed dam project stopped working after few days of completion, or a completed road project that broke down after few months of completion. Other experienced stakeholders, such as engineers  and  architects  conform to the iron triangle by Atkinson (1999) which states that the most strategically important measures of project failure are “time overrun”, “cost overrun”, and “poor quality”.

Turner (1993) noted that a project fails when the project specifications are not delivered within budget and on time;   the project fails to achieve its stated business purpose; the project did not meet the pre-stated objectives; the project fails to satisfy the needs of the project team and supporters; and the project fails to satisfy the need of the users and other stakeholders. Lim and Mohamed (1999) cited in Toor and Ogunlana (2009) clarified that there are two possible view points to project failure namely; the macro-level and the micro-level. They further explained that the macro view point reviews  if the original objectives and concepts of the project was met. Usually the end users and the project beneficiaries are the ones looking at the project failure from the macro view point, where as the project design team, the consultants, contractors, and suppliers review projects from a micro view point focusing on  time of delivery, budget, and poor quality.  

In the early 1990s, the failure as well as the success of any project was determined by the project duration, monetary cost, and the performance of the project (Idrus, Sodangi, and Husin, 2011). Belout and Gauvrean (2004), also confirmed that the project management triangle based on schedule, cost, and technical performance is the most useful in determining the failure of a project. Moreover, a project is considered as an achievement of specific objectives, which involves series of activities and tasks which consume resources, are completed within specifications, and have a definite start and end time (Muns and Bjeirmi 1996, cited in Toor and Ogunlana, 2009). Reiss (1993) in his suggestion stated that a project is a human activity that achieves a clear objective against a time scale. Wright (1997) taking the view of clients, suggested that time and budget are the only two important parameters of a project which determines if a project is successful or failed. Nevertheless, many other writers such as Turner, Morris and Hough, wateridge, dewit, McCoy, Pinto and Slevin, saarinen and Ballantine all cited in Atkinson (1999), agreed that cost, time, and quality are all success as well as failure criteria of a project, and are not to be used   exclusively.

FACTORS OF PROJECT FAILURE

Cookie-Davies (2002) stated the difference between the success criteria and the failure factors. He   stated that failure factors are those which contributed towards the failure of a project while success criteria are the measures by which the failure of a project will be judged. The factors constituting the failure criteria are commonly referred to as the key performance indicators (KPIs).  

Time   and Cost Overrun

The time factor of project failure cannot be discussed without mentioning cost. This is because the time spent on construction projects has a cost attached to it. Al-Khali and Al-Ghafly, (1999); Aibinu and Jagboro, (2002) confirmed that time overrun in construction projects do not only result in cost overrun and poor quality but also result in greater disputes, abandonment and protracted litigation by the project parties. Therefore, focus on reducing the Time overrun helps to reduce resource spent on heavy litigation processes in the construction industry (Phua and Rowlinson, 2003). Most times, the time overrun of a project does not allow resultant system and benefits of the project to be taking into consideration (Atkinson, 1999). Once a project exceeds the contract time, it does not matter anymore if the project was finally abandoned or completed at the same cost and quality specified on the original contract document, the project has failed. Furthermore, Assaf and Al-Hejji, (2006) noted that time overrun means loss of owner’s revenue due to unavailability of the commercial facilities on time, and contractors may also suffers from higher over heads, material and labour costs.

Poor quality/Technical Performance

The word “Performance” has a different meaning which depends on the context it is being used and it  can also be referred to as quality. Performance can be generally defined as effectiveness (doing the right thing), and efficiency (doing it right) (Idrus and Sodangi, 2010). Based on this definition of performance, at the project level, it simply means that a completed project  meets fulfilled the stakeholder  requirements in the business case.

CAUSES OF PROJECT FAILURE

A lot of research studies have investigated the reasons for project failures, and why projects continue to be described as failing despite improved  management. Odeh and Baltaineh, 2002; Arain and   Law, 2003; Abdul-Rahman et al., 2006; Sambasivan and Soon, 2007; all cited in Toor and Ogunlana, 2008, pointed out the major causes of project failures as Inadequate procurement method; poor funding and availability of resources; descripancies between design and construction; lack of project management practices; and communication lapses

The contract/procurement method

A result obtained from two construction projects which were done by the same  contractor but using different procurement methods showed that rework, on the design part which occurs when the activities and materials order are different from those specified on the original contract document, makes it difficult for the project to finish on the expected time (Idrus, Sodangi, and Husin, 2011). This is as a result of non-collaboration and integration between the design team, contractor, and tier suppliers. The rework on the design portion has a huge impact on  project failure leading to the time overrun.  The traditional method of procurement has inadequate  flexibility  required  to facilitate late changes to  the project design once the design phase of the construction project has been concluded.

Nigerian most widely used procurement method is the traditional method of procurement (design-bid-construct) which has been confirmed to be less effective to successfully delivery of a construction project (Dim and Ezeabasili, 2015). And, the world bank country procurement assessment report (2000) cited in Anigbogu and Shwarka, (2011) reported that about 50% of projects in Nigeria are dead even before they commence because they were designed to fail.

The way the construction projects are contracted, in addition to the way the contracts are delivered, contributes to the causes of projects failure. Particularly, among the methods of project contracting is lump-sum or a fixed-price contracting method, in which the contractor agrees to deliver a construction project at a fixed price. The fixed-price contract can be low-bid or not however, once the contract cost has been agreed upon the contract award, it cannot be changed. And, contractors are expected to honor and deliver the contract agreement, failure to do so can result  in a  breach of contract which can result in the contractor being  prosecuted.  

Awarding a contract to an unqualified personnel also contributes to project failures. When a contractor places more emphasis on money and the mobilization fee after a construction project has been initiated instead of getting the right workforce and skilled professionals that will execute the project. Instead the workforce chosen will often not be base on competence and required skills rather it will be based on availability. Moreover, poor strategy and planning by contractors who have overloaded with work  also contributed to one of the causes of project failure.

Poor funding/Budget Planning

A lot of public projects in the Nigerian construction industry failed as a result inadequate funding, and the difference between the national annual budget and the budget actual released. Most of the Nigerian public projects are signed  even before the actual release of the national budget. The difference in budget of the contracted project and the actual budget release can get the contracted company stuck as a result of inflation of prices, scarcity of construction material at the time of the budget release and mobilization to site. Also  un-planned scope of work which can be as a result of the contractor working on another contract when he is called back  to  mobilization to start work. Moreover, poor budget planning is a regular mistake made by some contractors by not undertaking feasibility assessments  before starting the design. The construction project should be planned according to the available resources and not according to the unrealistic expectations a  client has in mind.

Discrepancies  Between the Design and Construction

Limited  collaboration between the contractors, engineers, and the architect results in discrepancies between the project designs and construction on site, and further leads to rework. Changes on a project designs, and changing to the scope of work in the middle of construction processes on site can be dangerous, and can lead to time overrun, increase in cost, and most of all can lead to abandonment. Moreover, many cases have been seen where the designs from the architects are not buildable  on site, while   In some cases, most contractors are unable to adequately specify the scope of work for the construction processes on site. Therefore any default on the design by the architect can be an opportunity for the contractor to make more money which might cause the project duration to exceed the time specified on the contract document.

RESEARCH METHODOLOGY

This research starts with a general reasoning or theory which says that the major cases of project failure in the Nigerian construction industry are defined based on time overrun and cost overrun. The findings from the data analysis will help on the decision to accept the theory or not. The research data was collected from the progress report for the month ending of October, 2015 published by the Nigeria of Federal Ministry of works on thirty-nine on-going highway construction projects at the South-South geopolitical zone. The table 1 below shows the information on the data collected which comprises of the project title, contract Number, project description, the contractor that was awarded the projects, the date of project commencement, date of completion and the extended date if any. The scheduled time for each project was specified as follows: project commencement date labeled as “a”,   project completion date labeled as “b”, and the extended date labeled as “c”.

Table 1: The analyzed data on the highway project at the South-South zone in Nigeria.
Table 1: The analyzed data on the highway project at the South-South zone in Nigeria.

image2

image3

image4

image5

image6

image7

image8

DATA ANALYSIS

The data analysis was done with the use of Microsoft excel. The analysis started by obtaining the number of days between the date of commencement of each project and the date of completion to show the duration of each highway project. And, the number of days between the project completion date and the extension date showed the time-overrun. The project duration and the extended days were obtained with the use of NETWORKDAYS function in Microsoft Excel which calculates the number of working days between two dates excluding weekends and any dates identified as holidays.

The standard deviation between the specified project duration for each highway projects and the extended days was calculated to obtain the extent to which each highway project contract failed on its time of delivery. This was denoted as the degree of failure. The table 1 above showed the projects ranking which was done based on the degree of failure of all the highway projects. The highway projects that were ranked from one to sixteen have low degree of failure and are represented with green color, while the rest are those with high degree of failure and are represented with red color.

FINDINGS

The findings made showed that the successfully completed highway projects have no extended days or time overrun, and the successful on-going highway projects are still on schedule and have no extended days unlike the on-going highway projects that have already failed as a result of the extended dates. Other projects have been abandoned because they have exceeded the delivery date as specified on the contract document, and have no extended date of completion. Thus, no work is going on.

Figure 1: Abundance of failed highway projects at south-south zone, Nigeria.
Figure 1: Abundance of failed highway projects at south-south zone, Nigeria.

Figure 2: On-going failed highway projects
Figure 2: On-going failed highway projects

Figure 2 above showed that 14% of highway projects are still on-going projects because they have not exceeded the original date of completion as specified on the contract document. However, they are heading towards failure because they have been given an extended date of completion which can be as a result of some critical activities running behind schedule, causing delay on the critical path network of the projects. Moreover, the other 86% completely failed because they have exceeded their completion date specified on the contract document.

Figure 3: Successful on-going highway projects
Figure 3: Successful on-going highway projects

The figure 3 above showed that 63% of the successful highway projects are still on-going because they have not exceed their completion dates, and they are not yet completed. However, those on-going highway projects might end up as failed projects as a result of poor funding, discrepancy between the design and the construction on site, and conflict between the construction parties or stakeholders.

“Say what you will do, and do what you said” or “Say as you will do it, and do it as you said”

CONCLUSION AND RECOMMENDATION

The idea of knowing what a failed project is, the factors and the causes is very important in project management. Success in project management can neither be achieved nor measured without the knowledge of project failure, its factors, and causes in the Nigerian construction industries. This work has shown that project failure is as a result of exceeded time of delivery, cost overrun, and poor quality. However, the analysis was only done based on exceeded time of project delivery because of the nature of the data collected.

This work suggested a few approaches to help reduce the number of failed projects in the Nigerian construction industry if properly implemented. Firstly, Having good collaboration between the project stakeholders involved in a construction project at the early stage of project conception is most important in order to accomplish the project objectives, and deliver the project on time, within budget, and quality specified on the original contract document (Othman, 2006).

Secondly, Adopting the ISO 9000 technique which is used for quality management will also help in achieving a successful project delivery. This technique states “ say what you will do, and do what you said” or “say as you will do it, and do it as you said”. This technique is not an indication of high quality but it promotes control and consistency which leads to specialization, and improved productivity and quality. Also, adopting the principles of lean construction will help to reduce waste within the construction and stream-line activities in order to improve the on-time delivery of projects.

Thirdly, Learning from the precedent failed projects, how those projects failed, and the reason for their failures. This will help the project manager  to plan and mitigate the risks of project failures in the future. And, finally, more seminars and workshops will help to educate and enlighten clients (the federal government representatives), users, contractors, engineers, and architects on what is project failure, the factors that contributes to abundant failed projects, and their causes.

REFERENCE

Abimbola, A. (Novermber 24, 2012). About 12,000 Federal Projects Abandoned across Nigeria. Premium times (November 16, 2015). Retrieved from www. Premium timesng.com/news/108450-about-12000-federal-projects-abandoned-across-nigeria.html.

Al-Khali, M.I and Al-Ghafly, M.A. (1999). Important Causes of Delays in Public Utility Projects in Saudi Arabia. Construction management and Economics, 17, 647-655

Aibinu, A.A and Jagboro, G.O. (2002). The Effects of Construction Delays on Project Delivery in Nigeria Construction Industry. International journal of Project management, 20(8), 593- 599.

Anigbogu, N. and Shwarka, M. (2011). Evaluation of Impact of the Public Procurement Reform Program on Combating Corruption Practices in Public Building Project Delivery in Nigeria. Environtech Journal, 1(2). 43-51.

Assaf, S. and Al-Hajji, S. (2006). Causes of Delays in large Construction Projects. International Journal of Project Management, 24, 349-357.

Atkinson , R. (1999). Project management: Cost, time, and quality, two best guesses and a Phenomenon, it’s time to accept other success criteria. International Journal of project Management, 17(6), 337-342.

Belout, A and Gauvrean, C. (2004). Factors Influencing the Project Success: The impact of human resource management. International Journal of project Management, 22, Pp. 1-11.

Butcher, N. and Demmers, L. (2003). Cost Estiumating Simplified. Retrieved from www.librisdesign.org.

Cookie-Davies, T. (2002). The Real Success Factors on Projects. International Journal of Project management, 20(3), 185-190.

Dim, N.U. and Ezeabasili, A.C.C (2015). Strategic Supply Chain Framework as an Effective Approach to Procurement of Public Construction Projects in Nigeria. International Journal of Management and Susutainability, 4(7), 163-172.

Hanachor, M. E. (2012). Community Development Projects Abandonment in Nigeria: Causes and Effects. Journal of Education and Practice, 3(6), 33-36.

Idrus, A., Sodangi, M., and Husin, M., H. (2011). Prioritizing project performance criteria within client perspective. Research Journal of Applied Science, Engineering and Technology, 3(10), 1142-1151.

Idrus, A. and Sodangi, M. (2010). Framework for evaluating quality performance of contractors in Nigeria. International Journal of Civil Environment and Engineering. 10(1), 34-39.

National Bureau of Statistics (January, 2015). Nigerian Construction Sector Summary Report: 2010-2012.

Kotangora, O. O. (1993). Project abandonment, Nigerian Tribune.

Osemenan, I. (1987). Project Abandonment. New Watch Magazine, Vol. 1, pp. 15.

Othman, M.,R. (2006). Forging main and sub-contractor relationship for successful projects. Retrieved from http://rakanl.jkr.gov.my/csfj/editor/files/file/projek/lessonslearned/MAIN&SUB_2.pdf

Phua, F.T.T and Rowlinson, S. (2003). Cultural Differences as an Explanatory Variable for Adversarial Attitude in the Construction Industry: The case of HongKong. Construction Management and Economics, 21, 777-785.

Reiss, B. (1993). Project Management Demystified. London: E and FN Spon Publishers.

Toor, S. R. and Ogunlana, S. O. (2008).Problems causing Delay in Major Construction Projects in Thailand. Construction management and Economics, 26, 395-408.

Toor, S. R. and Ogunlana, S. O. (2008). Critical COMs of Success in Large-Scale Construction Projects: Evidence from Thailand constructuction industry. International Journal of Project management, 26(4), 420-430.

Toor, S. R. and Ogunlana, S. O. (2009).Beyound the “Iron Triangle”: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. International Journal of Project management, doi: 10.1016/j.ijproman.2009.05.005.

Toor, R. and Ogunlana, S. (2009). Construction Innovation: Information, process, management. 9(2), PP. 149-167.

Turner, J. R. (1993). The Handbook of project-Based Management: Improving the process for achieving strategic objective. London, McGraw-Hill.

Wright, J., N. (1997). Time and Budget: The twin imperatives of a project Sponsor. International Journal of Project Management, 15(3), 181-186.

5 of the World’s Most Spectacular Megaprojects

The Three Gorges Dam Project

We seem to be entering a new age of megaprojects as countries around the world mobilise the private sector to invest heavily in multi-billion or sometimes multi-trillion dollar infrastructure initiatives.

Megaprojects (sometimes also spelled “mega projects”) are very large investment projects and  require care in the project development process to reduce any possible optimism bias and strategic misrepresentation.

The most expensive large-scale megaprojects in the world range from  bridges, tunnels, highways, railways, airports, seaports, power plants, dams  and  wastewater projects to entire city districts.

Megaprojects seem to be practically recession-proof and have continued despite the 2008 global economic slowdown likely spurred megaproject construction, since the governments of some countries among them China, India, and the United States saw investment in infrastructure as a way to stimulate growth.  Moreover, many large corporations are locked into megaprojects, because only enormous  undertakings seem capable of nudging their bottom lines.

Here, we take a look at 5  of the biggest, most important and spectacular megaprojects  around the world.

Waterworld Hotel Concept, Songjiang, China By Atkin’s Architecture Group
Waterworld Hotel Concept, Songjiang, China By Atkin’s Architecture Group

Waterworld Hotel, Songjiang, China
Waterworld Hotel, Songjiang, China

Waterworld Hotel, Songjiang, China
Waterworld Hotel, Songjiang, China

Waterworld Hotel Concept, Songjiang, China By Atkin’s Architecture Group
Waterworld Hotel Concept, Songjiang, China By Atkin’s Architecture Group

Songjiang Hotel, China

“We Drew Our Inspiration from the Quarry Setting” Says Atkins Design Studio

The five-star hotel is designed by UK architecture office Atkins for Shimao Group and will offer around 400 rooms, with underwater restaurants, clubs, shopping facilities, a 10-meter deep aquarium and various sport activities such as rock climbing and bungee jumping.

The waterfall is  a key feature of this hotel built into a 328-foot-tall quarry outside of Shanghai. The  19-story hotel will have the waterfall cascading down the middle and two hotel floors that are entirely underwater.

The building will get its energy from geothermal sources and will feature a green roof.

With its 650 architects spread around the world in 60 offices, Atkins Design Studio  is an  enormous organisation, with some  pretty amazing Megaprojects under its belt.

The Three Gorges Dam Project
The Three Gorges Dam Project

The Three Gorges Dam Project
The Three Gorges Dam Project

The Three Gorges Dam Project
The Three Gorges Dam Project

The Three Gorges Dam Project
The Three Gorges Dam Project

Three Gorges Dam

Man has long used technology to harness nature and dam building has always been one of the most controversial methods.

Building a dam causes dramatic effects on the environment, yet can benefit man in innumerable ways.

Three Gorges Dam located in  Sandouping, Yiling, Hubeiis is the largest power station in the world and took  14 years to complete at a cost of  USD $37 billion ( ¥180 billion). The original estimated cost  was  USD $6 billion ( ¥20 billion).  It can produce as much as 15 nuclear power plants and is expected to  create 10% of China’s entire energy supply.

The Three Gorges Dam has moved 39 trillion kilograms of water 175 metres above sea level  which  scientists believe has altered the planet enough to change the speed at which the earth rotates.

The dam was first suggested by Sun Yat-sen, the first president of the Republic of China in 1919 and people have been working on it, researching how it would work and where exactly it would go for nearly 100 years.

London Crossrail
London Crossrail

London Crossrail

Crossrail is Europe’s largest infrastructure project and is set to  boost London’s rail capacity by 10%. The project will deliver approximately 11.9km of twin bore tunnels.

The  $23 billion development 73-mile rail project will connect London from East to West, improving access to Heathrow Airport, central London as well as city’s surrounding towns and suburbs.

Eight boring machines have been cutting their way through earth to create 26 miles (42km) of tunnels.

Construction of Crossrail began at Canary Wharf in London Docklands on 15 May 2009, with tunnelling work starting in May 2012.

The Crossrail project is about 65% complete and engineers will now continue upgrading existing stations and building new stations in central London and London Docklands.

Working in partnership with China Southwest Architectural Design and Research Institute and the China Railway Design Institute, ADPI also won the competition to design and develop Terminal 3 at Chongqing Jiangbei International Airport in 2011. Phase 1 of the project will increase the airport’s capacity to 45 million passengers per year by 2020.
Working in partnership with China Southwest Architectural Design and Research Institute and the China Railway Design Institute, ADPI also won the competition to design and develop Terminal 3 at Chongqing Jiangbei International Airport in 2011. Phase 1 of the project will increase the airport’s capacity to 45 million passengers per year by 2020.

Working in partnership with China Southwest Architectural Design and Research Institute and the China Railway Design Institute, ADPI also won the competition to design and develop Terminal 3 at Chongqing Jiangbei International Airport in 2011. Phase 1 of the project will increase the airport’s capacity to 45 million passengers per year by 2020.
Beijing’s new international airport

Working in partnership with China Southwest Architectural Design and Research Institute and the China Railway Design Institute, ADPI also won the competition to design and develop Terminal 3 at Chongqing Jiangbei International Airport in 2011. Phase 1 of the project will increase the airport’s capacity to 45 million passengers per year by 2020.
Beijing’s new international airport

Beijing International Airport Terminal 1 to be World’s Biggest

Beijing’s new international airport

January 2013 saw work approved for a new airport in Beijing. With large sweeping, non-conforming arches that span inwards with curves to the interior, there is a definite stamp of Zaha Hadid Architects with their design language.

Playing host to eight runways and with the capabilities to cater for 130 million passengers every year, Beijing’s new international airport will be among the world’s largest and busiest once  complete  in 2017.

International Space Station (ISS)
International Space Station (ISS)

One Giant Leap for Mankind

International Space station

The International Space Station (ISS) is the largest artificial body in orbit and can often be seen with the naked eye from Earth.

It may be one of the most ambitious scientific ventures ever and also the  largest masterpiece of the human engineering in orbit around Earth at present.  The station consists mainly of habitable and science modules, external trusses and solar panels to provide power.

The ISS provides a platform to conduct scientific research including  astrobiology, astronomy, human research including space medicine and life sciences, physical sciences,  materials science, space weather and weather on Earth.

What exciting projects did we miss on our list? Let us know in the comments section below.

29 Awesome Quotes on Risk Management

29 Awesome Quotes on Risk Management
  1. If you treat risk management as a part-time job, you might soon find yourself looking for one ’- Deloitte white paper (Putting Risk in the Comfort Zone)
  2. I have learned that nothing is certain except for the need to have strong risk management, a lot of cash, the willingness to invest even when the future is unclear, and great people ’- Jeffrey R. Immelt
  3. Thoughtfully assessing and addressing enterprise risk and placing a high value on corporate transparency can protect the one thing we cannot afford to lose trust ’- Dale E. Jones, vice chairman and partner with Heidrick & Struggles
  4. We have no future because our present is to volatile. Will only have risk management ’- William Gibson
  5. Risk management is a culture, not a cult. It only works if everyone lives it, not if its practiced by a few high priests ’- Tom Wilson
  6. I think the rise of quantitative econometrics and a highly mathematical approach to risk management was the obverse of a decline in interest in financial history ’- Niall Ferguson
  7. There is no doubt that Formula 1 has the best risk management of any sport and any industry in the world ’- Jackie Stewart
  8. Stronger regulation and supervision aimed at problems with underwriting practices and lenders’ risk management would have been a more effective and surgical approach to constraining the housing bubble than a general increase in interest rates ’- Ben Bernanke
  9. If you don’t invest in risk management, it doesnt matter what business you’re in, it’s a risky business ’- Goldman Sachs president Gary Cohn
  10. Adventure without risk is Disneyland ’- Douglas Coupland
  11. Risk and time are opposite sides of the same coin, for if there were no tomorrow there would be no risk. Time transforms risk, and the nature of risk is shaped by the time horizon: the future is the playing field ’- Peter Bernstein, Against the Gods
  12. As population susceptibilities are better understood, we will be in a better position than we are in today to make informed decisions about risk management ’- Samuel Wilson
  13. Take calculated risks. That is quite different from being rash ’- General George Patton
  14. All courses of action are risky, so prudence is not in avoiding danger, but calculating risk and acting decisively ’- Niccolo Machiavelli
  15. Total enterprise risk management is critical, but implementing it is both expensive and easier said than done. Even the most sophisticated financial institutions are still basically silo risk managers ’- Danny Klinefelter, Professor and Extension Economist with Texas AgriLife Extension, Texas A&M University
  16. Playing it safe is the riskiest choice we can ever make ’- Sarah Ban
  17. The question of whether or to what extent human activities are causing global warming is not a matter of ideology, let alone of belief. The issue is simply one of risk management ’- Malcolm Turnbull
  18. Business people need to understand the psychology of risk more than the mathematics of risk  ’- Paul Gibbons,
  19. Risk comes from not knowing what your doing ’-Warren Buffett
  20. You have to take risks. You will only understand the miracle of life fully when we allow the unexpected to happen ’- Paulo Coelho
  21. Risk is a function of how poorly a strategy will perform if the ‘wrong’ scenario occurs ’- Michael Porter, Competitive Advantage
  22. Risk management should be an enterprisewide exercise and engrained in the business culture of the organisation ’- OSFI Superintendent Julie Dickson, June 1, 2011 (courtesy Ethidex)
  23. Risk is our business ’- Oswald Grübel, CEO at UBS
  24. When our leaders accept the status quo, we run the risk of disaster ’- Max Bazerman from “Predictable Surprises”
  25. The concept of ‘inherent risk’ is impossible to measure or even define. The idea of looking at risk absent all hard controls, soft controls, or mitigations, provides little or no useful information in most cases ’- Todd Perkins (from Journal of Applied Corporate Finance – volume 19 number 4)
  26. It’s important to take risks but it’s idiotic to take them blindly ’- Terry Levine
  27. Fail to identify the strategic risks and you fail as a business, no matter how well you manage your operational and project risks ’- Keith Baxter
  28. Business as usual is business at risk ’- Deloitte white paper
  29. Risk management is the identification, assessment, and prioritisation of risks ’- Wikipedia

 

As seen on