Bridge House, Croydon, Is Prefab Really Prefabulous?

Prefabricated homes have been available for years and date back at least a century. The Sears Roebuck index made and offered prefab homes to the public as early as 1908, and Prefab was later explored by famous twentieth-century architects, such as, Walter Gropius, Le Corbusier, Marcel Breuer, Frank Lloyd Wright, who saw the method as a likely solution to the dilemma of housing in modern society.   Interest in Prefab grew in the first half of the twentieth-century, with the outburst of manufacturing expertise and the creation of the assembly line.

Historically the mention of prefabricated houses invokes memories of housing built to cover in the temporary a deficiency of housing in the UK following the World Wars.

The Government promised ‘homes fit for heroes’, however, negative public attitudes surfaced towards prefabricated housing because of substandard building materials used and poor workmanship.

A staggering 1 million of these homes were built during the 20th century and more than half a century on, many are still standing despite no foundations.   A few are listed while others have been demolished.

Today people remember the shabby mobile classrooms as in, bitter cold in winter and like an oven in summer.   Therefore, memories have rendered the concept of prefabricated houses an unattractive idea.   Talk about the term prefabricated housing to an architect, and their eyes will beam with visions of fascinating contemporary homes.   However, talk to the ordinary person on the street and people immediately think that we are going down the same path, a pretty hard image to shake off.   The very factors that are presented as positive advantages of prefabricated homes became liabilities in the eyes of homeowners who wanted a durable appreciating asset.

Prefab

An example can be found by looking at the prefabricated houses on Catford estate built by German and Italian prisoners of war in 1946.

Catford prefab estate. Robin Bell: 2008
Catford prefab estate. Robin Bell: 2008

‘They were not built to last and need regular maintenance.   They are just large sheds really and taking up a lot of space.   They should really be demolished.’   (Drake 2008)

Over the ten years, Lewisham Council has tried to develop the site many times and a review    found none of the dwellings met Decent Homes Standard.

So why do more and more developers  choose prefabricated construction?

First and foremost – Speed. “It may  take a bit longer in terms of design,  preparation and planning but site based  activities are taking up to 30%  less time and allowing homes to  reach the market sooner. Other  reasons cited include, in order of  preference:

  • Design Quality
  • Cost
  • Previous Experience
  • Funding

Source: Design and Modern Methods of  Construction. The Housing Corporation  and CABE 2004″

Bridge House (Example)

Croydon Vision 2020  is a regeneration programme by the  London Borough of Croydon  for the centre of  Croydon  in  South London.  The Old Town Masterplan focused on the area between the High Street and Roman Way, one of the oldest areas of Croydon.

Formerly the site of a telephone exchange, Bridge House is  a £20 million  development that has provided 27 private  and 48 affordable apartments, above  ground and mezzanine retail spaces.

The block wraps around an existing  multi-storey car park and offers the  opportunity for cafs and shops to  open onto the new square. A mix of  green and brown roofs, to support  biodiversity, form part of a series of  environmental measures and the  scheme is to be of modular  construction.

The Croydon  chose the modular  approach principally because of the  speed of construction offered. The  project began on site in the spring  of 2006 and the  75 flats were  stated to have been erected in  approximately 26 days, vastly  outperforming the time taken by  traditional construction.

Client: Howard Holdings plc

Architect: AWW

Structures: Walsh Associates

Principal Supplier: MC First

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Construction Begins on Sip Sports Center in Suzhou

Images: von Gerkan, Marg and Partners (GMP)

Construction of the SIP Sports Centre has started in the Chinese city of Suzhou. The sports centre in Suzhou Industrial Park  was  designed by Ham burg’s star architects von Gerkan, Marg and Partner, and has been scheduled for completion in 2017.

The sports venue will be surrounded by residential quarters, a hotel and a leisure district offering community sports facilities and public spaces.

The development is being funded jointly by Sizhou City and Jiangsu Regional authorities and when complete, the complex will form part of the larger Suzhou Industrial Park.

Image: von Gerkan, Marg and Partners (GMP)
Image: von Gerkan, Marg and Partners (GMP)
Image: von Gerkan, Marg and Partners (GMP)
Image: von Gerkan, Marg and Partners (GMP)

Hamburg Architects Designs for China’s Garden City

A spokesperson for architects von Gerkan, Marg and Partners said: “Suzhou is famous in China for its landscape design, and the masterplan for this new sports park is based on this tradition and reputation.  In a modern interpretation of the city’s traditional gardens, an informally designed park landscape flows around the podiums that rise in straight lines from the surrounding streets and support the stadiums.”

The beautiful conspicuous undulating roofs that on all three stadiums make the ensemble into a landmark visible from afar. As visitors walk along the curved pathways, various viewpoints  open up to pavilion architecture, stunning water features, and a breathtaking  landscape. Its curved silhouette stands out from the urban environment, blending harmoniously with the landscape and the park at the Xietang River.  In addition, the succinct character of the stadiums  is reinforced by a uniform façade design.  The façades of both stadiums  and the podiums are structured by horizontal lines, which follow the shape of the buildings in elegant curves.

The roof of the covered 15,000 capacity multi-purpose hall located to the north-east of the site is supported by v-shaped columns which provide a rhythm to the transparent glass façade of the hall.

The Heart of the Community

The multi-functional sports centre will include three national-standard venues includes a 45,000-seat stadium, an indoor pool with 3,000 seats and a 15,000-seat indoor arena.  With its wide range of functions, the park has been designed to ensure a permanent and sustainable flow of visitors.

The facility is well connected to the Metro and offers the Suzhou residents  not only a park, but also various shops for day-to-day needs, thus creating an attractive centre for the new part of the city.

 

As seen on