Poem: The Unravelling of a Christian Marriage

Marry the wrong person, everyday is Martyrs Day.
Marry a lazy person, everyday is Labour Day.
Marry a rich person everyday is New Year’s Day.
Marry an immature person, everyday would seem like Children’s Day.
Marry a cheater or liar, everyday will become April Fool’s Day.
And if you don’t get married, everyday is Independence Day!

Marriage is the only school where you get a certificate before you start.
It’s also a school where you will never graduate.
It’s a school without a break or a free period.
It’s a school where no one is allowed to drop out.
It’s a school you will have to attend everyday of your life.
It’s a school where there is no sick leave or holidays.
It’s a school founded by God on the foundation of love.
The walls are made out of trust.
The door made out of acceptance.
The windows made out of understanding
The furniture made out of blessings
The roof made out of faith.

Be reminded that God is the only Principal and you are a student,
Even in times of storms, don’t be unwise and run outside.
Keep in mind that, this school is the safest place to be.
Never go to sleep before completing your assignments for the day.
Never forget  to communicate with your classmate and with the Principal.
If you find out something about your classmate (spouse) that you do not appreciate.
Remember your classmate is also just a student, not a graduate.
God is not finished with him/her yet.
So take it as a challenge and work on it together.
Do not forget to study the Holy Book (the main textbook of this school).
Start each day with a sacred assembly and end it the same way.

Sometimes you will feel like not attending classes, yet you have to.
When tempted to quit find courage and continue.
Some tests and exams may be tough but remember,
the Principal knows how much you can bear and yet it’s a school better than any other.

It’s one of the best schools on earth;
joy, peace and happiness accompany each lesson of the day.

Different subjects are offered in this school, yet love is the major subject.
After all the years of theorising about it, now you have a chance to practice it.

To be loved is a good thing, but to love is the greatest privilege of them all.
Marriage is a place of love, so love your spouse.

Whether you’re married, engaged, or still single, we hope that you have found wisdom and encouragement in this poem about marriage.  

Does ‘The Image of God’ Extend to Robots, Too?

Inside a railway arch in Brixton, a piece of history was brought back to life. First built in 1928 by Captain Richards & A.H. Reffell, Eric is one of the UK’s first robots.  Eric’s design was relatively simple. He was automated, but the interesting thing about Eric  is how much extra stuff people  read into him.  Ingenious electrical instruments enabled Eric to hear questions and answer in a human voice.

On September 28 1928 Eric stood up at the Royal Horticultural Hall, bowed, looked right and left and moved his hands as he proceeded to give an opening address as sparks flashed from his teeth.

The New York Press described Eric  as the “perfect man,“ built less than a decade after the word robot was used for the first time, Eric toured  the world with his makers but then vanished, seemingly forever.

Nobody knows if the robot was thrown out, or lost, but it’s apparent that Eric once lauded for his  technical prowess became an early victim of technological obsolescence. He may  have  no longer been needed or wanted even though he may have  still been in working order.

In May 2016, over 800 Kickstarters  investors campaigned to bring Eric back to life. Roboticist and artist Giles Walker created a replica of Eric using just a handful of archived news cuttings, pictures, and video.  The robot is built with the same finesse as modern robots but purposefully lacks their capabilities.  Eric is controlled by a pre-programmed sequence, using software similar to that used for controlling lights in theatres.

By resurrecting Eric, Russell and Walker want to make people reevaluate the place of robots within our history and society at large.

Commissioned by the Science Museum and funded through a successful £51,000 Kickstarter campaign, Eric is on display at the South Kensington museum ahead of a Robots exhibition in 2017 and will thereafter tour the world just like he did more than 90 years ago.

The new exhibition will feature more than 100 robots, from a 16th-century mechanical monk to robots from science fiction and modern-day research labs.

In whose image are robots made?

According  to Russell, Curator, London Science Museum the answer seems to be “ourselves.”

Robots are almost like mirrors, they reflect back on ourselves, tell us who we are  Ben Russell, Curator, London Science Museum

As research into artificial intelligence continues, we will continue on the path of making artificial intelligence (AI) in our image. But can Christian thought provide an alternative approach to how robots are made?

The original Eric is a product of a time when an intelligent robot was still a far-off possibility. At the time, filmmakers and audiences treated these robots instrumentally; there was little sympathy for the robot dead.

Times, however, have changed. Christopher Orr, writing in The Atlantic, notes that there is a major philosophical shift in the newest version of Westworld: A shift from concern for the creators, made of flesh and blood, to concern for the created, made of steel and silicon.

9 Inspirational Sayings from Dr. Benjamin Carson

Find out the mindset that transformed Ben Carson’s life, from a poor performing student to one of the greatest neurosurgeon in the world. Allow these quotes to inspire you to think bigger.

Read and be blessed.

  1. Sometimes you are unsatisfied with your life, while many people in this world are dreaming of living your life.
  2. A child on a farm sees a plane fly overhead and dreams of flying. But, a pilot on the plane sees the farmhouse and dreams of returning home. That’s life, enjoy yours.
  3. If wealth is the secret to happiness, then the rich should be dancing on the streets. But only poor kids do that.
  4. If power ensures security, then officials should walk unguarded. But those who live simply, sleep soundly.
  5. If beauty and fame bring ideal relationships, then celebrities should have the best marriages. But those who live simply, walk humbly and love genuinely!
  6. All good will come back to you!
  7. Man asks, “Where was God when Myles Munroe, wife and his associates were killed in a crash? He answers, “The same place I sat when John the Baptist my servant was beheaded. When Stephen my servant was stoned to death. When Paul my servant was murdered in Rome. The same place I sat when my only Son was brutally crucified, wounded, bruised and killed. I have not moved from my position.”
  8. I am the same. It is not the means of exit from earth that matters but the destination. Live simply. It’s all about God!
  9. If someone asks about your educational background, proclaim boldly that: Church is my college. Heaven is my university. Father God is my counselor. Jesus is my principal. The Holy Spirit is my teacher. Angels are my classmates. The Bible is my textbook. Temptations are my exams and overcoming Satan is my hobby. Winning souls for God is my assignment. Receiving eternity is my degree. Praise and Worship are my slogan.

Benjamin Solomon Carson Sr.  (born September 18, 1951) is an American neurosurgeon, author, and politician who is the 17th and current  United States Secretary of Housing and Urban Development, under the  Trump Administration. Prior to his cabinet position, he was a candidate for  President of the United States in the  Republican primaries in 2016.  Born in  Detroit,  Michigan, and a graduate of  Yale University  and the  University of Michigan Medical School, Carson has authored numerous books on his medical career and political stances. He was the subject of a  television drama film  in 2009.  He was the Director of Pediatric Neurosurgery at  Johns Hopkins Hospital  in  Maryland  from 1984 until his retirement in 2013. As a pioneer in neurosurgery, Carson’s achievements include performing the only successful separation of  conjoined twins  joined at the back of the head, pioneering the first successful neurosurgical procedure on a fetus inside the womb, performing the first completely successful separation of type-2 vertical  craniopagus twins, developing new methods to treat brain-stem tumors, and reviving  hemispherectomy  techniques for controlling  seizures.  He became the youngest chief of pediatric neurosurgery in the country at age 33.  He has received more than 60 honorary doctorate degrees, dozens of national merit citations, and written over 100 neurosurgical publications.  In 2008, he was bestowed the  Presidential Medal of Freedom, the highest civilian award in the United States.

Politics and Project Management, a Lesson in Leadership

We all know that the more power you have, the better you are able to get the job completed. The problem is most project managers have lots of responsibility, but hardly any authority and since most projects exist outside core business structures, they are forced to develop other methods of influence.

One unspoken evil that is often ignored on project management training courses is the politics of project management. While most of us view politics with disgust; there is no refuting that effective project managers are often seen as those who are equipped and able to employ fitting political strategies to further their project goals. 

“In a Perfect World the Best Workers Would Be Promoted on Merit Alone and the Best Ideas Would Be Adopted Regardless of Personal Interest – but We Do Not Live in Utopia”

Have you ever included ‘office politics’ as a risk on your risk register? Probably not. Though, consider the potential implications of ignoring the ugly stepchild of project management?

“The Objective of Office Politics Is to Manipulate a Situation in Order to Achieve an Outcome That Will Benefit One Individual or Group at the Expense of Other Individuals or Groups.”

While it is unlikely that ‘office politics’ would be listed directly as a risk on your risk register, it is quite likely that one or more of the outcomes of it would. As a result, if you want to survive and prosper in the real world you need to combine good work with smart politics to ensure your own success and that of your projects. The biggest mistake a project manager can make is to assume that politics in project management doesn’t exist. After all, politics is human nature and has played an integral part in history since the dawn of civilization.

In a group where working interactions are fraught with tension and individuals have their own personal agendas or want to be “top dog” personal conflicts will often get in the way of the project aims. Issues between members of the team become the over-riding concern both for the individuals afraid and sometimes even the project manager. Meetings can consist of jostling for power or simply trying to justify your position and when that happens progress on the project will undoubtedly suffer.

For most project managers, playing politics is a form of slow, soul-destroying torture where logic, self-control, transparency and trustworthiness are replaced by deception, concealment, and sabotage. However, ignoring the external and internal politics surrounding your project or organization is dangerous. Successful project managers need to understand organizational politics and how to make them work for project success.

In the case of project politics you can use these key techniques in a constructive manner:

Carefully Manage Your Own Conduct

  1. The first rule is to at all times act in a way that commands respect and beyond that, respect others. That means not gossiping, spreading rumors or getting sucked into interpersonal conflicts and arguments. Maintain your honesty!
  2. Be positive as a positive outlook is a choice that you can always make and remain professional. 
  3. Be confident and firm but not hostile and make sure you take organizational perspectives, not a personal one when voicing objections or giving criticism.
  4. Always assume things will be disclosed, so don’t rely on confidentiality.
  5. Over time you will learn what works in your organization’s culture and what doesn’t. Try to watch other people and identify successful behaviors that you can model to navigate the political minefield.

Review the Organization Chart

  1. Sit back and watch for a while. Identify the real influencers, those who are respected, champions, those who have authority but don’t use it, the mentors and last but not least the true brains behind the organization. Then re-map the organization chart in terms of political influence as politics will often bypass the formal organization chart.

Understand the Social Network

  1. Once you know who’s who in the organization, you have to understand the social networks. This involves identifying who gets along with whom, groups or cliques that have formed and ongoing interpersonal conflicts. Over time you will learn who has the most trouble getting along with others and the basis for the interrelationship whether it be friendship, respect or manipulation, including how the influence flows between all parties.

Build Good Relationships

  1. Now you need to build multiple networks but avoid aligning yourself with one group or another this way you can keep your finger on the pulse of the organization.
  2. Don’t be afraid of politically powerful people and instead, develop relationships that cross the formal hierarchy in all directions.
  3. Build your relationships on trust and respect and avoid empty flattery.

Use Your Social Network

  1. You will need to learn to use your social network to stay clear of negative politics. You can do this through positive political action.
  2. Use your network to gain access to information, build visibility of your achievements and improve difficult relationships.
  3. Attract opportunities where you can shine and seek out ways to make yourself, your team and your boss look good.

Counteract Negative Play

“The Expression, Keep Your Friends Close and Your Enemies Closer” Couldn’t Be Any Truer When It Comes to Office Politics.”

  1. Your mapping of the organization will help you to identify those people who use others for their own political purposes, and not for the common good. Know that these people typically have low self-worth (that’s why they rely on destructive politicking to get ahead). Always be very careful what you say to them.  Understand what motivates them, their goals, and how to avoid or counter the impact of their politics
  2. Remember loyalty is not a reliable factor in the workplace!

“It is easy to become a target if you’re ambitious or if you strive for change. One of the biggest mistakes we make in our career is to assume that everyone likes progress. This is not true’Å —’Å many are content with the status quo and will defend it with their life.”

Projects are rarely easy and office politics can compound other sorts of problems that arise so they need to be dealt with swiftly and firmly. 

If You Want to Make Enemies, Try to Change Something: 17 Inspiring Change Quotes to Live By

"God supplies everything you need for successful change, and when you make changes with his help, it says changed." - Unknown
If you want to make enemies, try to change something.  Change, no matter what scale it is on, can be a source of stress and anxiety for many. However, it’s common for change management practitioners to view resistance to change as an irrational barrier to progress. Another school of thought is that resistance to change is a social process that can strengthen changes and help to eliminate undesirable change.
The fact remains that change is necessary in all organizations. But, it is the way change is initiated which can so greatly vary. It can be forced upon companies by outside forces or just come from a realization that the company may be falling behind the times. In this way, change management might be quite beneficial to an organization. Organizations that have learned how to transform themselves through effective leadership and strategic control are more likely to survive and prosper. The dilemma is that most people hate change and love it at the same time and what they really want is for things to remain the same but get better.
The good news is that God has a plan for your life to prosper.    If we trust in God and allow the change to grow us to become more like Jesus Christ in how we respond and act, then we are promised that all things will work together for good for those who love Him and keep His commandments!
The following thought-provoking quotes relate to change management including resistance to change, acceptance and change strategy.
  1. “One of the reasons so many celebrities keep going in and out of rehab is that they leave out the critical element to lasting change: God.” – Unknown
  2. “There is nothing more difficult to take in hand, more perilous to conduct, or more uncertain in its success than to take the lead in the introduction of a new order of things.” — Niccolo Machiavelli
  3. “Change has its enemies.” — Robert Kennedy
  4. “He who rejects change is the architect of decay.” — Harold Wilson
  5. “Change is not made without inconvenience, even from worse to better.” — Samuel Johnson
  6. “The world hates change, yet it is the only thing that has brought progress.” — Charles Kettering
  7. “God supplies everything you need for successful change, and when you make changes with his help, it says changed.” – Unknown
  8. “It is always easier to talk about change than to make it.” — Alvin Toffler
  9. “It must be considered that there is nothing more difficult to carry out nor more doubtful of success nor more dangerous to handle than to initiate a new order of things.” — Machiavelli
  10. “The path of least resistance is the path of the loser.” — H. G. Wells
  11. “When you feel weak in the face of change, God is omnipotent, or all-powerful. “If God is for us, who can be against us?” the Bible says. (Romans 8:31, NIV) Knowing the invincible God is on your side gives you tremendous confidence.” – Unknown
  12. “Paralyze resistance with persistence.” — Woody Hayes
  13. “Culture does not change because we desire to change it. Culture changes when the organization is transformed – the culture reflects the realities of people working together every day.” — Frances Hesselbein
  14. “The greatest danger in times of turbulence is not the turbulence – it is to act with yesterday’s logic – Peter Drucker
  15. “The rate of change is not going to slow down anytime soon. If anything, competition in most industries will probably speed up even more in the next few decades.” — John P. Kotter
  16. “Your success in life isn’t based on your ability to simply change. It is based on your ability to change faster than your competition, customers, and business.” — Mark Sanborn
  17. “If you want to make enemies, try to change something.” — Woodrow Wilson

Don’t make change harder than it has to be. Do it the right way. Ask God for help.

How Technology Has Changed Procurement in the Last 10 Years

How technology has changed procurement in the last 10 years

Over the past decade business procurement has experienced rapid technological upheaval that, in the main, has made life easier for everyone involved.

The first ever Global Procurement Technology Summit was held in March 2016. It shows the emphasis procurement is now putting on understanding and utilising new technologies, and that it’s clearly a huge talking point for professionals across the world.

Looking in greater detail: which technology has been responsible and what has the effect been on procurement and buying professionals?

1. More informed decisions are being made

The digitalisation of procurement processes and integration of data-sharing across buyer behaviour, ratings and history of purchases over extended periods of time, has made for smarter and more informed decisions.

Despite the greater insight into decision-making, a study of US procurement professionals still revealed accurate forecasting to be the biggest challenge, something that’s possibly down to the rise in budget responsibilities over the last ten years.

The Coupa ‘Top 5: Constants and Change in Cloud Procurement’ report revealed that in 2003, budgets were reported as an average of $31m, compared to $100m in 2013.

2. Response times have drastically reduced

Procurement solutions are now quicker and easier than ever thanks to new marketplace technologies.

Buyers can take advantage of online purchasing possibilities, using websites like Amazon to source, purchase and arrange delivery of items.

The speed of procurement reflects the new speed in which consumerism moves ’’ the integration of digital mediums with online shopping has made the process of deliberation through to transaction much easier, a trend which has been reflected in the world of procurement.

3. Integration has brought its own problems

Technological integration has created many positives for procurement, but it’s also created challenges.

Millennials will make up 40% of the workforce by 2020, which is great for improving current procurement solutions as younger generations have higher expectations for technology and are early adapters.

However, the average age of procurement professionals in the UK is currently 44 – much older than the next generation of workers, who fully understand the capabilities of technology, and who will be easier to train and able to work with increased speed and accuracy.

The gap will close in the coming years, but procurement faces a struggle as older workers need to ensure their skills are relevant to the changing world around them.

Additionally, Hays’ ‘Procurement Salary Guide’ revealed that demand for procurement professionals has increased at all levels within the public sector, pushing salaries up. This demand is the result of a squeeze on public finances and attempts to cut costs following the slowdown in the economy.

4, Technology and the future of procurement

To conclude, technology is clearly a powerful enabler that’s here to stay. Plenty of companies are now seeing the importance of procurement technology as a means to improve their bottom lines, which was reflected in the inaugural Global Procurement Technology Summit earlier this year.

Integration of contract management, risk management and supplier lifecycle systems through investment in improved systems with added capabilities, has ensured more accurate sourcing is possible and due to the skills involved in running these systems, has driven salaries up.

Sophia Chapman is a guest contributor from Portfolio Procurement, expert recruiters in the compensation, benefit and reward sector.

Has Nigeria Become the World’s Junk Yard of Abandoned and Failed Mega Projects worth Billions?

Dim1, N. U., Okorocha2, K. A., & Okoduwa3 V. O.

The Nigerian construction industry is mostly concerned with the development and provision of projects such as roads, bridges, railways, residential  and commercial real estates, and the  maintenance necessary for the socio-economic developments contributes immensely to the Nigerian economic growth (Bureau of Statistics, 2015). Butcher and demmers (2003) described projects as an idea which begins and ends by filling a need. However, a project fails when its idea ends without meeting the needs and expectations of its stakeholders.

Nigeria Has Become the World’s Junk – Yard of Abandoned and Failed Projects worth Billions of Naira!

Hanachor (2013), revealed that projects form part of the basis for assessing a country’s development. However,  a damming  report from the Abandoned Projects Audit Commission which was set up by the Ex-President Goodluck Jonathan in 2011 revealed that 11,886 federal government projects were abandoned in the past 40 years across Nigerian  (Abimbola, 2012). This confirmed the assertion by Osemenan (1987) “that Nigeria has become the world’s junk –yard of abandoned and failed projects worth billions of naira”.

Abandoned projects including building and other civil engineering infrastructure development projects now litter  the  whole of Nigeria.

Physical projects do not only provide the means of making life more meaningful for members of the community where the projects are located, successful  projects also  result in  empowerment and collective action towards self improvement (Hanachor, 2013).  

This Issue of Abandonment Has Been Left Without Adequate Attention for Too Long, and Is Now Having a Multiplier Effect on the Construction Industry in Particular and the Nigeria’s National Economy as a Whole. (Kotngora, 1993)

PROJECT FAILURE

Project Failure might mean a different thing to different stakeholders. A project that seemed successful to one stakeholder may be a total failure to another (Toor and Ogunlana, 2008). Some stakeholders, more especially the project users and some private owners, think of failed projects as a situation where a completed building project collapsed, a situation where by a completed dam project stopped working after few days of completion, or a completed road project that broke down after few months of completion. Other experienced stakeholders, such as engineers  and  architects  conform to the iron triangle by Atkinson (1999) which states that the most strategically important measures of project failure are “time overrun”, “cost overrun”, and “poor quality”.

Turner (1993) noted that a project fails when the project specifications are not delivered within budget and on time;   the project fails to achieve its stated business purpose; the project did not meet the pre-stated objectives; the project fails to satisfy the needs of the project team and supporters; and the project fails to satisfy the need of the users and other stakeholders. Lim and Mohamed (1999) cited in Toor and Ogunlana (2009) clarified that there are two possible view points to project failure namely; the macro-level and the micro-level. They further explained that the macro view point reviews  if the original objectives and concepts of the project was met. Usually the end users and the project beneficiaries are the ones looking at the project failure from the macro view point, where as the project design team, the consultants, contractors, and suppliers review projects from a micro view point focusing on  time of delivery, budget, and poor quality.  

In the early 1990s, the failure as well as the success of any project was determined by the project duration, monetary cost, and the performance of the project (Idrus, Sodangi, and Husin, 2011). Belout and Gauvrean (2004), also confirmed that the project management triangle based on schedule, cost, and technical performance is the most useful in determining the failure of a project. Moreover, a project is considered as an achievement of specific objectives, which involves series of activities and tasks which consume resources, are completed within specifications, and have a definite start and end time (Muns and Bjeirmi 1996, cited in Toor and Ogunlana, 2009). Reiss (1993) in his suggestion stated that a project is a human activity that achieves a clear objective against a time scale. Wright (1997) taking the view of clients, suggested that time and budget are the only two important parameters of a project which determines if a project is successful or failed. Nevertheless, many other writers such as Turner, Morris and Hough, wateridge, dewit, McCoy, Pinto and Slevin, saarinen and Ballantine all cited in Atkinson (1999), agreed that cost, time, and quality are all success as well as failure criteria of a project, and are not to be used   exclusively.

FACTORS OF PROJECT FAILURE

Cookie-Davies (2002) stated the difference between the success criteria and the failure factors. He   stated that failure factors are those which contributed towards the failure of a project while success criteria are the measures by which the failure of a project will be judged. The factors constituting the failure criteria are commonly referred to as the key performance indicators (KPIs).  

Time   and Cost Overrun

The time factor of project failure cannot be discussed without mentioning cost. This is because the time spent on construction projects has a cost attached to it. Al-Khali and Al-Ghafly, (1999); Aibinu and Jagboro, (2002) confirmed that time overrun in construction projects do not only result in cost overrun and poor quality but also result in greater disputes, abandonment and protracted litigation by the project parties. Therefore, focus on reducing the Time overrun helps to reduce resource spent on heavy litigation processes in the construction industry (Phua and Rowlinson, 2003). Most times, the time overrun of a project does not allow resultant system and benefits of the project to be taking into consideration (Atkinson, 1999). Once a project exceeds the contract time, it does not matter anymore if the project was finally abandoned or completed at the same cost and quality specified on the original contract document, the project has failed. Furthermore, Assaf and Al-Hejji, (2006) noted that time overrun means loss of owner’s revenue due to unavailability of the commercial facilities on time, and contractors may also suffers from higher over heads, material and labour costs.

Poor quality/Technical Performance

The word “Performance” has a different meaning which depends on the context it is being used and it  can also be referred to as quality. Performance can be generally defined as effectiveness (doing the right thing), and efficiency (doing it right) (Idrus and Sodangi, 2010). Based on this definition of performance, at the project level, it simply means that a completed project  meets fulfilled the stakeholder  requirements in the business case.

CAUSES OF PROJECT FAILURE

A lot of research studies have investigated the reasons for project failures, and why projects continue to be described as failing despite improved  management. Odeh and Baltaineh, 2002; Arain and   Law, 2003; Abdul-Rahman et al., 2006; Sambasivan and Soon, 2007; all cited in Toor and Ogunlana, 2008, pointed out the major causes of project failures as Inadequate procurement method; poor funding and availability of resources; descripancies between design and construction; lack of project management practices; and communication lapses

The contract/procurement method

A result obtained from two construction projects which were done by the same  contractor but using different procurement methods showed that rework, on the design part which occurs when the activities and materials order are different from those specified on the original contract document, makes it difficult for the project to finish on the expected time (Idrus, Sodangi, and Husin, 2011). This is as a result of non-collaboration and integration between the design team, contractor, and tier suppliers. The rework on the design portion has a huge impact on  project failure leading to the time overrun.  The traditional method of procurement has inadequate  flexibility  required  to facilitate late changes to  the project design once the design phase of the construction project has been concluded.

Nigerian most widely used procurement method is the traditional method of procurement (design-bid-construct) which has been confirmed to be less effective to successfully delivery of a construction project (Dim and Ezeabasili, 2015). And, the world bank country procurement assessment report (2000) cited in Anigbogu and Shwarka, (2011) reported that about 50% of projects in Nigeria are dead even before they commence because they were designed to fail.

The way the construction projects are contracted, in addition to the way the contracts are delivered, contributes to the causes of projects failure. Particularly, among the methods of project contracting is lump-sum or a fixed-price contracting method, in which the contractor agrees to deliver a construction project at a fixed price. The fixed-price contract can be low-bid or not however, once the contract cost has been agreed upon the contract award, it cannot be changed. And, contractors are expected to honor and deliver the contract agreement, failure to do so can result  in a  breach of contract which can result in the contractor being  prosecuted.  

Awarding a contract to an unqualified personnel also contributes to project failures. When a contractor places more emphasis on money and the mobilization fee after a construction project has been initiated instead of getting the right workforce and skilled professionals that will execute the project. Instead the workforce chosen will often not be base on competence and required skills rather it will be based on availability. Moreover, poor strategy and planning by contractors who have overloaded with work  also contributed to one of the causes of project failure.

Poor funding/Budget Planning

A lot of public projects in the Nigerian construction industry failed as a result inadequate funding, and the difference between the national annual budget and the budget actual released. Most of the Nigerian public projects are signed  even before the actual release of the national budget. The difference in budget of the contracted project and the actual budget release can get the contracted company stuck as a result of inflation of prices, scarcity of construction material at the time of the budget release and mobilization to site. Also  un-planned scope of work which can be as a result of the contractor working on another contract when he is called back  to  mobilization to start work. Moreover, poor budget planning is a regular mistake made by some contractors by not undertaking feasibility assessments  before starting the design. The construction project should be planned according to the available resources and not according to the unrealistic expectations a  client has in mind.

Discrepancies  Between the Design and Construction

Limited  collaboration between the contractors, engineers, and the architect results in discrepancies between the project designs and construction on site, and further leads to rework. Changes on a project designs, and changing to the scope of work in the middle of construction processes on site can be dangerous, and can lead to time overrun, increase in cost, and most of all can lead to abandonment. Moreover, many cases have been seen where the designs from the architects are not buildable  on site, while   In some cases, most contractors are unable to adequately specify the scope of work for the construction processes on site. Therefore any default on the design by the architect can be an opportunity for the contractor to make more money which might cause the project duration to exceed the time specified on the contract document.

RESEARCH METHODOLOGY

This research starts with a general reasoning or theory which says that the major cases of project failure in the Nigerian construction industry are defined based on time overrun and cost overrun. The findings from the data analysis will help on the decision to accept the theory or not. The research data was collected from the progress report for the month ending of October, 2015 published by the Nigeria of Federal Ministry of works on thirty-nine on-going highway construction projects at the South-South geopolitical zone. The table 1 below shows the information on the data collected which comprises of the project title, contract Number, project description, the contractor that was awarded the projects, the date of project commencement, date of completion and the extended date if any. The scheduled time for each project was specified as follows: project commencement date labeled as “a”,   project completion date labeled as “b”, and the extended date labeled as “c”.

Table 1: The analyzed data on the highway project at the South-South zone in Nigeria.
Table 1: The analyzed data on the highway project at the South-South zone in Nigeria.

image2

image3

image4

image5

image6

image7

image8

DATA ANALYSIS

The data analysis was done with the use of Microsoft excel. The analysis started by obtaining the number of days between the date of commencement of each project and the date of completion to show the duration of each highway project. And, the number of days between the project completion date and the extension date showed the time-overrun. The project duration and the extended days were obtained with the use of NETWORKDAYS function in Microsoft Excel which calculates the number of working days between two dates excluding weekends and any dates identified as holidays.

The standard deviation between the specified project duration for each highway projects and the extended days was calculated to obtain the extent to which each highway project contract failed on its time of delivery. This was denoted as the degree of failure. The table 1 above showed the projects ranking which was done based on the degree of failure of all the highway projects. The highway projects that were ranked from one to sixteen have low degree of failure and are represented with green color, while the rest are those with high degree of failure and are represented with red color.

FINDINGS

The findings made showed that the successfully completed highway projects have no extended days or time overrun, and the successful on-going highway projects are still on schedule and have no extended days unlike the on-going highway projects that have already failed as a result of the extended dates. Other projects have been abandoned because they have exceeded the delivery date as specified on the contract document, and have no extended date of completion. Thus, no work is going on.

Figure 1: Abundance of failed highway projects at south-south zone, Nigeria.
Figure 1: Abundance of failed highway projects at south-south zone, Nigeria.

Figure 2: On-going failed highway projects
Figure 2: On-going failed highway projects

Figure 2 above showed that 14% of highway projects are still on-going projects because they have not exceeded the original date of completion as specified on the contract document. However, they are heading towards failure because they have been given an extended date of completion which can be as a result of some critical activities running behind schedule, causing delay on the critical path network of the projects. Moreover, the other 86% completely failed because they have exceeded their completion date specified on the contract document.

Figure 3: Successful on-going highway projects
Figure 3: Successful on-going highway projects

The figure 3 above showed that 63% of the successful highway projects are still on-going because they have not exceed their completion dates, and they are not yet completed. However, those on-going highway projects might end up as failed projects as a result of poor funding, discrepancy between the design and the construction on site, and conflict between the construction parties or stakeholders.

“Say what you will do, and do what you said” or “Say as you will do it, and do it as you said”

CONCLUSION AND RECOMMENDATION

The idea of knowing what a failed project is, the factors and the causes is very important in project management. Success in project management can neither be achieved nor measured without the knowledge of project failure, its factors, and causes in the Nigerian construction industries. This work has shown that project failure is as a result of exceeded time of delivery, cost overrun, and poor quality. However, the analysis was only done based on exceeded time of project delivery because of the nature of the data collected.

This work suggested a few approaches to help reduce the number of failed projects in the Nigerian construction industry if properly implemented. Firstly, Having good collaboration between the project stakeholders involved in a construction project at the early stage of project conception is most important in order to accomplish the project objectives, and deliver the project on time, within budget, and quality specified on the original contract document (Othman, 2006).

Secondly, Adopting the ISO 9000 technique which is used for quality management will also help in achieving a successful project delivery. This technique states “ say what you will do, and do what you said” or “say as you will do it, and do it as you said”. This technique is not an indication of high quality but it promotes control and consistency which leads to specialization, and improved productivity and quality. Also, adopting the principles of lean construction will help to reduce waste within the construction and stream-line activities in order to improve the on-time delivery of projects.

Thirdly, Learning from the precedent failed projects, how those projects failed, and the reason for their failures. This will help the project manager  to plan and mitigate the risks of project failures in the future. And, finally, more seminars and workshops will help to educate and enlighten clients (the federal government representatives), users, contractors, engineers, and architects on what is project failure, the factors that contributes to abundant failed projects, and their causes.

REFERENCE

Abimbola, A. (Novermber 24, 2012). About 12,000 Federal Projects Abandoned across Nigeria. Premium times (November 16, 2015). Retrieved from www. Premium timesng.com/news/108450-about-12000-federal-projects-abandoned-across-nigeria.html.

Al-Khali, M.I and Al-Ghafly, M.A. (1999). Important Causes of Delays in Public Utility Projects in Saudi Arabia. Construction management and Economics, 17, 647-655

Aibinu, A.A and Jagboro, G.O. (2002). The Effects of Construction Delays on Project Delivery in Nigeria Construction Industry. International journal of Project management, 20(8), 593- 599.

Anigbogu, N. and Shwarka, M. (2011). Evaluation of Impact of the Public Procurement Reform Program on Combating Corruption Practices in Public Building Project Delivery in Nigeria. Environtech Journal, 1(2). 43-51.

Assaf, S. and Al-Hajji, S. (2006). Causes of Delays in large Construction Projects. International Journal of Project Management, 24, 349-357.

Atkinson , R. (1999). Project management: Cost, time, and quality, two best guesses and a Phenomenon, it’s time to accept other success criteria. International Journal of project Management, 17(6), 337-342.

Belout, A and Gauvrean, C. (2004). Factors Influencing the Project Success: The impact of human resource management. International Journal of project Management, 22, Pp. 1-11.

Butcher, N. and Demmers, L. (2003). Cost Estiumating Simplified. Retrieved from www.librisdesign.org.

Cookie-Davies, T. (2002). The Real Success Factors on Projects. International Journal of Project management, 20(3), 185-190.

Dim, N.U. and Ezeabasili, A.C.C (2015). Strategic Supply Chain Framework as an Effective Approach to Procurement of Public Construction Projects in Nigeria. International Journal of Management and Susutainability, 4(7), 163-172.

Hanachor, M. E. (2012). Community Development Projects Abandonment in Nigeria: Causes and Effects. Journal of Education and Practice, 3(6), 33-36.

Idrus, A., Sodangi, M., and Husin, M., H. (2011). Prioritizing project performance criteria within client perspective. Research Journal of Applied Science, Engineering and Technology, 3(10), 1142-1151.

Idrus, A. and Sodangi, M. (2010). Framework for evaluating quality performance of contractors in Nigeria. International Journal of Civil Environment and Engineering. 10(1), 34-39.

National Bureau of Statistics (January, 2015). Nigerian Construction Sector Summary Report: 2010-2012.

Kotangora, O. O. (1993). Project abandonment, Nigerian Tribune.

Osemenan, I. (1987). Project Abandonment. New Watch Magazine, Vol. 1, pp. 15.

Othman, M.,R. (2006). Forging main and sub-contractor relationship for successful projects. Retrieved from http://rakanl.jkr.gov.my/csfj/editor/files/file/projek/lessonslearned/MAIN&SUB_2.pdf

Phua, F.T.T and Rowlinson, S. (2003). Cultural Differences as an Explanatory Variable for Adversarial Attitude in the Construction Industry: The case of HongKong. Construction Management and Economics, 21, 777-785.

Reiss, B. (1993). Project Management Demystified. London: E and FN Spon Publishers.

Toor, S. R. and Ogunlana, S. O. (2008).Problems causing Delay in Major Construction Projects in Thailand. Construction management and Economics, 26, 395-408.

Toor, S. R. and Ogunlana, S. O. (2008). Critical COMs of Success in Large-Scale Construction Projects: Evidence from Thailand constructuction industry. International Journal of Project management, 26(4), 420-430.

Toor, S. R. and Ogunlana, S. O. (2009).Beyound the “Iron Triangle”: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. International Journal of Project management, doi: 10.1016/j.ijproman.2009.05.005.

Toor, R. and Ogunlana, S. (2009). Construction Innovation: Information, process, management. 9(2), PP. 149-167.

Turner, J. R. (1993). The Handbook of project-Based Management: Improving the process for achieving strategic objective. London, McGraw-Hill.

Wright, J., N. (1997). Time and Budget: The twin imperatives of a project Sponsor. International Journal of Project Management, 15(3), 181-186.

33 of the Most Inspirational Leadership Quotes for You to Live By

We’ve all seen quotes designed to motivate or inspire us.  Well, according to a new study, people who post these ‘inspirational’ quotes also have lower levels of intelligence. However, Godinterest disagrees, and see’s some quotes as  universal nuggets of wisdom. You know the ones – those quotes that give you “Aha!” moments of inspiration or meaningful insights into  your personal and professional lives.  These are the ones you  want to print out and place on your fridge  so you’ll see them  every day.

This collection of inspirational quotes features some of the all-time classics you may know, as well as some lesser-known  ones  you’ll love too. If  you have any quotes you would have added, feel free to share in the comments section!

  1. “The reason most people never reach their goals is that they don’t define them, or ever seriously consider them as believable or achievable.” – Denis Watley
  2. “Our goals can only be reached through a vehicle of a plan, in which we must fervently believe, and upon which we must vigorously act. There is no other route to success.” – Stephen A. Brennan
  3. “Without goals, and plans to reach them, you are like a ship that has set sail with no destination.” – Fitzhugh Dodson
  4. “Goals are dreams with deadlines.” – Diana Scharf Hunt
  5. “You must have long-term goals to keep you from being frustrated by short-term failures.” – Charles C. Noble
  6. “Crystallize your goals. Make a plan for achieving them and set yourself a deadline. Then, with supreme confidence, determination, and disregard for obstacles and other people’s criticisms, carry out your plan.” – Paul Meyer
  7. “The tragedy of life doesn’t lie in not reaching your goal. The tragedy lies in having no goals to reach.” – Benjamin Mays
  8. “Progress has little to do with speed, but much to do with direction.” – Unknown
  9. “The world makes way for the man who knows where he is going.” – Ralph Waldo Emerson
  10. “Goals help focus you on areas in both your personal and professional life that are important and meaningful, rather than being guided by what other people want you to be, do, or accomplish.” – Catherine Pulsifer
  11. “What you get by achieving your goals is not as important as what you become by achieving your goals.” – Zig Ziglar
  12. “It doesn’t matter where you are coming from. All that matters is where you are going.” – Brian Tracy
  13. “The true measure of a man is not how he behaves in moments of comfort and convenience but how he stands at times of controversy and challenges.” – Martin Luther King Jr.
  14. “It’s not the load that breaks you down, it’s the way you carry it.” – Horne, Lena
  15. “Difficulties are meant to rouse, not discourage. The human spirit is to grow strong by conflict.” – William E. Channing
  16. “Nothing is particularly hard if you divide it into small jobs.” – Henry Ford
  17. “It’s not whether you get knocked down. It’s whether you get up again.” – Vince Lombardi
  18. “You must do the thing you think you cannot do.” E- Eleanor Roosevelt
  19. “Motivation is what gets you started. Habit is what keeps you going.” – Jim Ryun
  20. “Strong lives are motivated by dynamic purposes.” – Kenneth Hildebrand
  21. “People who are unable to motivate themselves must be content with mediocrity, no matter how impressive their other talents.” – Andrew Carnegie
  22. “Be miserable. Or motivate yourself. Whatever has to be done, it’s always your choice.” – Wayne Dyer
  23. “The surest way not to fail is to be determined to succeed.”  – Richard B. Sheridan
  24. “A determined person will do more with a pen and paper than a lazy person will accomplish with a personal computer.” – Catherine Pulsifer
  25. “There is no chance, no destiny, no fate, that can hinder or control the firm resolve of a determined soul.” – Ella Wheeler Wilcox
  26. “It was courage, faith, endurance and a dogged determination to surmount all obstacles that built this bridge.” – John J. Watson
  27. “Failure will never overtake me if my determination to succeed is strong enough.” – Og Mandino
  28. “You’ve got to get up every morning with determination if you’re going to go to bed with satisfaction.” – George Lorimer
  29. “We will either find a way or make one!” – Hannibal
  30. “That some achieve great success, is proof to all that others can achieve it as well.” – Unknown
  31. “Do not let what you cannot do interfere with what you can do.” – John Wooden
  32. “Success seems to be largely a matter of hanging on after others have let go.” – William Feather
  33. “Success is the sum of small efforts, repeated day in and day out.” – Robert Collier

 

You Were Never Made to Be ‘Productive’

Compared to people in other industrialized nations, Americans work longer hours, take fewer vacation days, and retire later in life. Busyness, once seen as the curse of the disadvantaged, has become equated with status and importance. Our work increasingly defines who we are.

“Godly rest (distinct from play, relaxation, or sleep) is inextricably tied to our identity as children of God.”

The solution perhaps is to be “Lazy Intelligent”?  That sounds like something an unsuccessful, lazy slacker would say, isn’t it? Actually, it’s the opposite. One of America’s most influential and controversial science fiction authors Robert Heinlein uttered these words during his time. Despite his nod to laziness, Heinlein went on to pen hit titles such as Starship Troopers and Stranger in a Strange Land.

Productive laziness is not about doing absolutely nothing at all. It’s not about just sitting around and drinking coffee or engaging in idle gossip while watching the non-delivered project milestones disappear into the horizon. In fact, this behavior would lead to a very short-lived project management career.

Laziness Is Not Synonymous with Stupidity

Instead, productive laziness should be viewed as a more focused approach to management. Adopting this mindset means concentrating efforts where it really matters, rather than spreading yourself thing over unimportant, non-critical activities that in some cases don’t need to be addressed at all.

According to the Pareto Principle — Also Known as the “80/20 Rule” — 80 Percent of the Consequences Stem from 20 Percent of the Causes.

While the idea has a rule-of-thumb application, it’s also commonly misused. For example, just because one solution fits 80 percent of cases, that doesn’t mean it only requires 20 percent of the resources needed to solve all cases.

The principle, suggested by management thinker Joseph M. Juran, was named after Italian economist Vilfredo Pareto, who observed that 80 percent of property in Italy was owned by 20 percent of the population. As a result, it was assumed that most of the result in any situation was determined by a small number of causes.

Rest Is at the Center of God’s Design

Every smart but lazy person should consider the 80/20 Rule each day. For managers, the principle is a reminder to concentrate on the 20 percent of work that really matters.

Contrary to belief, 80 percent of success is not just showing up. In fact, only 20 percent of what you do during the day will produce 80 percent of your results. Therefore, it is important to identify and focus on that 20 percent during the working day.

Project Journal5

When genius and laziness meet, the results can be magical. Being just the right combination of smart and lazy can bring you to have a real edge over others. Interestingly enough, smart lazy people are generally better suited for leadership roles in organizations.  These people make great strategic thinkers and leaders. They do things in a smart way in order to expend the least effort. They don’t rush into things, taking that little bit of extra time to think and find the shortest, best path.

They  question, contradict, and show dissent against inefficient methods or unnecessary tasks.

“Whenever There Is a Hard Job to Be Done, I Assign It to a Lazy Man; He Is Sure to Find an Easy Way of Doing It. — Bill Gates”

Bill’s not the only guy, who believes that laziness doesn’t necessarily have to be a bad thing.  German Generalfeldmarschall Helmuth Karl Bernhard Graf von Moltke was the chief of staff for the Prussian Army for 30 years. He is regarded as one of the greatest strategists of the latter 1800s among historical scholars and is the creator of the more modern method of directing armies in the field.

Moltke observed his troops and categorized them based on their intelligence, diligence and laziness. If soldiers proved to be both lazy and smart, they were promoted to leadership because they knew how to be successful with efficiency. If soldiers were smart and diligent, they were deployed into a staff function, focusing on the details. Soldiers who were not smart and lazy were left alone in hopes they would come up with a great idea someday. Finally, soldiers who were not smart but diligent were removed from ranks.

Like Moltke’s army, the lazy manager is all about applying these principles in the delivery and management of work. You’re likely not stupid since you’ve landed the management position, but how are your lazy skills? Applying smart-lazy tactics will not only allow your work to be more successful, but you will also be seen as a successful individual and a top candidate for future leadership roles.

Think return on investment (time spent versus money earned ratio) rather than busy work and  don’t restrict yourself to a certain way  of doing things just for the sake of the status quo.

These people make great strategic thinkers and leaders. They do things in a smart way in order to expend the least effort. They don’t rush into things, taking that little bit of extra time to think and find the shortest, best path.

In the wise words of Bill Gate’s and American automotive industrialist Walter Chrysler, “Whenever there is a hard job to be done, assign it to a lazy man or woman for that matter; as he or she is sure to find an easy way of doing it.”

For an overachieving people-pleaser like me, thinking of rest as an innate part of who we were created to be—not as a discipline or something to be earned—is compelling. It is yet another form of God’s infinite grace, one that’s needed today more than ever.

Co-Author Peter Taylor

Described as “perhaps the most entertaining and inspiring speaker in the project management world today”, Peter Taylor is the author of two best-selling books on ‘Productive Laziness’ – ‘The Lazy Winner’ and ‘The Lazy Project Manager’.

 

35 Powerful Quotes That Will Inspire You to Be Successful

Being a both a Christian and a leader can be an emotional ride, with ups, downs, joy, and disappointment. Words have power and these inspiring and motivating quotes are guaranteed to challenge the way you think and perhaps even change the way you live.

We  hope they resonate with you as much as they have with us.  Sometimes a little piece of advice or wisdom from a brilliant mind can help you motor through even the most difficult of times.

  1. I’ve learned that people will forget what you said, people will forget what you did, but people will never forget how you made them feel. ’- Maya Angelou
  2. It’s not the load that breaks you down, it’s the way you carry it. ’- Lou Holtz
  3. What happened, happened, and it wouldn’t have happened any other way. Lewis Carroll
  4. Choose a job that you like, and you will never have to work a day in your life. ’- Confucius
  5. Fools give full vent to their rage, but the wise bring calm in the end. ’-  Proverbs 29:11
  6. Perfection is not attainable, but if we chase perfection we can catch excellence. —Vince Lombardi
  7. Whatever the mind can conceive and believe, the mind can achieve. ’- Napoleon Hill
  8. Keep away from people who try to belittle your ambitions. Small people always do that, but the really great make you feel that you, too, can become great. ’- Mark Twain
  9. The function of leadership is to produce more leaders, not more followers. ’- Ralph Nader
  10. As iron sharpens iron, so one person sharpens another. ’- Proverbs 27:17
  11. If you cannot do great things, do small things in a great way. ’- Napoleon Hill
  12. What is not started will never get finished. ’- Johann Wolfgang von Goethe
  13. When you cease to dream, you cease to live. ’- Malcolm Forbes
  14. Build your own dreams, or someone else will hire you to build theirs. ’- Farrah Gray
  15. Your most unhappy customers are your greatest source of learning. ’- Unknown
  16. Winners never quit, and quitters never win. ’- Vince Lombardi
  17. Your time is limited, so don’t waste it living someone else’s life. ’- Unknown
  18. Life is 10% what happens to me and 90% of how I react to it. —Charles Swindoll
  19. The price of success is hard work, dedication to the job at hand  and the determination that whether we win or lose, we have applied the best of ourselves to the task at hand. ’- Vince Lombardi
  20. Speak your mind, even if your voice shakes. ’- Maggie Kuhn
  21. It takes 20 years to build a reputation and five minutes to ruin it. If you think about that, you’ll do things differently. ’- Warren Buffett
  22. Remember no one can make you feel inferior without your consent. —Eleanor Roosevelt
  23. When someone tells me “no,” it doesn’t mean I can’t do it, it simply means I can’t do it with them. ’- Karen E. Quinones Miller
  24. If you want to lift yourself up, lift up someone else. —Booker T. Washington
  25. You can’t build a reputation on what you are going to do. ’- Henry Ford
  26. A person who never made a mistake never tried anything new. ’- Unknown
  27. I am not a product of my circumstances. I am a product of my decisions. —Stephen Covey
  28. Logic will get you from A to B. Imagination will take you everywhere. ’- Unknown
  29. Remember that not getting what you want is sometimes a wonderful stroke of luck. ’- Unknown
  30. I can’t change the direction of the wind, but I can adjust my sails to always reach my destination. —Jimmy Dean
  31. If you’re offered a seat on a rocket ship, don’t ask what seat! Just get on. —Sheryl Sandberg. —  Proverbs 15:1
  32. A gentle answer turns away wrath, but a harsh word stirs up anger
  33. Everything you’ve ever wanted is on the other side of fear. —George Addair
  34. The most difficult thing is the decision to act, the rest is merely tenacity. —Amelia Earhart
  35. A good name is more desirable than great riches; to be esteemed is better than silver or gold. —  Proverbs 22:1

Bookmark this page and come back to it when you need some inspiration and motivation.

A Day in the Life of a Project Manager

Managing Daily Routines: A Day in the Life of a IT Project Manager

We all know that project managers are responsible for managing projects through to completion while remaining on time and within budget, but how exactly do they do it? What does a typical day look like for a project manager?

Here’s a sample of what a typical day might look like for a project manager.

The Early Bird Gets the Worm, Success Comes to Those Who Prepare Well and Put in Effort

8.30  am: Starting the day
After settling in for the day’s activities, it’s time to plan out the day. Start up the computer, email clients, draft team schedules, organize time sheets and  create the to-do list.

To-do lists help managers and their teams stay on track. If a manager notices that one team member has yet to deliver an assignment, they can address this issue first thing in the morning; otherwise, delays can build up and affect the project. Likewise, lists help managers see the next course of action for projects.

9:15 am: Time to get moving

Efficiency is a must and there is no time to be wasted in project management. After a quick review of project plans and to-do lists, the manager must be prepared to get his team moving right away.

Round up team members, review the project’s current position and emphasize the next course of action. In order to get the team moving on assignments, strong project managers set deadlines throughout the day.

Morning team meetings are also necessary to make sure each member understands the project and their assignments. It’s also a time to answer any questions for clarity or to get feedback or concerns from individuals.

While daily group meetings can be important, they are not always necessary and can be counter-productive. If the team is on the same page and everyone is ready to tackle the tasks of the day, spend a short period re-grouping so that the team can get on and complete their assignments. There’s no need to spend hours planning and reviewing.

10 am: Meetings, meetings, meetings
More than one project manager will be  more than likely  in the office  and they will all need to work together for the benefit of the programme. This is why meetings with other managers and higher ups are necessary in a project manager’s day.

Meetings allow each project manager to go through the status of their respective projects and to track the weekly schedule and other deadlines. It is also a time to address any business-critical tasks that might come up.

It’s worth considering that only 7% of communication is spoken. The other 93% is made up of tone (38%) and body language (55%). So although facts and figures are easily communicated via email, letter or phone, an actual discussion or negotiation is best handled where you can see the other person and therefore are able to see for yourself what their tone and body have to say on the matter.

10:30 am: Tackling the small stuff
Meetings will be on and off throughout the day for project managers, which is why it’s important to tackle the small tasks in between appointments. Small tasks include wrapping project reports, booking future meetings, answering correspondences with other colleagues, reviewing items and team reports among other things.

It’s also important to schedule post-mortem meetings with the project team  to review the success of  projects  in order  to apply any  lessons learnt to future projects.

11 am: Project kick-off meeting
When one project ends, another begins, which means it’s time for yet another project kick-off meeting. Kick-off meetings can take on various forms, depending on the type of business. However, they all share the same basic needs.

Every individual involved with the new project should be in attendance and have the latest version of project specifications in written form. As project manager, it might be wise to send this to team members several days before the kick-off meeting to ensure everyone has time to review.

During a kick-off meeting, it’s important to review the overall goals for the project, both commercial and technical details, break down functional requirements, and spend time for discussion and questions. By allowing team members to communicate questions and share ideas, it opens the lines of communication and may bring up potential concerns that might have been missed in the initial planning stages.

Conclude kick-off meetings with a definition of the next steps and be sure individuals are aware of deadlines and their assignments.

11:30 am: Reviewing project specs, budgets and scheduling submissions
Other important tasks to tackle in between meetings include reviewing specifications and budgets and schedules for future projects. If a project begins that day, now would be a good time to  apply the  finishing touches to the project documentation before presentation and approval.

When it comes to establishing project estimates and budgets, a project manager must bring all of his experience into play in order to create a realistic budget that includes wiggle room for factors such as project complexity, team experience and skill levels, stakeholders involvement, time needed, third-party services needed, and contingency allowances among many other things.

It’s Not Easy to Squeeze in a Lunch Break, but It’s Often Necessary for the Project Managers Health and Sanity

12 pm: Lunch
In the midst of the seeming chaos that is project management, be sure to fuel up for the rest of the day’s work. Lunch is also a great span of time to check in with team members to make sure they are still on target for later-day deadlines.

2 pm: Launching the next project
After digesting lunch, it’s time to launch the next project. Get the whole team ready to go live and present the project to the client and begin testing aspects of the project in a live environment. It’s a time to spot problems and address them and review schedules and deadlines and other project needs.

3 pm: Time for everything else
The final two hours in the office are spent addressing everything else on the project manager’s plate. A project manager must be good at multi-tasking and whatever duties couldn’t be accomplished throughout the day are reserved for the final hours. Most of the time, lower priority tasks are reserved for afternoon hours. These tasks could include project update meetings with various departments, logging finances, reviewing monthly project schedules, approving time sheets, writing weekly reports, sorting purchase orders and communicating with suppliers. There are so many other small to-do list items that project managers are responsible for, but are often overlooked.

Spending Time at the End of the Day as Well as the Beginning to Review and Plan Will Only Help You Succeed as a Project Manager

5 pm: Review the day, plan for tomorrow
Before heading home, review the day’s list and what’s been accomplished. Anything that has been added or was left unfinished should be scheduled for the next day or sometime throughout the week. Reflect on your team’s work and clear the email inbox. Use a filing system that makes sense for you and be ruthless about deleting stuff. The beauty of an empty inbox is a thing to behold. It is calming, peaceful and wonderful.

Small Projects Often Mean Greater Innovation

Small projects often embody more innovation than larger more costly or high profile ones.

Innovation is a wide concept that includes improvements in processes, products and services. It involves incorporating new ideas which generate changes that help solve the needs of a company and so increase its competitiveness. That’s hardly big news. But what may be surprising to some is that innovation has itself, well, innovated and it isn’t what it used to be.

New materials and energy, design approaches, as well as advances in digital technology and big data, are creating a wave of innovation within the construction industry. These new ideas are increasingly often tested and proven on smaller and agiler projects. Investing time and money is well spent on  these  ideas and technical improvements can then be used on large-scale developments.

Here are  three exciting small projects:

Vanke Pavilion - Milan Expo 2015 / Daniel Libeskind
Vanke Pavilion – Milan Expo 2015 / Daniel Libeskind

Vanke Pavilion - Milan Expo 2015 / Daniel Libeskind
Vanke Pavilion – Milan Expo 2015 / Daniel Libeskind

VANKE PAVILION Milan, Italy
VANKE PAVILION
Milan, Italy

1. Vanke Pavilion – Milan Expo 2015

The  corporate pavilion for Vanke China explores key issues related to the theme of the Expo Milano 2015, “Feeding the Planet, Energy for Life”.

Situated on the southeast edge of the Lake Arena, the 800-square meter pavilion appears to rise from the east, forming a dynamic, vertical landscape.

The original tiling pattern would have resulted in thousands of ceramic tiles of different sizes and shapes. The resulting complexity and lack of repetition could have led to high costs and a longer erection time.

Working with Architects Studio Libeskind, Format Engineers  (Engineering Designers with backgrounds in structural engineering, coding, mathematics, and architecture) changed the pattern from thousands of different tiles to less than a dozen and  simplified the  backing structure generating  huge cost savings. Format Engineers also proposed ‘slicing’ of the building and then fabrication of  the primary structure of steel ribs using  low tech flat steel plate elements.  These were then used in a series of long span portalised frames reminiscent of the ribs and spars in traditional boat building  resulting in a  column-free area for the display of Chinese Cultural Heritage.

The frame was built to a budget and without difficulty ahead of the neighboring Expo buildings.

Building Size
12 meters high
740 mq gross floor area (exhibition, service & VIP levels)
130 mq roof terrace

Architect:  Studio Libeskind

Engineer:  Format Engineers

Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion

Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion

Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion

2.  Oxford Brookes Rain Pavilion

The Rain Pavilion is an urban forest sculpture forming the front entrance to Oxford Brookes University’s Architecture Faculty.

“Rain Pavilion artwork is a sensory experience for the community.”

The complex form required extensive wind modeling and comprehensive structural analysis within a generative 3d model. This was allied with Format Engineers in-house code for the self-organization of voids and their subsequent redistribution.

.At each stage of the design process different modeling and analysis techniques were used to exploit the form and to optimise the structure. The considerable challenges posed by the slenderness of the structure and its dynamic behavior under wind were resolved by combining Computational Fluid Dynamics (CFD)  (a branch of  fluid mechanics  that uses numerical analysis and algorithms to solve and analyze problems that involve  fluid  flows) with a generative design environment. Conceptual design introduced the ideas of tubular stems and folded steel canopies, both of which were  perforated by circular holes arranged to allow the interplay of light and water through the structure. The voids were generated using a self-organizing process.

Grasshopper  (a graphical algorithm computer 3-D modeling tool)  was used  to produce a mesh that could include the voids in both the stems and the petals.

The Rain Pavilion is designed to celebrate the sound of rain, and the noise of water interacting with different sections of the installation is part of the experience of passing through it. The structure has a design life of five years and can  be transported to other locations.

Architect:  Oxford Brookes University, Oxford, UK

Engineer:  Format Engineers

KREOD Pavilion
KREOD Pavilion

KREOD Pavilion
KREOD Pavilion

KREOD Pavilion
KREOD Pavilion

3.  KREOD Pavilion

The KREOD pavilions were first erected on the London Greenwich Olympic site in 2012.  Easily rearranged, three pod-like pavilions were formed with a wooden structural framework comprised of an open hexagonal composition.

Standing three meters tall, each double-curved wooden shell enclosed a footprint of 20 square meters,  totaling 60 square meters. A  waterproof tensile membrane sealed the interior from the elements fully portable with demountable joints,  the individual components can be  stacked for efficient transportation.

Chun Qing Li the architect required a temporary exhibition or function space that could be erected and demounted mostly by hand and by untrained staff. The quality of finish needed to  echo that of handmade furniture and had to be low cost and quick to erect. The continuously changing double curved form of the enclosure meant that in theory, every nodal connection was  different. A conventional bolted solution would have cost hundreds of pounds per fixing. Format Engineers  suggestion of a ‘reciprocal’ jointed timber grid shell required standard  bolts which equated to a fraction of the normal cost. It also allowed the structure to be built from simple and light flat timber elements.

The structure used Kebony timber throughout, a sustainable alternative to tropical hardwood. As this material had not previously been used in a structural context Format Engineers undertook load testing of the material and the connections at the University of Cambridge. The timber was fabricated using CNC routing (a computer controlled cutting machine)  allowing a highly accurate fit between members and basic  erection on site.

Architect:  Chun Qing Li  

Engineer:  Format Engineers

 

9 Suggestions for Overcoming Barriers to Good Design When Using Modern Methods of Construction (Mmc)

The term ‘Modern Methods of Construction’ (MMC)  embraces a range of technologies involving various forms  of prefabrication and off-site assembly.

MMC is increasingly regarded as a realistic means of  improving quality, reducing time spent on-site, improving  on-site safety and addressing skills shortages in the  construction of UK housing.

Bridge Crossing Modern Design
Bridge Crossing Modern Design

The variety of systems now available potentially allows the  designer enough choice to sidestep problems deriving  from constraints posed by the use of any one method.  MMC systems, from closed-panel timber framed  systems to bathroom pods are a palette from which  designers can make choices. They are not necessarily  stand-alone solutions that anticipate all the needs of  an individual site and can be mixed and matched  as appropriate.

These limitations are not obstacles to achieving the good design in MMC-based schemes, but may hinder  the incorporation of more complex and innovative  types of MMC from which greater overall benefits  may be obtained  which  are considered under the  following headings:

1. COST UNCERTAINTY

There is no doubt that, given products of comparable  performance the key issue in purchases of MMC construction  systems is the price. At present not enough is known  about the potential costs of using volumetric and  closed panel systems to enable confident specification  at an early date. This inhibits designers from exploring  the full potential of MMC systems. This is particularly true of the less repetitive,  small, one-off scheme, where a smaller margin  of benefits is gained from using MMC. The principal  barrier to the uptake of MMC, therefore, seems  to be the perception of cost uncertainty with respect to using more complex systems.  Without doing substantial project-specific research,  consultants and their clients simply do not know with  enough degree of certainty how much the volumetric or  closed panel systems are likely to cost, and what  would be the savings to overall project costs produced  by potential speed gains to offset against increased  capital expenditure.

This is due to the complexity of assessing the ratio of  cost of repetitive elements where pricing is relatively  straightforward to the cost of adjusting elements or  building in another method for the abnormal condition.  Decisions to use innovative systems are likely to be  made once designs are well progressed to enable  teams to be more certain of costs. This can increase  the potential for change or result in design compromise  as the designer attempts to incorporate the specific  limitations of a particular system in their design.

In an attempt to improve this situation, the MMC consultant and or clients  could  pull together a  directory of MMC  expanded to include cost comparison data. The huge  range of variables involved inevitably makes this  difficult, but a database of current construction cost  information  would be an  invaluable resource.

Contemporary Building Facade
Contemporary Building Facade

2. PLANNING PROCESS AND EARLY COMMITMENT  TO A SYSTEM

The time it can take to obtain planning permission has  obvious implications both for project cost but also, in  some circumstances, for architectural  design innovation.

Most of the more complex types of MMC have an  impact on dimensioning, the choice of external finish  and detailing may have some effect on the buildings  mass. Therefore,  the construction system should be  chosen prior to a planning application to avoid  abortive work, redesign or amendment, or even  resubmission for planning permission.

However,  developers  whose money is at risk, frequently hold  off deciding on the construction technique until the last  practicable moment, in order to get any advantage from  fluctuations in material or component pricing.

Given the potential for lengthy duration of planning  applications, this means that there is little incentive to  prepare initial designs for planning with a prior decision  to incorporate MMC firmly embedded. In cases where  the developer has a financial or business link with the  supplier, this is less likely to be the case. As the majority  of commercial or  residential developments involve some kind of arrangement with a developer, agreement on construction systems is often left to the stage after planning.

3. TIME INVESTMENT

Another very significant factor is the time investment required at  the early stages of projects. This is needed to develop the design when the project is still at risk. There is a  direct relationship between the scale and complexity of  MMC component and the amount of time required to  develop a design at an early stage.

The introduction of advanced or complex MMC  techniques into the design process is potentially costly  to the design team. A significant amount of research is  needed to explore alternative systems, to obtain  verification of suppliers’   credentials, investigate  mortgage and insurance issues, visit previous sites,  talk to system suppliers, obtain technical performance  guidelines, understand junctions and interfaces, coordinate  other consultants, obtain building control input  and so on.

For a consultant, the only way of investing in this  research is either through timely payment of increased  fees by a visionary understanding client or through the anticipation of increased future productivity through repetition when a  project is phased, or large enough, or likely to be  followed by another similar project.

The potential of learning a system and then being able  to repeat lessons learned efficiently is a powerful  incentive for both client and consultant. By contrast, HTA’ s project at Basingstoke is an example  of a phased project with a three to four-year duration allowed the design team to repeat  various elements of the design, and the manufacturer to  develop improved solutions to technical and supply  problems.

HTA’ s project at Basingstoke
HTA’ s project at Basingstoke

4. INSUFFICIENT COMMUNICATION

Improved dialogue at the outset of the  project is  vital if design quality is to be  maximised. Constraints and opportunities implicit within  a particular system are more easily incorporated into  design if partners communicate pre-planning.  Increased early communication can be fostered through  improved long-term partnering relationships.

Clients  should also partner with a range of suppliers and  architects so that choice and flexibility is not restricted.

5. INEXPERIENCE

Generally, the inexperienced client or design team will  have to do more research, with the result  that there is likely to be significant design development  without a specific system being incorporated.

This is a  disincentive to using a more complex system involving a  higher proportion of MMC, where early decision making  and knowledge of a system’ s capabilities have a decisive influence on the nature of the architecture.  However,  encouraging the take up  of MMC through the use of a dedicated funding mechanism may  assist clients  in  finding time for  research into suitable MMC techniques.

Dome Construction Berlin
Dome Construction Berlin

6. SUPPLIER’S ROLE

Site capacity  studies and early stage pre-planning design studies  could be undertaken directly by system suppliers  on behalf of clients, cutting out the usual procedure  of commissioning design work by independent  consultants.

7. ASSUMPTIONS

There are a  number of assumptions that  are generally held about certain types of MMC that may  have been valid at one time but are no longer true today.  There is a need for reliable and up to date information  comparing system criteria, performance data, timescales, lead in times, capacity, construction time,  sequencing issues, limitations, and benefits.

Therefore  it would be helpful if a forum  for discussion and experience exchange was set up.

8. DEMONSTRATING THE BENEFITS OF MMC

There is still a large amount of skepticism about the  need to go very far down the line with MMC. This is  reflected in the acceptance of the desirability of  maintaining or indeed enhancing the pool of traditional  craft skills throughout the UK.

A balanced view is that there is a demonstrable need  for the wider use of MMC which is recognized by both  industry and government.  The best way for clients  and the public generally to  become more confident and knowledgeable about the  quality of design achievable through MMC is to see it  demonstrated.

9. FINANCIAL INCENTIVES

There is no doubt that spreading the burden of  investment through the life of a project helps to ensure  a higher standard of specification and hence quality. In  the Netherlands, a ‘ Green Financing’   system has been  developed by the Dutch government that provides  favorable loan finance when certain sustainable  standards are reached. In the UK, the Gallions HA  has  pioneered  a study of this, based on a scheme in  Thamesmead, ‘ the Ecopark project’.

Eco Park is an eco-friendly business park built on the False Bay coast. This business park is at the cutting-edge of sustainable design and offers a unique working environment in a secure, well-managed facility.
Eco Park is an eco-friendly business park built on the False Bay coast. This business park is at the cutting-edge of sustainable design and offers a unique working environment in a secure, well-managed facility.

 

As seen on