The Kingdom OF God is Like…

Lord, Prepare Me to Be a Godly Parent

While at seminary school I was told “you are what you’re becoming”. And in the new testament we are reminded that we are kingdom people now. So what’s God’s kingdom like? In God’s kingdom, when you give, it comes back to you pressed down, shaken together and running over. In God’s kingdom, you can have peace and prosperity in your spirit, soul and body, no matter what’s happening around you. If the economy crashes, God’s kingdom is still strong. If the housing market goes down, God’s kingdom is still strong. If petrol prices rise, God’s kingdom is still strong. Hallelujah! 

Scripture says that we are receiving a kingdom that cannot be shaken! The kingdom is simply God’s system, principles and promises. It’s His way of doing things. The Bible tells us over and over what God’s kingdom on earth is like,  that His kingdom is righteousness, peace and joy in the Holy Spirit. 

Today, be thankful for the system of God’s kingdom which orders the Christian’s life. Thank Him for His system of blessing that cannot be shaken by the drama of this world. As you keep an attitude of gratitude and walk in God’s kingdom ways, you’ll experience His hand of blessing all your days! 

“Therefore, since we are receiving a kingdom that cannot be shaken, let us be thankful, and so worship God acceptably with reverence and awe.” (Hebrews 12:28, NIV)

Let’s Pray

Yahweh, thank You for Your kingdom, not just to come but now! Father, thank You for Your system that blesses my life. God, I open my heart to You. Please show me Your ways so that I can be a kingdom person now, and walk-in Your kingdom way’s all the days of my life, in Christ’s Name! Amen.  

The Wyndham Road Project, Southwark

Britain’s first demountable multistorey housing development

A portable, demountable or transportable building is one of the many pre-fabricated house types which can be put to good use when planning constraints will only allow short-term development. Modules and components can be taken apart and transported to a new location. Even elements such as foundations can be easily removed using demountable technologies.  In Australia the word “demountable” in particular refers to portable classrooms.

Prefab Housing Has Been Heralded as the Future of Building and the Solution to Resolve Housing Shortages in the Uk.

The Wyndham Road Project

Client: Hyde Housing Association

Architect: PCKO

Principal Supplier: BUMA

The Wyndham Road project, incorporating 18 flats for key workers, was completed in summer 2005, designed as part of RAPID (Response to Accommodation Pressures through Innovative Design), Hyde’s response to the Government’s initiative to increase the supply of new housing through use of innovative technology.

This Scheme on Wyndham Road, South-east London, Was the Second Buma-built Project in the Uk.

The scheme comprised one and two-bedroom flats, built around three independent staircases, designed to modern, high-quality standards. Demountable construction is designed to accommodate any future changes to the urban fabric, therefore addressing the issue of urban sustainability and required flexibility. Demountability was built in right through to the foundations with the use of screw piles to hold up the structure.

The development could then  be dismantled in 9-10 days and erected on an alternative site, remodelled or recycled, as required. Elevations finished with lightweight metal cladding and insulated render incorporate full-height glazing and feature sliding shutters of galvanised steel and timber, painted in vivid colours, giving the building a unique identity. The building was  designed as 3-storey but could have been  extended to 4-storey by adding additional volumetric components.

Bridge House, Croydon, Is Prefab Really Prefabulous?

Prefabricated homes have been available for years and date back at least a century. The Sears Roebuck index made and offered prefab homes to the public as early as 1908, and Prefab was later explored by famous twentieth-century architects, such as, Walter Gropius, Le Corbusier, Marcel Breuer, Frank Lloyd Wright, who saw the method as a likely solution to the dilemma of housing in modern society.   Interest in Prefab grew in the first half of the twentieth-century, with the outburst of manufacturing expertise and the creation of the assembly line.

Historically the mention of prefabricated houses invokes memories of housing built to cover in the temporary a deficiency of housing in the UK following the World Wars.

The Government promised ‘homes fit for heroes’, however, negative public attitudes surfaced towards prefabricated housing because of substandard building materials used and poor workmanship.

A staggering 1 million of these homes were built during the 20th century and more than half a century on, many are still standing despite no foundations.   A few are listed while others have been demolished.

Today people remember the shabby mobile classrooms as in, bitter cold in winter and like an oven in summer.   Therefore, memories have rendered the concept of prefabricated houses an unattractive idea.   Talk about the term prefabricated housing to an architect, and their eyes will beam with visions of fascinating contemporary homes.   However, talk to the ordinary person on the street and people immediately think that we are going down the same path, a pretty hard image to shake off.   The very factors that are presented as positive advantages of prefabricated homes became liabilities in the eyes of homeowners who wanted a durable appreciating asset.

Prefab

An example can be found by looking at the prefabricated houses on Catford estate built by German and Italian prisoners of war in 1946.

Catford prefab estate. Robin Bell: 2008
Catford prefab estate. Robin Bell: 2008

‘They were not built to last and need regular maintenance.   They are just large sheds really and taking up a lot of space.   They should really be demolished.’   (Drake 2008)

Over the ten years, Lewisham Council has tried to develop the site many times and a review    found none of the dwellings met Decent Homes Standard.

So why do more and more developers  choose prefabricated construction?

First and foremost – Speed. “It may  take a bit longer in terms of design,  preparation and planning but site based  activities are taking up to 30%  less time and allowing homes to  reach the market sooner. Other  reasons cited include, in order of  preference:

  • Design Quality
  • Cost
  • Previous Experience
  • Funding

Source: Design and Modern Methods of  Construction. The Housing Corporation  and CABE 2004″

Bridge House (Example)

Croydon Vision 2020  is a regeneration programme by the  London Borough of Croydon  for the centre of  Croydon  in  South London.  The Old Town Masterplan focused on the area between the High Street and Roman Way, one of the oldest areas of Croydon.

Formerly the site of a telephone exchange, Bridge House is  a £20 million  development that has provided 27 private  and 48 affordable apartments, above  ground and mezzanine retail spaces.

The block wraps around an existing  multi-storey car park and offers the  opportunity for cafs and shops to  open onto the new square. A mix of  green and brown roofs, to support  biodiversity, form part of a series of  environmental measures and the  scheme is to be of modular  construction.

The Croydon  chose the modular  approach principally because of the  speed of construction offered. The  project began on site in the spring  of 2006 and the  75 flats were  stated to have been erected in  approximately 26 days, vastly  outperforming the time taken by  traditional construction.

Client: Howard Holdings plc

Architect: AWW

Structures: Walsh Associates

Principal Supplier: MC First

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

‘Creation From Catastrophe’ a New exhibition looks at how architects are doing more to prepare us for disaster – but is it enough?

Out of the ashes rises great opportunity. That is the theme of the new exhibit “Creation from Catastrophe — How Architecture Rebuilds Communities” at the Royal Institute of British Architects. Featuring a number of impressive projects dedicated to rebuilding communities after a disaster, the exhibit explores the evolving relationship between man, architecture, and nature.

In an interview with Dezeen magazine, curator Jes Fernie said the exhibit reveals an “expanded idea of what architecture is and what architects can do.”

From Floating Schools to Unseen Plans for an Alternative London, a New Exhibition Showcases the Good, the Bad and the Ugly Architectural Responses to Urban Disasters

The exhibit, which opened on Jan 27  and runs through April 24, spans nearly four centuries riddled with successful disaster relief projects. It features designs for rebuilding after London’s Great Fire in 1666 as well as plans for water communities in Nigeria, which could be affected by unpredictable coastal water levels in Africa’s near future.

Here are five other unique projects you can follow up on when visiting the Catastrophe exhibit this spring:

The Reliance Building
The Reliance Building

1. The Reliance Building, Atwood, Burnham and Co., North State Street, Chicago, 1890-1895
While devastating, Chicago’s Great Fire of 1871 paved a new way for architectural design. Considered by many to have birthed the Chicago School architectural style, the disaster also led to a new type of architectural design: the skyscraper.

In an effort to create fire-retardant buildings, designers utilized tools such as steel frames and sheet glass coverings. The Reliance Building, constructed by Atwood, Burnham, and Co, is one of the first post-fire buildings that fathered a design very similar to the modern day skyscrapers we know.

Nepal Project by Shigeru Ban Dezeen
Nepal Project by Shigeru Ban Dezeen

The Architect Bringing Cheap, Super-Light Disaster Shelters to Nepal
The Architect Bringing Cheap, Super-Light Disaster Shelters to Nepal

2. Housing for Nepal earthquake victims, Shigeru Ban, 2015
Simple, traditional homes in Nepal were the ones that withstood the catastrophic earthquake in 2015. As a result, Pritzker Prize-winning, disaster-relief architect Shigeru Ban designed housing structures for the victims.

Ban’s modular housing concept is modelled on the traditional homes that survived the earthquake. His design uses wood frames for the structure, cardboard tubes for the truss system of the roof, and debris from the disaster as infill for the wall. Thatch and plastic sheeting provided an extra layer of protection on the rooftop.

Women’s Centre in Darya Khan
Women’s Centre in Darya Khan

3. Women’s Centre in Darya Khan, Pakistan, Yasmeen Lari, 2011
Pakistani architect Yasmeen Lari (the first woman architect in Pakistan) showcases architecture’s role and influence in society. Throughout her career, the 75-year-old designer has built over 36,000 homes for earthquake and flood victims throughout Pakistan. She is also the founder of Heritage Foundation of Pakistan, which allows architecture students to train local residents to rebuild their homes and communities after a disaster using natural resources like bamboo and mud.

One of her well-known projects includes the Women’s Centre in Darya Khan, Pakistan. Lari holds a deep affection for Pakistani women, who are typically displaced and struggling with the care of their children following a natural disaster. The layout allows women to unite and socialize and keep their children safe. And in the event of a flood striking, the first floor is high enough so that waters cannot reach it.

Sustainable post-tsunami reconstruction master plan for Constitución
Sustainable post-tsunami reconstruction master plan for Constitución

4. Post-tsunami sustainability plan for Constitución, Chile, Elemental, 2014
After 2010’s deadly earthquake shook the coastal cities of Chile, plans for rebuilding and protecting cities like Constitución became a priority. In an effort to work with nature and the community, Pritzker Prize-winning architect Alejandro Aravena’s firm Elemental, proposed the intriguing method to plant more trees along the coast to absorb waters and prevent flooding.

The idea is that there is an opportunity to do something that would have long-term positive impacts, rather than a temporary fix that might be ruined by another major earthquake or tsunami in the area. The project will hopefully address short-term needs as well as potential long-term problems.

Ideas for rebuilding Hoboken, New Jersey after Hurricane Sandy.
Ideas for rebuilding Hoboken, New Jersey after Hurricane Sandy.

Resist. Delay. Store. Discharge. A Comprehensive Urban Water Strategy

Resist. Delay. Store. Discharge. A Comprehensive Urban Water Strategy
Resist. Delay. Store. Discharge. A Comprehensive Urban Water Strategy

5. Rebuilding of Hoboken, New Jersey after Hurricane Sandy, OMA, 2012
Following the disastrous Hurricane Sandy that struck the Northeastern United States in 2012, about 80 percent of Hoboken, New Jersey homes were flooded, leaving the community wondering how to rebuild itself with an emphasis on flood defense.

That’s when Dutch architect Rem Koolhaas’ firm OMA offered a solution that would combine hard infrastructure and soft landscaping, integrating coastal defense and natural drainage to protect against future flooding. The ideas between OMA’s and Elemental’s projects are very similar in that they look to work with nature rather than avoiding it.

Fernie told Dezeen that OMA offers a multi-pronged approach: resist, delay, restore and discharge. It acknowledges the complex water system and works with it, he said.

13 Basic Facts You Should Know about Modular Homes

The concept behind a tiny garden pavilion in London, UK was simplified by the following equation: shed + office = Shoffice.

Modular homes sometimes referred to as “factory-built construction“,  encompass a category of housing built in sections typically at a factory  location.   These houses must conform to local and regional building  codes for the country the buyer plans to situate the dwelling.  

Just like site-built housing, construction teams build modular homes to  last and increase in value over time.   As the factory finishes building sections of the house, each piece is transported to the homeowners build site on large truck beds.   Local building contractors then assemble the house and inspectors ensure the manufacturer has built your residence to code.   Most customers find that modular housing is less expensive than  site-built homes.

modularhomes7

1. Benefits of Construction

One of the benefits of  construction is that manufacturers build them indoors in an enclosed factory setting, where the materials  used to build the homes are not subject to adverse weather during construction.  

Most building contractors can finish erecting a house in as little as 1-2 weeks, though it may take up to 4 weeks or more for local  contractors to finish building the dwelling on-site once it has been  delivered.

modularhomes9

2. Differences Between Modular and Site Built

Modular homes are not the same as site-built homes, which contractors create 100% at the build site.   That means the
contractor must collect all the materials for a house and built it on-site.   Like a modular home, the site-built home must conform to all regional, state and local building codes.   Many refer to site-built construction as stick-built homes.   Stick built housing is also well-built and designed to last a lifetime.

modularhomes2

3. Difference Between Modular and Manufactured

modularhomes14
Manufactured housing is another form of factory construction.   Many  consumers have mistakenly referred to these homes in the past as mobile homes.   Others refer to manufactured homes as trailers.   Manufacturers do build these houses in a factory like modular homes on a steel chassis.  

The manufacturer then transports sections of the home to the building site as completed.   These dwellings are usually less expensive than both modular housing and site built housing, in part because they don’t come with a permanent foundation.   Trailers and mobile homes are more likely to depreciate than modular or site built homes.

4, Advantages of Modular Construction Over Site Built

Modular homes offer many advantages over traditional site built dwellings. Many consider modular homes a hybrid breed of housing.   Not a manufactured house and not a site built house, these homes offer consumers multiple benefits including costs savings, quality and convenience.   In many ways modular homes surpasses site built housing in quality and efficiency.  

Modulars have grown up. They are more and more becoming a mainstream  selection for first time and secondary homebuyers.   Most people now realise they don’t’ have to give up design quality or customization to buy a prefabricated house.   One of the biggest misconceptions people have of prefabricated housing is they are look alike.   “Boxy” is not a word that can begin to describe prefab dwellings. In fact, more suitable descriptions of these buidlings would include: “Elegant, durable, customised and high-class”.   Many people find they can afford to include more specialization and customization when they buy a factory built house over a traditional stick built construction.  

modularhomes41

5. Cutting-edge Designs

Looking for a building design with a little pizzazz?   You need to check out the latest architectural designs associated with prefabricated buildings.   Firms are now building more    elegant and unique designs to meet the increasing demands of selective customers.   People are selecting modular designs over stick built designs to build their dream homes.

green-prefab-homes-contemporary-ideas-on-home-design-ideas

6. Customised Design and Modification

There are hundreds of companies that offer modular prefabricated construction kits and plans, and most employ various architects and specialized designers to help customize your  home.   That means you have more choices and a wider selection of designers to choose from.   If you don’t find a style you like with one designer you can often move onto another, without even switching  manufacturers.  

green-prefab-homes-contemporary-ideas-on-home-design-ideas

7. Huge Range of Selection

Its always best to select a home that matches your lifestyle and design preferences.

8. Rapid Customisation  

These are often the ideal selection for homeowners in need of a speedily designed homes.   You simply can’t build a dwelling faster.   Site built housing can take months to design and build.   A manufacturer can design and place a prefab house in a few short weeks. You can pick from just as many different styles as you would a site built home if not more, but don’t have to wait weeks for contractors to build your custom house.

9. Precise Budgeting and Timing

Yet another benefit of these designs is the lack of guesswork involved.   You don’t have to worry about how something will look.   You know that everything will arrive to the build site complete and you will know the exact outcome. You also don’t need to worry about unexpected expenses, which is commonly the case with site built homes.   With a prefabricated house, you know exactly what your home will cost and can control that cost from the point of buying to final construction.   This isn’t the case with stick built housing. With stick built housing you also have to worry about surprises in the middle of construction.   It isn’t uncommon for example, for a contractor to quit in the middle of a project.   If this happens you have few choices.  

Your home will sit partially built until you are able to find a new construction team.   This alone may cost you valuable time and money.  

10. Improved Energy Efficiency    

Many prefab houses also come with what manufacturers call the “Energy Star” certification.   This is a national company that promotes energy efficiency.   Buildings with this label use 30-40 percent less energy yearly than traditional stick built housing.  

This saves you time and money.   Some key features of prefabricated housing that help improve energy efficiency include tight installation,  high performance and weather resistant windows, controlled air systems and duct systems, upgraded air-conditioning and heating units and use of efficient lighting and heating appliances.   As a bonus, these features not only save on annual energy costs but also improve the quality of your indoor air. Think energy efficiency isn’t significant?   Think again.   Over the lifetime of your house you could save thousands of pounds  in energy bills by buying a prefabricated dwelling.

11. Design Modification is Easier  

Most prefab homemakers now use computer aided design systems when conducting operations.   This adds to the efficiency of construction and improves the appearance and architecture  of homes.   Prefabricated construction ranges from plain vanilla styling to intricate and complex modern designs.

12. On Time and  on Budget    

Perhaps the two biggest features or benefits of prefabricated housing that manufacturers hone in on are the speed that  they can be built with and the competitive pricing they can offer on the final product.   This is one reason that modular homes are gaining popularity.  

13. Appreciate in Value

These dwellings also appreciate much like site  built housing designs.   Most homeowners are interested in building value in their house over time.   Prefab housing afford you the opportunity to do this (keep in mind however much appreciation is dependent on real estate location).   Select a good build site and your house will gain significant value over time. Other factors may also affect appreciation including landscaping and how well the house is cared for year after year.   These factors also affect site built housing.   Unlike mobile homes, which depreciate, a modular homeowner can expect to gain value from their home year after year. Study after study suggests that modular homes appreciate just as well as site built homes.   They are also just as easily insured and financed.

As far as risk goes, you are no more at risk buying prefabricated housing than site built construction.

Modular Home Facts

  • Modular homes appraise the same as their on-site built counterparts do.
  • Modular homes can be more easilly customised.
  • Most modular home companies have their own in-house engineering departments that utilize CAD (Computer Aided Design).
  • Modular home designs vary in style and size.
  • Modular homes are permanent structures – “real property.”
  • Modular homes are considered a form of “Green Building.”
  • Modular homes are faster to build than a 100% site-built home.
  • Home loans for modular are the same as if buying a 100% site-built home.
  • Insuring your modular home is the same as a 100% site-built home.
  • Modular homes can be built to withstand 175 mph winds.
  • Modular homes can be built for accessible living and designed for future conveniences.


Would you consider a modular home for yourself, or are you more of a traditionalist?

Pocket Living in London: Micro-flats Gain Favour as the Answer to Big City Urban Density

Young Londoners have revealed that they would rather rent a tiny studio flat than a large property in a less desirable area.

We Haven’t Reached the Density of Hong Kong. But We’re Heading That Way

London’s population is expected to reach 10m by 2031 from its current 8.3m. London needs an estimated 49,000 new homes a year. This is not a new phenomenon, architects have confronted population growth and social changes before.

Obvious solutions include rental and shared ownership, while community building is also gaining ground in the UK. But there are other solutions out there, adding to the bigger picture. One of these is Pocket Living  micro-flats, backed by Mayor Boris Johnson.

Micro-apartments Are in Vogue Today. But in Japan, People Have Been Living in the Nakagin Capsule Tower’s 100-square-foot Housing for Decades

Some 45% of 18-24-year-olds in London said they would consider living in  a micro-flat  if that was in the “perfect” location. A  micro-apartment, also known as a micro-flat, is a one-room, self-contained living space, usually purpose-built, designed to accommodate a sitting space, sleeping space, bathroom and kitchenette with a size of 4-10 square meters.

They are  essentially modern versions of the British bedsit and are becoming popular in urban centers in Europe, Japan, Hong Kong and North America, as  they represent a seemingly straightforward antidote to persistent affordable housing shortages in dense growing cities.

In fact, some micro-apartments are  being marketed as  cost-effective  fashionable lifestyle products.

Hogarth Architects transformed another large one-room flat in London into a stylish apartment using a wood insert that creates a separated kitchen and loft. It’s essentially one big piece of furniture custom-made for the space.
Large one-room flat in London

Hogarth Architects transformed another large one-room flat in London into a stylish apartment using a wood insert that creates a separated kitchen and loft. It’s essentially one big piece of furniture custom-made for the space.
Large one-room flat in London

Hogarth Architects transformed a large one-room flat in London into a stylish apartment using a wood insert that creates a separated kitchen and loft. It’s essentially one big piece of furniture custom-made for the space.

Micro-Apartments-Sloped-Roof-1

Micro-Apartments-Paris-Storage-2Curved  surfaces can make a small space even smaller. The ability to organise the rooms vertically is reduced. But Dutch architects Queeste Architecten have managed to give this 320-square-foot micro-flat a spacious feel using lots of white, with built-in furniture and storage.

Guide price  £8,000: the prototype of Ecodom's portable micro house is set to go to auction on 30 July
Guide price £8,000: the prototype of Ecodom’s portable micro house went to auction on 30 July

That oh-so-unfunny joke about moving into the garden shed is  now a reality for young Londoners.

The prototype of a portable  130sq ft  eco-friendly micro house that comes with a fold-down bed, kitchenette and shower room.

The micro houses, by Ecodom, will be constructed off-site and delivered fully made within two months of ordering, so it couldn’t be simpler to drop it into place and move straight in.

Oak Tube Apartment in Moscow
Oak Tube Apartment in Moscow

Architect Peter Kostelov turned a small flat  into a oak-lined tube. Kostelov removed all the walls from the center of the apartment and replaced them with glass so light could get from windows on one side to the balcony on the other.

Micro-Apartments-NYC-Loft-2

Specht Harpman Architects have turned a penthouse with a high ceiling into a two-level apartment and even managed to fit in a small grassy terrace.

Housing Complex in Slovenia is a Series of Honeycomb Modular Apartments
Honeycomb Modular Apartments

Housing Complex in Slovenia is a Series of Honeycomb Modular Apartments
Honeycomb Modular Apartments

Housing Complex in Slovenia is a Series of Honeycomb Modular Apartments

Japan’s famed Capsule Tower (and its scheduled demolition!), an iconic structure and unique archetype for contemporary prefab architecture. Designed by Kisho Kurokawa
Japan’s famed Capsule Tower

When it was built in 1972, architect Kisho Kurokawa’s Nakagin Capsule Tower was meant to be the housing structure of the future.  Now in 2013, his “masterpiece” stands dilapidated and virtually empty.

21 Rooms in One Creative Condo
21 Rooms in One Creative Condo

Now here’s a solution that could revolutionize tiny spaces  a  slide-out system that turns a 350-square-foot space into 21 different rooms with bed, washing machine, entertainment, a bath covered by the bed when not in use, shelves, cabinets and more.

Do you believe higher density housing  is the  answer to London’s housing crisis as some believe  or will it turn the city into Hong Kong and Shanghai?  

9 Suggestions for Overcoming Barriers to Good Design When Using Modern Methods of Construction (Mmc)

The term ‘Modern Methods of Construction’ (MMC)  embraces a range of technologies involving various forms  of prefabrication and off-site assembly.

MMC is increasingly regarded as a realistic means of  improving quality, reducing time spent on-site, improving  on-site safety and addressing skills shortages in the  construction of UK housing.

Bridge Crossing Modern Design
Bridge Crossing Modern Design

The variety of systems now available potentially allows the  designer enough choice to sidestep problems deriving  from constraints posed by the use of any one method.  MMC systems, from closed-panel timber framed  systems to bathroom pods are a palette from which  designers can make choices. They are not necessarily  stand-alone solutions that anticipate all the needs of  an individual site and can be mixed and matched  as appropriate.

These limitations are not obstacles to achieving the good design in MMC-based schemes, but may hinder  the incorporation of more complex and innovative  types of MMC from which greater overall benefits  may be obtained  which  are considered under the  following headings:

1. COST UNCERTAINTY

There is no doubt that, given products of comparable  performance the key issue in purchases of MMC construction  systems is the price. At present not enough is known  about the potential costs of using volumetric and  closed panel systems to enable confident specification  at an early date. This inhibits designers from exploring  the full potential of MMC systems. This is particularly true of the less repetitive,  small, one-off scheme, where a smaller margin  of benefits is gained from using MMC. The principal  barrier to the uptake of MMC, therefore, seems  to be the perception of cost uncertainty with respect to using more complex systems.  Without doing substantial project-specific research,  consultants and their clients simply do not know with  enough degree of certainty how much the volumetric or  closed panel systems are likely to cost, and what  would be the savings to overall project costs produced  by potential speed gains to offset against increased  capital expenditure.

This is due to the complexity of assessing the ratio of  cost of repetitive elements where pricing is relatively  straightforward to the cost of adjusting elements or  building in another method for the abnormal condition.  Decisions to use innovative systems are likely to be  made once designs are well progressed to enable  teams to be more certain of costs. This can increase  the potential for change or result in design compromise  as the designer attempts to incorporate the specific  limitations of a particular system in their design.

In an attempt to improve this situation, the MMC consultant and or clients  could  pull together a  directory of MMC  expanded to include cost comparison data. The huge  range of variables involved inevitably makes this  difficult, but a database of current construction cost  information  would be an  invaluable resource.

Contemporary Building Facade
Contemporary Building Facade

2. PLANNING PROCESS AND EARLY COMMITMENT  TO A SYSTEM

The time it can take to obtain planning permission has  obvious implications both for project cost but also, in  some circumstances, for architectural  design innovation.

Most of the more complex types of MMC have an  impact on dimensioning, the choice of external finish  and detailing may have some effect on the buildings  mass. Therefore,  the construction system should be  chosen prior to a planning application to avoid  abortive work, redesign or amendment, or even  resubmission for planning permission.

However,  developers  whose money is at risk, frequently hold  off deciding on the construction technique until the last  practicable moment, in order to get any advantage from  fluctuations in material or component pricing.

Given the potential for lengthy duration of planning  applications, this means that there is little incentive to  prepare initial designs for planning with a prior decision  to incorporate MMC firmly embedded. In cases where  the developer has a financial or business link with the  supplier, this is less likely to be the case. As the majority  of commercial or  residential developments involve some kind of arrangement with a developer, agreement on construction systems is often left to the stage after planning.

3. TIME INVESTMENT

Another very significant factor is the time investment required at  the early stages of projects. This is needed to develop the design when the project is still at risk. There is a  direct relationship between the scale and complexity of  MMC component and the amount of time required to  develop a design at an early stage.

The introduction of advanced or complex MMC  techniques into the design process is potentially costly  to the design team. A significant amount of research is  needed to explore alternative systems, to obtain  verification of suppliers’   credentials, investigate  mortgage and insurance issues, visit previous sites,  talk to system suppliers, obtain technical performance  guidelines, understand junctions and interfaces, coordinate  other consultants, obtain building control input  and so on.

For a consultant, the only way of investing in this  research is either through timely payment of increased  fees by a visionary understanding client or through the anticipation of increased future productivity through repetition when a  project is phased, or large enough, or likely to be  followed by another similar project.

The potential of learning a system and then being able  to repeat lessons learned efficiently is a powerful  incentive for both client and consultant. By contrast, HTA’ s project at Basingstoke is an example  of a phased project with a three to four-year duration allowed the design team to repeat  various elements of the design, and the manufacturer to  develop improved solutions to technical and supply  problems.

HTA’ s project at Basingstoke
HTA’ s project at Basingstoke

4. INSUFFICIENT COMMUNICATION

Improved dialogue at the outset of the  project is  vital if design quality is to be  maximised. Constraints and opportunities implicit within  a particular system are more easily incorporated into  design if partners communicate pre-planning.  Increased early communication can be fostered through  improved long-term partnering relationships.

Clients  should also partner with a range of suppliers and  architects so that choice and flexibility is not restricted.

5. INEXPERIENCE

Generally, the inexperienced client or design team will  have to do more research, with the result  that there is likely to be significant design development  without a specific system being incorporated.

This is a  disincentive to using a more complex system involving a  higher proportion of MMC, where early decision making  and knowledge of a system’ s capabilities have a decisive influence on the nature of the architecture.  However,  encouraging the take up  of MMC through the use of a dedicated funding mechanism may  assist clients  in  finding time for  research into suitable MMC techniques.

Dome Construction Berlin
Dome Construction Berlin

6. SUPPLIER’S ROLE

Site capacity  studies and early stage pre-planning design studies  could be undertaken directly by system suppliers  on behalf of clients, cutting out the usual procedure  of commissioning design work by independent  consultants.

7. ASSUMPTIONS

There are a  number of assumptions that  are generally held about certain types of MMC that may  have been valid at one time but are no longer true today.  There is a need for reliable and up to date information  comparing system criteria, performance data, timescales, lead in times, capacity, construction time,  sequencing issues, limitations, and benefits.

Therefore  it would be helpful if a forum  for discussion and experience exchange was set up.

8. DEMONSTRATING THE BENEFITS OF MMC

There is still a large amount of skepticism about the  need to go very far down the line with MMC. This is  reflected in the acceptance of the desirability of  maintaining or indeed enhancing the pool of traditional  craft skills throughout the UK.

A balanced view is that there is a demonstrable need  for the wider use of MMC which is recognized by both  industry and government.  The best way for clients  and the public generally to  become more confident and knowledgeable about the  quality of design achievable through MMC is to see it  demonstrated.

9. FINANCIAL INCENTIVES

There is no doubt that spreading the burden of  investment through the life of a project helps to ensure  a higher standard of specification and hence quality. In  the Netherlands, a ‘ Green Financing’   system has been  developed by the Dutch government that provides  favorable loan finance when certain sustainable  standards are reached. In the UK, the Gallions HA  has  pioneered  a study of this, based on a scheme in  Thamesmead, ‘ the Ecopark project’.

Eco Park is an eco-friendly business park built on the False Bay coast. This business park is at the cutting-edge of sustainable design and offers a unique working environment in a secure, well-managed facility.
Eco Park is an eco-friendly business park built on the False Bay coast. This business park is at the cutting-edge of sustainable design and offers a unique working environment in a secure, well-managed facility.

29 Awesome Quotes on Risk Management

29 Awesome Quotes on Risk Management
  1. If you treat risk management as a part-time job, you might soon find yourself looking for one ’- Deloitte white paper (Putting Risk in the Comfort Zone)
  2. I have learned that nothing is certain except for the need to have strong risk management, a lot of cash, the willingness to invest even when the future is unclear, and great people ’- Jeffrey R. Immelt
  3. Thoughtfully assessing and addressing enterprise risk and placing a high value on corporate transparency can protect the one thing we cannot afford to lose trust ’- Dale E. Jones, vice chairman and partner with Heidrick & Struggles
  4. We have no future because our present is to volatile. Will only have risk management ’- William Gibson
  5. Risk management is a culture, not a cult. It only works if everyone lives it, not if its practiced by a few high priests ’- Tom Wilson
  6. I think the rise of quantitative econometrics and a highly mathematical approach to risk management was the obverse of a decline in interest in financial history ’- Niall Ferguson
  7. There is no doubt that Formula 1 has the best risk management of any sport and any industry in the world ’- Jackie Stewart
  8. Stronger regulation and supervision aimed at problems with underwriting practices and lenders’ risk management would have been a more effective and surgical approach to constraining the housing bubble than a general increase in interest rates ’- Ben Bernanke
  9. If you don’t invest in risk management, it doesnt matter what business you’re in, it’s a risky business ’- Goldman Sachs president Gary Cohn
  10. Adventure without risk is Disneyland ’- Douglas Coupland
  11. Risk and time are opposite sides of the same coin, for if there were no tomorrow there would be no risk. Time transforms risk, and the nature of risk is shaped by the time horizon: the future is the playing field ’- Peter Bernstein, Against the Gods
  12. As population susceptibilities are better understood, we will be in a better position than we are in today to make informed decisions about risk management ’- Samuel Wilson
  13. Take calculated risks. That is quite different from being rash ’- General George Patton
  14. All courses of action are risky, so prudence is not in avoiding danger, but calculating risk and acting decisively ’- Niccolo Machiavelli
  15. Total enterprise risk management is critical, but implementing it is both expensive and easier said than done. Even the most sophisticated financial institutions are still basically silo risk managers ’- Danny Klinefelter, Professor and Extension Economist with Texas AgriLife Extension, Texas A&M University
  16. Playing it safe is the riskiest choice we can ever make ’- Sarah Ban
  17. The question of whether or to what extent human activities are causing global warming is not a matter of ideology, let alone of belief. The issue is simply one of risk management ’- Malcolm Turnbull
  18. Business people need to understand the psychology of risk more than the mathematics of risk  ’- Paul Gibbons,
  19. Risk comes from not knowing what your doing ’-Warren Buffett
  20. You have to take risks. You will only understand the miracle of life fully when we allow the unexpected to happen ’- Paulo Coelho
  21. Risk is a function of how poorly a strategy will perform if the ‘wrong’ scenario occurs ’- Michael Porter, Competitive Advantage
  22. Risk management should be an enterprisewide exercise and engrained in the business culture of the organisation ’- OSFI Superintendent Julie Dickson, June 1, 2011 (courtesy Ethidex)
  23. Risk is our business ’- Oswald Grübel, CEO at UBS
  24. When our leaders accept the status quo, we run the risk of disaster ’- Max Bazerman from “Predictable Surprises”
  25. The concept of ‘inherent risk’ is impossible to measure or even define. The idea of looking at risk absent all hard controls, soft controls, or mitigations, provides little or no useful information in most cases ’- Todd Perkins (from Journal of Applied Corporate Finance – volume 19 number 4)
  26. It’s important to take risks but it’s idiotic to take them blindly ’- Terry Levine
  27. Fail to identify the strategic risks and you fail as a business, no matter how well you manage your operational and project risks ’- Keith Baxter
  28. Business as usual is business at risk ’- Deloitte white paper
  29. Risk management is the identification, assessment, and prioritisation of risks ’- Wikipedia

Affordable City Living for Key Workers

In 2008 We Were Gripped by a Housing Panic. Now We’re Gripped by a Frenzy of Even Bigger Proportions

Firefighters, teachers, police officers and NHS staff in general. These are some of the professions which make up the loosely defined label Key Worker – first-time buyers with low paid public sector jobs. Such is the importance of retaining these staff in London’s jobs market, they are a growing target for new accommodation and financial packages to help them stay here. More than  300,000 key workers in London cannot afford to buy their own home: a first-time buyer in London pays about double the national average. Over 40% of working households cannot afford to purchase the lowest priced housing in their borough.

We Call Them City Makers  And Our Homes Are Designed  For Them

Pocket is a private developer that helps singles and couples on low to moderate incomes own a home of their own. Where appropriate, Pocket uses high-quality modular construction  techniques to minimise construction times, construction wastage and site disruption.

The Exciting Thing about Pocket Homes Is That They’re at Least.  20% Cheaper than the Surrounding Market Rate

Pocket’s development in Kentish Town is  based upon this approach. The site is a small urban block with frontages on both Weddington Road and Allcroft Road. The site was  in part vacant and blighted and in part occupied by a taxi repair workshop and barrow stores for the nearby market. The proposal was  for a mixed-use development comprising 22 units of affordable residential accommodation and 218sqm of commercial accommodation, which maintains the existing employment use on the site.

A Pocket flat in Weedington Road, Camden
A Pocket flat in Weedington Road, Camden

Pocket Living development Willingham Terrace, Camden
Pocket Living development Willingham Terrace, Camden

Pocket Living development Willingham Terrace, Camden
Pocket Living development Willingham Terrace, Camden

The scheme also incorporates an improved storage facility for barrows used by local market workers. Burrell Foley Fischer’s urban design response to a small, irregularly shaped site bordering a conservation area, has not been restricted through basing the design on modular construction techniques. The system offers the flexibility to make an appropriate contextual response.

Completion was achieved on programme in November 2008.

Client: Pocket

Architect: Burrell Foley Fischer LLP

Principal Supplier: Spaceover

The Golden Gate City’s out-of-control Housing Market: San Francisco Shack Just Sold for $1.2 million

The listed property at 16 De Long Street in San Francisco that sold for $1.2 million. Courtesy of Vanguard Properties

Long Way from Home: The Housing Crisis Lingers On “Distinguished home in need of work” as  listed with Vanguard Properties “Housing Special.” However, is this property a rich man’s dream or worst nightmare?

With rotting wooden shingles, peeling paint and boarded-up windows, this 1906 single-story home need’s a lot of work. But the price is what had people talking. The asking price was  $350,000, for 2 bedrooms, one bath, and a mere 765 square feet, about the size of a hotel suite.

The Golden Gate City’s out-of-control Housing Market

Located at 16 De Long Street in the more affordable Outer Mission district, the house price reflects  the out-of-control  real estate market in San Francisco. Since 2012, the city has seen a 103% increase in housing prices.  The average apartment in the city rents for $3,500 a month, and the median housing price reached an all-time high of $1.2 million and it’s expected to climb another 5.2% in the year ahead, according to Zillow. Manhattan rents in August, by comparison, topped $3,460, according to StreetEasy, a New York real-estate research firm that’s part of the Zillow Group Z, -2.95% .

The San Francisco Real-estate Market Is Probably the Hottest Market in the U.S Right Now

Not surprisingly, given the state of the actual building, the home’s value isn’t in the structure but in the land that it sits on.

Thinking of Moving to San Francisco to Make It Big in the Tech Industry

With the influx of tech workers driving up the housing market, along with a strain on the supply of houses to meet demand, it is understandable to brokers in San Francisco  why prices seem so unrealistic.

$1.2 Million Is What It Costs to Buy a Shack in San Francisco, Literally

The home is an earthquake shack. These tiny homes were built after the 1906 earthquake to house people who lost their residences. Many still remain around the city and have been restored, updated and refurbished.

According to a report from  Curbed San Francisco, the house had rats, black widows, mold, and hundreds of bottles of urine  inside it when it went up for sale and was subsequently  sold for $1.52  million.

The tiny home backs on to the eight-lane 280 freeway and a Bay Area Rapid Transit, or rail line that begins running at 5 a.m. and doesn’t stop until nearly 2.a.m.

On the flip side biking it to the local  station only takes eight minutes and getting on to the freeway isn’t difficult either, if you want to get out of town or into the city by car. Three golf clubs are also nearby.  And, for those late-night snacks, a convenience store stands just a few steps away at the corner of De Long and San Jose Avenue.

So maybe it wasn’t  such a bad deal, after all? or is it a sign  of how crazy the San Francisco real estate market has become?

Michael Lewis, writing for The New Republic, describes the negative effect of wealth on the moral behavior of wealthy people. He cites studies in which wealthy people, again and again, demonstrate a sense of entitlement and disregard for justice.

“As the recession lifted, poor and middle class Americans dug deeper into their wallets to give to charity, even though they were earning less. At the same time, according to a newChronicle analysis of tax data, wealthy Americans earned more, but the portion of the income they gave to charity declined.”

So rich people, statistically speaking, demonstrate disregard for their fellow citizens and the laws of the land. None of this should come as a surprise for Christians. Jesus warned of the dangers of wealth (Matthew 13:22) and of course Paul warns in 1Timothy, “the love of money is the root of all evil.” And yet solving the problem of extreme wealth in America is not so easy as spouting Bible verses. And for wealthy Christians, the solution to the problems of extreme wealth comes from entrusting that wealth to the Lord to the benefit of all.

Prefab Comeback

Prefab  housing suffers from bad stigma due to the fact that some people saw the prefabs as ugly and characterless, and were afraid they would become slums – hardly the promised housing fit for heroes  following the second World War. However, building homes from pre-made parts can save time and money.  The term prefab or prefabrication often evokes thoughts of poor construction, substandard living conditions and a long-standing “temporary” solution.

Prefab dwellings are making a comeback driven by a lack of affordable housing, a rapidly growing economy and changing demographic trends.  

Methods Methods of Construction (Mmc) Offer Significant Potential to Minimise Construction Costs

The term ‘Modern Methods of Construction‘ refers to a collection of relatively new building construction techniques that aim to offer more advantages over traditional construction methods. Off-site construction (OSC) is a modern method of construction, based on off-site manufacturing of building elements.

With exponentially lower construction costs, quicker construction, reduced  labor costs and having the ability to achieve zero defects, MMC is gaining a lot of attention as the  potential answer to the UK’s housing crisis.

In a valiant attempt to strip away prefabricated housings’ bad rep are MMC with contemporary sleek designs, and constructed to withstand the test of time. MMC housing has the capability to deliver both quality and quantity housing to the tune of ‘ £50,000 per unit.

MMC units hold the promise of being extremely  energy efficient and environmentally sustainable. Many versions of MMC take into account how to utilise natural resources and reduce each unit’s carbon footprint. In addition, MMC also addresses environmental concerns by creating much less waste than a standard brick-and-mortar project. While it is plausible that a traditional build could hire a waste removal company who would have the ability to recycle up to 90 percent of the construction waste; with MMC projects, this will automatically happen.

M-house (pronounced “mouse
M-house (pronounced “mouse”)

There have already been a number of successful examples of MMC housing constructed in various parts of the United Kingdom. The M-house (pronounced “mouse”) is designed and constructed to last an upwards of 100 years. While Architect Alford Hall have created quality MMC apartment buildings proudly showcasing a patio and private entrance for each flat.

Architect Alford Hall
Architect Alford Hall

Compass House by AHMM
Compass House by AHMM

While many of the MMC homes  are still in their early years the upkeep and maintenance will be reduced by 50%  since the OSC  process lowers the risk of non-conformities.

MMC homes are being fabricated and designed to accommodate many different lifestyles, such as, two-story homes, tall six-story apartment buildings, single-family homes and log cabins are all available options for families looking at MMC.

While there is a plethora of design options available all MMC  OSC  projects have a common theme. The internal workings of the homes are fabricated off-site, while only the “outer skin” comes to fruition on-site. To even further streamline the process, it has been suggested that having a “catalog of pre-selected materials increases supplier relationships and makes the design process more streamlined.”

With the small sample available with progressive MMC systems, it is currently reasonable to conclude that using modern methods of construction to build homes can cost more than traditional home building procedures; due to the need for specialised MMC design consultants. However, outside of costs, MMC remains a faster home building method than traditional brick and block house building and is slowly  becoming a relevant front-runner to answer the  UK’s housing shortage.

Professional Consultancy Responds to Health and Social Care Challenges

As people in the UK live longer, demand for residential care and nursing homes is growing, as are our expectations of the standard of living they will provide.  Dean Jones  offers insights about the value a professional consultancy has for overcoming the challenge and driving value for patients.

The current state of affairs

As a result of some well-broadcasted care scandals that attracted extensive, and in some cases, damaging media attention, the government has responded with cuts that are impacting local authority (LA) fees and resulting in far tougher  Care Quality Commission (CQC)  policies.

Office for National Statistics (ONS)  Projects That by 2035 There Will Be 3.5 Million Uk Residents Aged 85 and Older, Compared to Only 1.4 Million Currently

In spite of this, the “extra-care” – or Residential Elderly Care (REC) sector – continues to overcome these challenges, attracting new investments, particularly into new-build care homes. These are specially designed, owner-occupied, self-contained housing, often with round-the-clock support and meals and sometimes with nursing assistance.

A typical pattern is for owner-founded care home operators to reach a growth limit, based on the founder’s management capacity, access to capital and appetite for risk. They cease to invest in new capacity and don’t benefit from economies of scale which can be passed on to commissioners. Public markets typically do not fulfil their function as a supplier of capital in the case of healthcare services, because they generally demand relatively modest gearing.

There’s a widely recognised need across all health and social care market segments for innovation and system change, as well as capital investment in new services. A private equity investor is well placed to leverage technical services to strategically programme and project-manage Residential Elderly Care (REC)  public real estate schemes across their entire lifecycle.

Supply and demand challenges

Today, professional healthcare businesses and registered social landlords (RSLs) are the main providers of new capacity, period. Since 2008, private and voluntary status providers, who service 92 percent of all Residential Elderly Care, have reported an upswing in demand and occupancy. Paradoxically, as adult social care budgets are decreasing and the provision of residential care by the  NHS  and local authorities has shrunk, the number of UK people who require help and support is rapidly increasing.

The Increasingly Ageing Population of the Uk Appears to Be Underpinning the Overall Rise in Rec Capacity and Occupancy

While Local Authorities (Las) are seeking to divert placements to inexpensive non-residential/domiciliary-based alternatives, the increasingly ageing population of the UK appears to be underpinning the overall rise in REC capacity and occupancy. Britons are living longer than ever. The  Office for National Statistics (ONS)  projects that by 2035 there will be 3.5 million UK residents aged 85 and older, compared to only 1.4 million currently. The cost of caring for these residents is also forecasted to increase. For example, caring for a person with dementia will increase to $1,142,677 by 2025 and $2,092,945 by 2051. In total the government estimates that 1.7 million more adults will require some type of care and support over the coming decades.

As a result, the current number of nursing and residential care homes in the UK (over 381,000) will need to almost double over the next 20 years to cope with rising numbers of people aged 85 or more.

dependent-100342

A bright future?

The demand for care will continue to rise as a result of life expectancy increasing and ageing. A robust REC independent sector arises primarily from the net increase in residential demand, and more recently, improved occupancy. These are the result of a number of competing forces:

  • Demographics, with the ageing population expected to drive the demand for health and social care.
  • Outsourcing, the long-term transfer of residents from LA homes to independent care homes.
  • Severe financial constraints, at least over the next five years, as the government – which pays for the bulk of health, social care and special education – seeks to eradicate the public expenditure deficit and restrict new builds.
  • Outdated assets, or older care homes that no longer meet needs.
  • Consolidation, a trend within segments of the independent sector.
  • Maturity, against a currently immature healthcare market.
  • Efficiency, highlighted by the “Nicholson challenge” for the NHS to make £15 to £20 billion in efficiency savings between 2011 and 2014. (It costs the NHS approximately £3,000 a week to care for elderly patients with no clinical need to be in a hospital ward. By contrast, it comes to about £1,000 per week for a residential care home provider.)
  • Demand and Occupancy. Unless the supply of new builds increases (currently by approx. 7,500 beds p.a.), it’s possible that some regions may see bed shortages, driving up LA fees.
  • New Technology. Progressive management capabilities in leveraging technology and strategic collaboration will constitute the formula for success and sustainability in the new healthcare business environment.

While a longer life is welcome news for millions of Britons, it could ironically trigger a public service meltdown as our national health system is stretched to its breaking point. Local authorities and NHS trusts retain a significant role in delivering services, with 75 percent of nursing home places funded by the public sector. There exist ever-increasing opportunities for private care providers to take some of the strain from NHS and ease bed-blocking by caring for patients, mostly elderly, in a residential setting when there is no clinical need to be in a hospital ward.

The REC Sector Could Potentially save the Nhs Billions of Pounds.

A combined approach to health and social care and some innovation is required for this savings to become a reality. In addition, Care Home Operators have a unique opportunity to grow their businesses and benefit from economies of scale, leveraging the expertise and resources of a professional consultancy. In doing so, they’ll have necessary resources and systems to bid for significant re-provision of services tendered by local authorities.

About Dean Jones

Dean is an Associate in AECOM’s Programme Leadership Practice. Dean joined AECOM from Care UK, the UK’s largest independent provider of health and social care, where he was a Programme Manager and delivered a £250m investment growth programme over 2012/15 which increased Care Uk’s number of homes circa 33%. Dean was also Programme Manager for a £60m Suffolk programme to build ten new care homes and ten day clubs, bringing much needed additional nursing and specialist dementia care to the Suffolk community.

Momo Apartments

MoMo apartments

MoMo apartments

MoMo apartments
MoMo apartments  –  Architect,  Allford Hall Monaghan Morris LLP

Zero defects are the primary battleground  between traditional and modern  construction methods. A relative  concept, zero defects is, however, a  target that the construction industry  has set for itself. Primary  considerations are structural stability  and keeping the water out. Proper  functioning of services, components,  fixtures, and fittings are essential.

Energy and sound performance are  also vital, as well as issues of safety,  access, and security. This is a  campaign which will be fought in  years to come… and in the meantime  here is another prefab  scheme  which feature’s in these  skirmishes.

Mobile Modular (MoMo) is a  research development project for a  relocatable system of mass housing  constructed from specially fabricated  shipping containers. This type of  system allows flats to be erected  speedily on short-life sites and to be  demounted and re-assembled in  different configurations on other sites  in the future.

The key objectives:

Remove MoMo apartments from a  site where housing has been provided  for 5 years.

Refurbish Each module at the  supplier’s yard or an alternative  temporary site.

Re-locate The apartments in any  new configuration to provide  decanting, short-term housing,  permanent apartments. This type of  system can also become a  permanent housing solution.

Originally commissioned by the  Peabody Trust, after feasibility stage, the team was invited to take the  project forward with their own  initiative. The team formed a  consortium with the aim of developing  a prototype to  demonstrate  the principles, and to market the  MoMo scheme as a one-stop shop  package to interested parties.

Modular Penthouse, New Inn Yard, Shoreditch

A  modern approach  to prefabrication  is flourishing in the  capital with a new generation of designers and  manufacturers building on the pioneering work of  organisations such as the Peabody Trust.  City apartments lend themselves well to factory  built components where the quality of construction  needs to compensate for higher densities and  restricted space for accommodation.

Offsite construction is also less disruptive in the  city environment with increased construction speeds  bringing a corresponding reduction in noise and  transport and material handling in the  neighbourhood.

It is evident that many designers are also promoting the modular unit not only as a way of producing  affordable housing but also as a fashionable lifestyle  product.

No more connotations of the stigmatised post-war  temporary housing; the prefab is now an aspirational  dwelling which is becoming increasingly desirable.

3D-modelling has also opened up mny possibilities for housing construction. The software and expertise now exists to construct houses and apartments as a virtual model before any construction work begins. It is therefore possible to join up the process of construction starting with the purchaser/occupier who make choices of layout, fittings and furnishings from the computer visualisation. Data from the virtual model then becomes specification and fabrication data which is passed to the factory and eventually delivered to site.

Modular Penthouse, New Inn Yard, Shoreditch High Street

Modular Penthouse, New Inn Yard, Shoreditch High Street
Modular Penthouse, New Inn Yard, Shoreditch High Street

Modular Penthouse, New Inn Yard, Shoreditch High Street
Modular Penthouse, New Inn Yard, Shoreditch High Street

Modular Penthouse, New Inn Yard, Shoreditch High Street
Modular Penthouse, New Inn Yard, Shoreditch High Street

Material efficiency and ease of construction were  prime functional objectives. The Shoreditch Penthouse project explored the possibilities of inserting structures into a dense urban fabric by re-using roof tops of existing buildings. Four prefabricated volumetric units provide for various functions; they interlock on site to generate an integral live/work space in conjunction with the existing floor below. Starting with the simple idea of maximising capacity through optimisation of the existing structure, they integrate new spaces whilst sharing foundations, services and circulation areas. Core principles of sustainable construction can therefore be applied from the very beginning. Finally, through off-site construction expensive site management can be kept to a minimum, whilst maintaining a high quality of craftsmanship in a controlled factory environment.

Architect: Oceans Group

Structural Engineer: Atelier One

 

As seen on