Axelos CEO Peter Hepworth in the Spotlight

Project Journal had the privilege of interviewing AXELOS previous CEO Peter Hepworth. Peter provided us with an insight into his role and AXELOS as a whole in October 2015.

AXELOS CEO Peter Hepworth

Peter joined AEXLOS as CEO in July 2013 and was previously Managing Director for Activision Blizzard  a $400 million turnover and $150million EBIT business.   In 2014, Activision Blizzard was the fifth largest gaming company in the world by revenue.

Peter is an economics graduate, chartered accountant, with an M.B.A. from Cranfield and A.M.P. from INSEAD.

What is AXELOS?

AXELOS is a joint venture set up in 2014 by the Government of the United Kingdom and Capita, to develop, manage and operate qualifications in best practice, in methodologies formerly owned by the Office of Government Commerce (OGC).

AXELOS promotes best practice frameworks such as PRINCE2 and ITIL and is developing a cyber resilience best practice portfolio later in 2015.

How does  AXELOS  differ from APM?

AXELOS is an independent organisation, allowing the user community to focus more on the content of frameworks and guidance without much interference. The firm puts a heavy focus on the guidance given, ensuring the content is fuelled by good ideas to keep the ITIL structure up to date. But while the business has a combination of access to one of Britain’s largest corporations and the UK government, more than 75% of publication sales and Prince2 certification is sold outside of the UK, a trend that is growing faster due to emerging markets.

The company varies its training approach. Its Portfolio, Programme, and Project Management Maturity Model (P3M3), for example, encourages users to assess their performance against benchmarks. Mike Acaster, PPM portfolio manager, says: “PRINCE2 is applicable to many sizes of organisation, but sometimes it’s better to be a bit more specific. It’s about tailoring advice for that context. In some cases it has been tailored, and people don’t realise it’s PRINCE2 – you have to scratch the surface.

How do you view the future of project management?

After years of being associated with large engineering and construction projects, project management has moved beyond infrastructure. Firms across different countries and sectors now acknowledge the need to manage their processes and keep costs and timing under control. As businesses begin to recognise the importance of project management worldwide, questions are being asked about the standards required. AXELOS is focusing on how these can apply to different staff and situations, as well as how workers can develop a career path in project management.

Is AXELOS popular aboard?

“It’s hard to measure the adoption of our products, but if you look at the number of exams taken, you can see strong growth outside the UK, as well as in the UK,” he says. “In the US there’s a lot of interest, and the biggest international user of PRINCE2 is the UN, to make sure their aid development is correctly managed.

“Our Managing Successful Programmes (MSP) product was used to deliver the Olympic Games. I was in Tokyo after they had won the right to host Tokyo 2020 and the focus was ‘When can we have MSP?’ They want to see the same success as London has had.”

What are  the future priorities for AXELOS?

“Career path. For the individual, it’s about how your career can develop. There’s a different skill set between project and portfolio management, and no linear route. It comes to modularisation. We have been able to offer different dimensions.

Cyber Resilience is next. Companies need to put more emphasis on improving their reactions to cyber attacks rather than continuing to focus on prevent. Although there are a number of standards and best practices in place to prevent cyber attacks, firms are still falling foul, and this is usually due to the internal attitude and people, rather than technology.

New products launched in 2015 include PRINCE2 Agile; Cyber Resilience Best Practice and Continuing Professional Development (CPD).

What’s next?

Young people are learning things online and changing how it is done. We want our members to feel proud about having AXELOS qualifications and have launched digital badges so that project professionals can display their mark of professionalism across popular social networks.

Digital badges are tokens that appear as icons and are awarded to signify learning achievements in a way that can be easily verified and shared online. Our members digital badge’s will hold and display information about their professional development activity as well as the issue date and an expiry date.

Individual workers, organisations and entire industries can benefit from badges. Badges are a new form of currency – a more transparent and efficient way to communicate the acquisition and development of workplace skills.

From AXELOS to Microsoft, IBM to Oracle, many leading companies have adopted digital badges as a form of recognition for continuing professional development and certifications. The individuals who earn these badges enthusiastically share them to LinkedIn, Twitter, Facebook and other online destinations. Once shared, anyone can verify the authenticity of and learn more about the individual’s abilities. That shareability and verification can make all the difference in a competitive job market, whether an individual aspires to move ahead in her current position or move into a different job.

We also want continued openness from AXELOS, even more community collaboration and specific actions to further increase the relevance of AXELOS in the future.

Where do you believe project management is heading?

Anyone can benefit from project management guidance. “We are all project managers now,” he says.

 

Top 10 Project Management Myths Debunked

Since the dawn of time, mankind has used myths to make sense of the uncertainty that surrounds us.  In the early 1990s  a lot of  people believed that project management was the best kept secret in business.  However,  because project management was not  seen as a  prevailing profession at that time, it suffered from a lack of awareness  which was  in a sense, a double edged sword. Those who were knowledgeable in the practice of project management became extreamly valuable to organisations and pioneers for  the profession.

These early adopters were able to convince organisations that project management practitioners were needed.  Myths around project management began to form in the business community  and as the role of the  project manager was unclear, questions were raised as to what project management was  and what it could offer organisations.

The definition of the word myth is a “widely held, but false belief or idea.” Here, we’re going to examine 10 of the most pervasive PM myths that have emerged.

Myth #1 – Contingency pool is  redundant  

This is one of the most ‘mythical’ myths that has plagued the industry  for a long time. Coupled  with the tendency to presume that ‘real work’ is tantamount to implementation or building something concrete and you have the perfect recipe for project disaster.  The thought pattern behind this approach typically originates from budget constraints and/or having unrealistic expectations. As we all know, or should know, the unexpected happens quite regularly. An effective contingency plan is important as it aims to protect that which has value (e.g., data), prevent or minimise disruption (e.g., product lifecycle), and provide post-event feedback for analysis (e.g., how did we fare? did we allocate funds correctly?).

Myth #2 – Project Management software is too expensive

If your idea of project management software involves purchasing servers, and purchasing a software application from a major vendor for a small practice with 10  practitioners  then, yes, it  is too expensive. If, however, you have gone cloud and elected to use a powerful web-based project management solution (such as Smartsheet), then you are likely to save thousands of pounds while reaping the benefits of a pay-as-you-go price structure. The present, and future, lie in cloud solutions that provide equal, or superior, functionality at a fraction of the cost.

Myth #3 – Project Management methodologies will slow us down

Project  managers  have  a reputation of using  process-intensive  methodologies  that favour ideology over pragmatism. In some instances this may, indeed, be the case when  there is a mismatch between a specific project management approach and the organisation’s acutall needs (e.g., a process-driven method, such as PRINCE2, may not be appropriate for a slightly chaotic environment that favours an adaptive approach, such as Scrum). So, in sum, put down the paint roller (“Project Management isn’t for us!”) and take out your fine-bristled brush (“The Critical-Chain method may not be our cup of tea, but Agile on the other hand”¦”).

Myth #4 – Facts and figures are more important than feelings and perceptions

While facts are very important, projects are often derailed and sabotaged because of false perceptions.  The PM must pay attention to both fact and fiction to navigate through turbulent  organisational change.

Myth #5 – Project managers need to be detail oriented and not strategic in nature

While it is of the utmost importance for the project manager to understand how to read the details of the project, they must also understand how the project supports organisational objectives.  Having a strategic perspective adds great value to the skill-set of the project manager.

Myth #6  Rely on the experts in everything that you do

It is true, we do need to rely on the experts but our trust can not be a blind faith.  The job of the project managers in this area is twofold.  First we must extract information and second we must verify that the information is accurate.  A good example of this is asking a planner  to provide an estimate on the effort required to perform a task.  In some instances team members forget to include tasks which ultimately results in a faulty estimate.

Myth #7  All the battles have to be fought and won so that we can succeed

Project managers sometimes make the assumption that they need to stand firm to get the job done, however, coming to compromise  on a particular issue is often a better course of action  in order to  win the war.

Myth #8 Project Managers  can wear multiple hats  

Wearing different hats can be extremely confusing.  This is especially true if the project manager is asked to be a business analyst or technical expert on top of serving in their PM role.  They end up doing  both roles with mediocrity.  When we “wear two hats” we essentially tell ourselves that both hats fit on one head at the same time. However, what happens if the demands of two roles conflict  and what assurances do we have that we’re managing the inherent conflict of multiple roles  and the  risks the  roles introduce? Sadly, multiple roles become more common as we move up the management hierarchy in an organisation, and that’s exactly where potential conflicts of interest can do the most harm.

Myth #9  Once the risk register is created, it’s full speed ahead

Risk management provides a forward-looking radar. We can use it to scan the uncertain future to reveal things that could affect us, giving us sufficient time to prepare in advance. We can develop contingency plans even for so-called uncontrollable risks, and be ready to deal with likely threats or significant opportunities.  Too often, it’s not until a catastrophic event occurs and significantly impacts project progress that ongoing risk reviews are conducted.

Myth #10 Project managers can not be effective in their role unless they have specific technical expertise in the given field that the project falls  within

You don’t need to be an engineer to manage a construction project or a IT  technician to manage a software development project.  All you need is a  fundamental  understanding with strong PM skills to manage  the team.  Experience in the field helps but does not guarantee success.

Project management is challenging enough without the myths. The profession has come a long way since the 1990s and some of these myths are fading. However, we still see remnants of them in one form or another.  Great projects cut through false assumptions and confusion, allowing their teams to make smart decisions based on reality.

These are just 10 project management myths, what are yours?  

13 Basic Facts You Should Know about Modular Homes

The concept behind a tiny garden pavilion in London, UK was simplified by the following equation: shed + office = Shoffice.

Modular homes sometimes referred to as “factory-built construction“,  encompass a category of housing built in sections typically at a factory  location.   These houses must conform to local and regional building  codes for the country the buyer plans to situate the dwelling.  

Just like site-built housing, construction teams build modular homes to  last and increase in value over time.   As the factory finishes building sections of the house, each piece is transported to the homeowners build site on large truck beds.   Local building contractors then assemble the house and inspectors ensure the manufacturer has built your residence to code.   Most customers find that modular housing is less expensive than  site-built homes.

modularhomes7

1. Benefits of Construction

One of the benefits of  construction is that manufacturers build them indoors in an enclosed factory setting, where the materials  used to build the homes are not subject to adverse weather during construction.  

Most building contractors can finish erecting a house in as little as 1-2 weeks, though it may take up to 4 weeks or more for local  contractors to finish building the dwelling on-site once it has been  delivered.

modularhomes9

2. Differences Between Modular and Site Built

Modular homes are not the same as site-built homes, which contractors create 100% at the build site.   That means the
contractor must collect all the materials for a house and built it on-site.   Like a modular home, the site-built home must conform to all regional, state and local building codes.   Many refer to site-built construction as stick-built homes.   Stick built housing is also well-built and designed to last a lifetime.

modularhomes2

3. Difference Between Modular and Manufactured

modularhomes14
Manufactured housing is another form of factory construction.   Many  consumers have mistakenly referred to these homes in the past as mobile homes.   Others refer to manufactured homes as trailers.   Manufacturers do build these houses in a factory like modular homes on a steel chassis.  

The manufacturer then transports sections of the home to the building site as completed.   These dwellings are usually less expensive than both modular housing and site built housing, in part because they don’t come with a permanent foundation.   Trailers and mobile homes are more likely to depreciate than modular or site built homes.

4, Advantages of Modular Construction Over Site Built

Modular homes offer many advantages over traditional site built dwellings. Many consider modular homes a hybrid breed of housing.   Not a manufactured house and not a site built house, these homes offer consumers multiple benefits including costs savings, quality and convenience.   In many ways modular homes surpasses site built housing in quality and efficiency.  

Modulars have grown up. They are more and more becoming a mainstream  selection for first time and secondary homebuyers.   Most people now realise they don’t’ have to give up design quality or customization to buy a prefabricated house.   One of the biggest misconceptions people have of prefabricated housing is they are look alike.   “Boxy” is not a word that can begin to describe prefab dwellings. In fact, more suitable descriptions of these buidlings would include: “Elegant, durable, customised and high-class”.   Many people find they can afford to include more specialization and customization when they buy a factory built house over a traditional stick built construction.  

modularhomes41

5. Cutting-edge Designs

Looking for a building design with a little pizzazz?   You need to check out the latest architectural designs associated with prefabricated buildings.   Firms are now building more    elegant and unique designs to meet the increasing demands of selective customers.   People are selecting modular designs over stick built designs to build their dream homes.

green-prefab-homes-contemporary-ideas-on-home-design-ideas

6. Customised Design and Modification

There are hundreds of companies that offer modular prefabricated construction kits and plans, and most employ various architects and specialized designers to help customize your  home.   That means you have more choices and a wider selection of designers to choose from.   If you don’t find a style you like with one designer you can often move onto another, without even switching  manufacturers.  

green-prefab-homes-contemporary-ideas-on-home-design-ideas

7. Huge Range of Selection

Its always best to select a home that matches your lifestyle and design preferences.

8. Rapid Customisation  

These are often the ideal selection for homeowners in need of a speedily designed homes.   You simply can’t build a dwelling faster.   Site built housing can take months to design and build.   A manufacturer can design and place a prefab house in a few short weeks. You can pick from just as many different styles as you would a site built home if not more, but don’t have to wait weeks for contractors to build your custom house.

9. Precise Budgeting and Timing

Yet another benefit of these designs is the lack of guesswork involved.   You don’t have to worry about how something will look.   You know that everything will arrive to the build site complete and you will know the exact outcome. You also don’t need to worry about unexpected expenses, which is commonly the case with site built homes.   With a prefabricated house, you know exactly what your home will cost and can control that cost from the point of buying to final construction.   This isn’t the case with stick built housing. With stick built housing you also have to worry about surprises in the middle of construction.   It isn’t uncommon for example, for a contractor to quit in the middle of a project.   If this happens you have few choices.  

Your home will sit partially built until you are able to find a new construction team.   This alone may cost you valuable time and money.  

10. Improved Energy Efficiency    

Many prefab houses also come with what manufacturers call the “Energy Star” certification.   This is a national company that promotes energy efficiency.   Buildings with this label use 30-40 percent less energy yearly than traditional stick built housing.  

This saves you time and money.   Some key features of prefabricated housing that help improve energy efficiency include tight installation,  high performance and weather resistant windows, controlled air systems and duct systems, upgraded air-conditioning and heating units and use of efficient lighting and heating appliances.   As a bonus, these features not only save on annual energy costs but also improve the quality of your indoor air. Think energy efficiency isn’t significant?   Think again.   Over the lifetime of your house you could save thousands of pounds  in energy bills by buying a prefabricated dwelling.

11. Design Modification is Easier  

Most prefab homemakers now use computer aided design systems when conducting operations.   This adds to the efficiency of construction and improves the appearance and architecture  of homes.   Prefabricated construction ranges from plain vanilla styling to intricate and complex modern designs.

12. On Time and  on Budget    

Perhaps the two biggest features or benefits of prefabricated housing that manufacturers hone in on are the speed that  they can be built with and the competitive pricing they can offer on the final product.   This is one reason that modular homes are gaining popularity.  

13. Appreciate in Value

These dwellings also appreciate much like site  built housing designs.   Most homeowners are interested in building value in their house over time.   Prefab housing afford you the opportunity to do this (keep in mind however much appreciation is dependent on real estate location).   Select a good build site and your house will gain significant value over time. Other factors may also affect appreciation including landscaping and how well the house is cared for year after year.   These factors also affect site built housing.   Unlike mobile homes, which depreciate, a modular homeowner can expect to gain value from their home year after year. Study after study suggests that modular homes appreciate just as well as site built homes.   They are also just as easily insured and financed.

As far as risk goes, you are no more at risk buying prefabricated housing than site built construction.

Modular Home Facts

  • Modular homes appraise the same as their on-site built counterparts do.
  • Modular homes can be more easilly customised.
  • Most modular home companies have their own in-house engineering departments that utilize CAD (Computer Aided Design).
  • Modular home designs vary in style and size.
  • Modular homes are permanent structures – “real property.”
  • Modular homes are considered a form of “Green Building.”
  • Modular homes are faster to build than a 100% site-built home.
  • Home loans for modular are the same as if buying a 100% site-built home.
  • Insuring your modular home is the same as a 100% site-built home.
  • Modular homes can be built to withstand 175 mph winds.
  • Modular homes can be built for accessible living and designed for future conveniences.


Would you consider a modular home for yourself, or are you more of a traditionalist?

10 Motivational Quotes to Get You Through Your Procurement Woes

10 Motivational Quotes to Get You Through Your Procurement Woes

Is your procurement project stuck in a rut?  

A well crafted quote, very much like good storytelling  and  can elucidate fuzzy concepts. For example, creativity” and “innovation” are not the first two words that come to mind when talking about procurement. However, According to Deloitte’s paper Charting the Course, this is where procurement’s destiny lies.

By transforming beyond today’s definition of “procurement as the sourcing of raw materials, and goods and services,” procurement can  reach new heights.

Here are 10  quotes to help you find motivation and inspiration to make a positive change.

  1. All models are wrong but some of them are useful – George Box (Statistician)
  2. People will forget what you said, people will forget what you did. But people will never forget how you made them feel – Maya Angelou (Writer)
  3. We cannot solve our problems with the same thinking we used when we created them – Albert Einstein
  4. Opportunity arises for the prepared mind – Louis Pasteur (chemist and microbiologist)
  5. A journey of a thousand miles begins with a single step – Lao Tzu (Philosopher)
  6. What gets measured, gets managed – Peter Drucker
  7. Leonardo da Vinci’s Simplicity is the ultimate sophistication –  Dale Dauten
  8. Worrying does not empty tomorrow of its troubles, it empties today of its strength – Corrie ten Boom
  9. The best way to predict the future is to invent it – Alan Kay
  10. Strive not to be a success, but rather to be of value – Albert Einstein

What are some of your favorite inspirational quotes? Share in the comments

9 Suggestions for Overcoming Barriers to Good Design When Using Modern Methods of Construction (Mmc)

The term ‘Modern Methods of Construction’ (MMC)  embraces a range of technologies involving various forms  of prefabrication and off-site assembly.

MMC is increasingly regarded as a realistic means of  improving quality, reducing time spent on-site, improving  on-site safety and addressing skills shortages in the  construction of UK housing.

Bridge Crossing Modern Design
Bridge Crossing Modern Design

The variety of systems now available potentially allows the  designer enough choice to sidestep problems deriving  from constraints posed by the use of any one method.  MMC systems, from closed-panel timber framed  systems to bathroom pods are a palette from which  designers can make choices. They are not necessarily  stand-alone solutions that anticipate all the needs of  an individual site and can be mixed and matched  as appropriate.

These limitations are not obstacles to achieving the good design in MMC-based schemes, but may hinder  the incorporation of more complex and innovative  types of MMC from which greater overall benefits  may be obtained  which  are considered under the  following headings:

1. COST UNCERTAINTY

There is no doubt that, given products of comparable  performance the key issue in purchases of MMC construction  systems is the price. At present not enough is known  about the potential costs of using volumetric and  closed panel systems to enable confident specification  at an early date. This inhibits designers from exploring  the full potential of MMC systems. This is particularly true of the less repetitive,  small, one-off scheme, where a smaller margin  of benefits is gained from using MMC. The principal  barrier to the uptake of MMC, therefore, seems  to be the perception of cost uncertainty with respect to using more complex systems.  Without doing substantial project-specific research,  consultants and their clients simply do not know with  enough degree of certainty how much the volumetric or  closed panel systems are likely to cost, and what  would be the savings to overall project costs produced  by potential speed gains to offset against increased  capital expenditure.

This is due to the complexity of assessing the ratio of  cost of repetitive elements where pricing is relatively  straightforward to the cost of adjusting elements or  building in another method for the abnormal condition.  Decisions to use innovative systems are likely to be  made once designs are well progressed to enable  teams to be more certain of costs. This can increase  the potential for change or result in design compromise  as the designer attempts to incorporate the specific  limitations of a particular system in their design.

In an attempt to improve this situation, the MMC consultant and or clients  could  pull together a  directory of MMC  expanded to include cost comparison data. The huge  range of variables involved inevitably makes this  difficult, but a database of current construction cost  information  would be an  invaluable resource.

Contemporary Building Facade
Contemporary Building Facade

2. PLANNING PROCESS AND EARLY COMMITMENT  TO A SYSTEM

The time it can take to obtain planning permission has  obvious implications both for project cost but also, in  some circumstances, for architectural  design innovation.

Most of the more complex types of MMC have an  impact on dimensioning, the choice of external finish  and detailing may have some effect on the buildings  mass. Therefore,  the construction system should be  chosen prior to a planning application to avoid  abortive work, redesign or amendment, or even  resubmission for planning permission.

However,  developers  whose money is at risk, frequently hold  off deciding on the construction technique until the last  practicable moment, in order to get any advantage from  fluctuations in material or component pricing.

Given the potential for lengthy duration of planning  applications, this means that there is little incentive to  prepare initial designs for planning with a prior decision  to incorporate MMC firmly embedded. In cases where  the developer has a financial or business link with the  supplier, this is less likely to be the case. As the majority  of commercial or  residential developments involve some kind of arrangement with a developer, agreement on construction systems is often left to the stage after planning.

3. TIME INVESTMENT

Another very significant factor is the time investment required at  the early stages of projects. This is needed to develop the design when the project is still at risk. There is a  direct relationship between the scale and complexity of  MMC component and the amount of time required to  develop a design at an early stage.

The introduction of advanced or complex MMC  techniques into the design process is potentially costly  to the design team. A significant amount of research is  needed to explore alternative systems, to obtain  verification of suppliers’   credentials, investigate  mortgage and insurance issues, visit previous sites,  talk to system suppliers, obtain technical performance  guidelines, understand junctions and interfaces, coordinate  other consultants, obtain building control input  and so on.

For a consultant, the only way of investing in this  research is either through timely payment of increased  fees by a visionary understanding client or through the anticipation of increased future productivity through repetition when a  project is phased, or large enough, or likely to be  followed by another similar project.

The potential of learning a system and then being able  to repeat lessons learned efficiently is a powerful  incentive for both client and consultant. By contrast, HTA’ s project at Basingstoke is an example  of a phased project with a three to four-year duration allowed the design team to repeat  various elements of the design, and the manufacturer to  develop improved solutions to technical and supply  problems.

HTA’ s project at Basingstoke
HTA’ s project at Basingstoke

4. INSUFFICIENT COMMUNICATION

Improved dialogue at the outset of the  project is  vital if design quality is to be  maximised. Constraints and opportunities implicit within  a particular system are more easily incorporated into  design if partners communicate pre-planning.  Increased early communication can be fostered through  improved long-term partnering relationships.

Clients  should also partner with a range of suppliers and  architects so that choice and flexibility is not restricted.

5. INEXPERIENCE

Generally, the inexperienced client or design team will  have to do more research, with the result  that there is likely to be significant design development  without a specific system being incorporated.

This is a  disincentive to using a more complex system involving a  higher proportion of MMC, where early decision making  and knowledge of a system’ s capabilities have a decisive influence on the nature of the architecture.  However,  encouraging the take up  of MMC through the use of a dedicated funding mechanism may  assist clients  in  finding time for  research into suitable MMC techniques.

Dome Construction Berlin
Dome Construction Berlin

6. SUPPLIER’S ROLE

Site capacity  studies and early stage pre-planning design studies  could be undertaken directly by system suppliers  on behalf of clients, cutting out the usual procedure  of commissioning design work by independent  consultants.

7. ASSUMPTIONS

There are a  number of assumptions that  are generally held about certain types of MMC that may  have been valid at one time but are no longer true today.  There is a need for reliable and up to date information  comparing system criteria, performance data, timescales, lead in times, capacity, construction time,  sequencing issues, limitations, and benefits.

Therefore  it would be helpful if a forum  for discussion and experience exchange was set up.

8. DEMONSTRATING THE BENEFITS OF MMC

There is still a large amount of skepticism about the  need to go very far down the line with MMC. This is  reflected in the acceptance of the desirability of  maintaining or indeed enhancing the pool of traditional  craft skills throughout the UK.

A balanced view is that there is a demonstrable need  for the wider use of MMC which is recognized by both  industry and government.  The best way for clients  and the public generally to  become more confident and knowledgeable about the  quality of design achievable through MMC is to see it  demonstrated.

9. FINANCIAL INCENTIVES

There is no doubt that spreading the burden of  investment through the life of a project helps to ensure  a higher standard of specification and hence quality. In  the Netherlands, a ‘ Green Financing’   system has been  developed by the Dutch government that provides  favorable loan finance when certain sustainable  standards are reached. In the UK, the Gallions HA  has  pioneered  a study of this, based on a scheme in  Thamesmead, ‘ the Ecopark project’.

Eco Park is an eco-friendly business park built on the False Bay coast. This business park is at the cutting-edge of sustainable design and offers a unique working environment in a secure, well-managed facility.
Eco Park is an eco-friendly business park built on the False Bay coast. This business park is at the cutting-edge of sustainable design and offers a unique working environment in a secure, well-managed facility.

The Hard Side of Change Management

Change management is an approach to transition individuals, teams, and organisations to a desired future state. For over three decades, academics, managers, and consultants, realising that transforming organisations is difficult, have avoided  the subject.

My Way or the Highway

Major organisational change is profoundly difficult because the structure, culture, and routines of companies  often reflect’s persistent and difficult-to-remove ways of working, which are resistant to radical change even as the environment of  organisations change.

What started out as a financial buzzword in the early nineties  has become fundamental business practice, with executives recognising the need to keep abreast  with the competition in a rapidly developing corporate new world.

Navigating  change

Globalisation and the constant innovation of technology result in a constantly evolving business environment. There is an ever-increasing need for Change Management Lead’s / Senior Managers who can help organisations successfully navigate change in today’s business environments. The focus of this movement to date has been on how to  partner with organisations to define education, training and communication platforms that help to support the change initiatives and concerns of company employees. The critical aspect is a company’s ability to win the buy-in of their organisation’s employees on the change initiative.

While a project team is important for success, a senior level advisor is invaluable and can work  with an organisations  leadership team to avoid common pitfalls that change management projects often fall into. There are four key areas where an Advisor should act as this resource as follows:

1. Defining A  Strategy  

Executives should start by asking themselves  what exactly needs  changing and why? Organisational change directly affects all departments from entry level employees to senior management and  must be aligned to a  companies  strategy. Too many programs are heavy on the jargon and light on the substance.  Executives are often sold on an idea only to realise as the change initiative begins that they need a different outcome, tool or process to be successful.

In this situation the strategy for change needs to be re-aligned with the organisation and its goals.

An outside senior advisor with a unique perspective of the organisation will  play an important role in helping an executive to explore and shape the strategy they are defining and highlight whether it will truly create the outcomes they desire. This upfront partnership can save money  on the back end of a project, by avoiding costly re-scoping of initiatives.This relationship  between senior advisor and executive should therefore begin as early as possible in the process.

2. Coalition Building

Its important to give  people multiple opportunities to share concerns, ask questions, and offer ideas  and to make following up with answers and updates a top priority.  Executives must reach out across their functional work streams to build a large cohesive team to support the project once the correct strategy has been set and the urgency for the project has been established. A good senior advisor will be able to guide an executive though these interactions.

As a senior change management professional, it is important that you help leaders of the organisation craft the correct message. While leaders often know what it is they want and see the urgency for themselves, the outside view that a coach provides can support the development of a team around the initiative and  help to navigate the strategic and political interests in linking the change to the interest of multiple team members.

The more people are involved in the process, the fewer will  be acting as internal saboteurs.

Communication Is Key to Successful Change Management

3. Communication

Don’t confuse process visioning, planning and endless powerpoint presentations with communication.  

Change is uncomfortable, and adapting to change is messy. A  Gantt chart can not capture  the  hard side of  change management. Why? Because tasks are easy to list, but behaviour and long-held habits are not easy to change. Gather outside information, solicit perspectives, and adapt the approaches for your organisation and group.

The importance of communication within an organisation around the change cannot be underestimated.     Executives often fall short on communication in two main  areas, not communicating the right message and not communicating it frequently enough across an  organisation. It is often thought that everyone else in the organisation is on board and understands the change, however, the  reality for an executive  is not the reality for another worker who may have lost a job because of a well intended change initiative.  A senior advisor can apply consistent pressure to the leader of the change around the need for communication and its messaging.

Quantity Is Fine, but Quality and Consistency Are Crucial

4. Share  Relevant  Information Quickly

Most CEOs and managers are quoted as saying, “You can’t communicate too much,” Part of the communication will be the support the urgency in messaging.     “My way or the highway”  is often used, but is not an effective communication strategy.     Senior Advisors can work with executives to tailor their message to each area of the organisation in order to define content that is important to them.

A study by  Towers Watson  shows that “only two-thirds (68%) of senior managers say they are getting the message about the reasons behind major organisational decisions. Below the senior management level, the message dwindles further  to  (53%) of middle managers and 40% of first-line supervisors understanding  reasons behind major organisational  change.

The forwarding and cascading of information does not work as  consistent communication around the change will be necessary at all levels of the organisation using a variety of communication pathways and vehicles.  As a trusted advisor it is important to encourage executives to lead by example in both their messaging and communication of the change  agenda.

Only 25% of Change Management Initiatives Are Successful over the Long Term

Maintaining The Change

Many leaders and managers underestimate the length of time required by a change cycle. It is paramount  that as the  change effort reaches its completion that  leaders of the change recognise that the process does not end there.   The role of a Senior Advisor will be to guide them to the idea that work must be undertaken  to maintain the change over time. Maintaining change does not mean that an executive must own the initiative  forever, just that they take the necessary steps to ensure that change has a lasting impact by integrating the change into the corporate culture and measuring the benefits  and highlighting areas for future improvements.

The outside unbiased view is  that a Change Management Lead is crucial to the success of a change management program.

This article  provides food for thought rather than counsel specifically designed to meet the needs of your organisation or situation.  Please use it mindfully.

29 Awesome Quotes on Risk Management

29 Awesome Quotes on Risk Management
  1. If you treat risk management as a part-time job, you might soon find yourself looking for one ’- Deloitte white paper (Putting Risk in the Comfort Zone)
  2. I have learned that nothing is certain except for the need to have strong risk management, a lot of cash, the willingness to invest even when the future is unclear, and great people ’- Jeffrey R. Immelt
  3. Thoughtfully assessing and addressing enterprise risk and placing a high value on corporate transparency can protect the one thing we cannot afford to lose trust ’- Dale E. Jones, vice chairman and partner with Heidrick & Struggles
  4. We have no future because our present is to volatile. Will only have risk management ’- William Gibson
  5. Risk management is a culture, not a cult. It only works if everyone lives it, not if its practiced by a few high priests ’- Tom Wilson
  6. I think the rise of quantitative econometrics and a highly mathematical approach to risk management was the obverse of a decline in interest in financial history ’- Niall Ferguson
  7. There is no doubt that Formula 1 has the best risk management of any sport and any industry in the world ’- Jackie Stewart
  8. Stronger regulation and supervision aimed at problems with underwriting practices and lenders’ risk management would have been a more effective and surgical approach to constraining the housing bubble than a general increase in interest rates ’- Ben Bernanke
  9. If you don’t invest in risk management, it doesnt matter what business you’re in, it’s a risky business ’- Goldman Sachs president Gary Cohn
  10. Adventure without risk is Disneyland ’- Douglas Coupland
  11. Risk and time are opposite sides of the same coin, for if there were no tomorrow there would be no risk. Time transforms risk, and the nature of risk is shaped by the time horizon: the future is the playing field ’- Peter Bernstein, Against the Gods
  12. As population susceptibilities are better understood, we will be in a better position than we are in today to make informed decisions about risk management ’- Samuel Wilson
  13. Take calculated risks. That is quite different from being rash ’- General George Patton
  14. All courses of action are risky, so prudence is not in avoiding danger, but calculating risk and acting decisively ’- Niccolo Machiavelli
  15. Total enterprise risk management is critical, but implementing it is both expensive and easier said than done. Even the most sophisticated financial institutions are still basically silo risk managers ’- Danny Klinefelter, Professor and Extension Economist with Texas AgriLife Extension, Texas A&M University
  16. Playing it safe is the riskiest choice we can ever make ’- Sarah Ban
  17. The question of whether or to what extent human activities are causing global warming is not a matter of ideology, let alone of belief. The issue is simply one of risk management ’- Malcolm Turnbull
  18. Business people need to understand the psychology of risk more than the mathematics of risk  ’- Paul Gibbons,
  19. Risk comes from not knowing what your doing ’-Warren Buffett
  20. You have to take risks. You will only understand the miracle of life fully when we allow the unexpected to happen ’- Paulo Coelho
  21. Risk is a function of how poorly a strategy will perform if the ‘wrong’ scenario occurs ’- Michael Porter, Competitive Advantage
  22. Risk management should be an enterprisewide exercise and engrained in the business culture of the organisation ’- OSFI Superintendent Julie Dickson, June 1, 2011 (courtesy Ethidex)
  23. Risk is our business ’- Oswald Grübel, CEO at UBS
  24. When our leaders accept the status quo, we run the risk of disaster ’- Max Bazerman from “Predictable Surprises”
  25. The concept of ‘inherent risk’ is impossible to measure or even define. The idea of looking at risk absent all hard controls, soft controls, or mitigations, provides little or no useful information in most cases ’- Todd Perkins (from Journal of Applied Corporate Finance – volume 19 number 4)
  26. It’s important to take risks but it’s idiotic to take them blindly ’- Terry Levine
  27. Fail to identify the strategic risks and you fail as a business, no matter how well you manage your operational and project risks ’- Keith Baxter
  28. Business as usual is business at risk ’- Deloitte white paper
  29. Risk management is the identification, assessment, and prioritisation of risks ’- Wikipedia

34 Thought Provoking Change Management Quotes

Change is good. It’s also often hard. The status quo can be so much more comfortable. But to succeed in business, you must run toward change.  Companies most likely to be successful in making change work to their advantage are the ones that no longer view change as a discrete event to be managed, but as a constant opportunity to evolve the business

Here are 34 thought provoking change management quotes:

  1. It is not the strongest or the most intelligent who will survive but those who can best manage change —  Charles Darwin
  2. One key to successful leadership is continuous personal change. Personal change is a reflection of our inner growth and empowerment — Robert E. Quinn
  3. Change before you have to — Jack Welch
  4. You must embrace change before change erases you.
    — Rob Liano
  5. Change before you have to — Jack Welch
  6. Too few leaders have the emotional fortitude to take responsibility for failure.
    — Paul Gibbons, The Science of Successful Organisational Change: How Leaders Set Strategy, Change Behaviour, and Create an Agile Culture
  7. People don’t resist change. They resist being changed! — Peter Senge
  8. If you want to make enemies, try to change something — Woodrow Wilson
  9. The key to change is to let go of fear — Rosanne Cash
  10. The world hates change, yet it is the only thing that has brought progress — Charles Kettering
  11. There is nothing more difficult to take in hand, more perilous to conduct, or more uncertain in its success, than to take the lead in the introduction of a new order of things — Niccolo Machiavelli
  12. Change is the law of life and those who look only to the past or present are certain to miss the future — John F. Kennedy
  13. Even those who fancy themselves the most progressive will fight against other kinds of progress, for each of us is convinced that our way is the best way.
    — Louis L’Amour
  14. Whosoever desires constant success must change his conduct with the times — Niccolo Machiavelli
  15. Your success in life isn’t based on your ability to simply change. It is based on your ability to change faster than your competition, customers and business — Mark Sanborn
  16. Change your thoughts and you change your world — Norman Vincent Peale
  17. If you don’t like change, you will like irrelevance even less —  General Eric Shinseki (U.S. Army Chief of Staff, 1999-2003)
  18. We now accept the fact that learning is a lifelong process of keeping abreast of change. And the most pressing task is to teach people how to learn — Peter Drucker
  19. Whosoever desires constant success must change his conduct with the times
  20. — Niccolo Machiavelli
  21. All is connected, no one thing can change by itself
    — Paul Hawken
  22. Learn to adjust yourself to the conditions you have to endure, but make a point of trying to alter or correct conditions so that they are most favorable to you — William Frederick Book
  23. We would rather be ruined than change
  24. We would rather die in our dread than climb the cross of the moment  and let our illusions die  — W. H. Auden
  25. Every generation needs a new revolution  — Thomas Jefferson
  26. Never doubt that a small group of thoughtful, concerned citizens can change the world. Indeed it is the only thing that ever has  — Margaret Mead
  27. I’ll go anywhere as long as it’s forward  — David Livingstone
  28. Life isn’t about finding yourself. Life is about creating yourself  — George Bernard Shaw
  29. Adaptability is about the powerful difference between adapting to cope and adapting to win— Max McKeown
  30. You can’t build an adaptable organization without adaptable people–and individuals change only when they have to, or when they want to — Gary Hamel
  31. People will try to tell you that all the great opportunities have been snapped up. In reality, the world changes every second, blowing new opportunities in all directions, including yours — Ken Hakuta
  32. A wise man adapts himself to circumstances, as water shapes itself to the vessel that contains it — Chinese Proverb
  33. The price of doing the same old thing is far higher than the price of change — Bill Clinton
  34. Each of us has the opportunity to change and grow until our very last breath. Happy creating — M.F. Ryan

Change or die? we  choose life! How about you?  

Playing God: Swedish Train operator uses Big Data to ‘avoid train delays that haven’t happened yet’

In a sign of things to come, a Swedish train operator is using new technology that employs big data to predict the entire commuter train system two hours into the future.

Welcome to the world of “Big Data.” We have more information at our fingertips than any generation in history. We live in the world of “Big Data.” That is the new way people are trying to describe this sea of digital facts, figures, products, books, music, video, and much more. Twitter, apps, Facebook–they’re each giving science new ways to look at what people do and why.

“Hopes, fears, and ethical concerns relating to technology are as old as technology itself.”

We actually welcome some aspect of Big Data. These mysterious data successes (or accidental successes) are easy to see as a kind of Big Brother future, where technology can track your every move and report back to ”¦ someone. However, StockholmstÃ¥g, the train operator is using new technology that employs big data to predict train delays before they happen.

“The Commuter Prognosis –  A Social Scientist’s Dream Come True.”

The mathematic algorithm, called “The commuter prognosis” was  developed in Stockholm, Sweden.

When a train is not on time the algorithm forecasts disruptions in the entire network by using historic big data  to  prevent the ripple effects that actually causes most delays.
Wilhelm Landerholm the mathematician who has developed the algorithm said:

“We have built a prediction model, using big data, that lets us visualize the entire commuter train system two hours into the future. We can now forecast disruptions in our service and our traffic control center can prevent the ripple effects that actually cause most delays.”

The algorithm has been tested but is not currently being  used by traffic controllers.

How  does it work?

The key to the model is a large  amount of historical data. The model works similar to a seismograph, an instrument that measures and records details of earthquakes, such as force and duration, but instead identifies late train arrivals. When this happens, the system  uses historical data from previous occurrences to forecast the likely  impact on the entire train network.

Real-time public transportation information is already used around the globe, however, traffic control centers still typically assess  delays manually to try and prevent further problems in a network. The commuter prognosis system, on the other hand, will forecast these delay effects instantaneously  and provide a prediction of how a single or multiple  disturbance might  affect  the whole  train network. The  commuter prognosis system could change how traffic control centers operate all over the world.

“The Effects of One Delayed Train Can Quickly Multiply Within a Train Network”

Imagine that “The commuter prognosis” forecasts that a train will be 10 minutes late to station C in two hours. To deal with this the traffic control center issues a new train from station A that will arrive on time at station C. As soon as the new train has been put in motion the algorithm re-calculates and gives the traffic control center a new forecast for the entire train network within minutes.”

The most important benefit of “The commuter prognosis” is that it  provides for a more punctual public transportation.

“The commuter prognosis” will be available in a smartphone app based on the original model. The app will integrate with other transportation big data to make commuting easier and  will indicate which coaches are more or less crowded.

Big Data, Ethics, and Religion

These stories remind us that even though companies and governments are doing amazing things with data, it’s at best imperfect. The algorithms and programs they use to filter and respond to data are at least as fallible as the human beings who designed them.  We can also see its complexity and failures as evidence of the amazing omnipotence of our God – who doesn’t make errors and who knows right where to find us, even inside a great fish or the depths of hell.

The arrival of big data has already brought with it numerous questions that have yet to be properly addressed. These questions are methodological, epistemological, and ethical, and they concern (inter alia) the ways in which data is collected, stored, interpreted, represented, and traded.  A further complication is a speed with which data science is advancing, which means that (for example) the application of legal and ethical restrictions to the practice of that science will always risk being several steps behind the point that it has currently reached. There are indications that we are currently sleepwalking towards a situation in which the commercial exploitation of big data routinely increases social division, and renders privacy a thing of the past.

Ket factors

  • A mathematical model interprets big data to forecasts for each train in the train network.
  • The commuter prognosis can warn about delays two hours before the departure or arrival actually takes place.
  • The commuter prognosis calculates how the delay affects other trains in the system.
  • The purpose of “the commuter prognosis” is to make life easier for traffic control centers and to give passengers  a better service.
  • In the future, the algorithm will be potentially adaptable for more types of public transportations and cities.

43 Great Quotes To Inspire You To Be a Better Christian Leader

Anyone who has responsibility for the work of others understands the unique challenges that come with managing people.

Over the years, various thought leaders have come up with pearls of wisdom in the form of quotations that when given some thought, have a lot to teach us.  Sometimes a simple quote is just the thing to lift our spirits, to make us smile or to give us the energy to keep going when we’re feeling low.

Here are 43 such quotes to make us better Christian leaders.

  1. “The Christian leader of the future is called to be completely irrelevant and to stand in this world with nothing to offer but his or her own vulnerable self.” –  Unknown
  2. “In most cases being a good boss means hiring talented people and then getting out of their way.” –  Unknown
  3. “The good news is, God has provided us with a LifeBook to help us – the Bible.” –  Unknown
  4. “Encouragement is the oxygen of the soul.” –  John Maxwell
  5. “There’s only two things you can start without a plan: a riot and a family, for everything else you need a plan.” –  Unknown
  6. “Rejection is an opportunity for your selection.” –  Unknown
  7. “People don’t care how much you know until they know how much you care.” –  John Maxwell
  8. “Leadership is getting people to work for you when they are not obligated.” –  Fred Price
  9. “Running a project without a work breakdown structure is like going to a strange land without a roadmap” – J Phillips
  10. “You don’t have to hold a position in order to be a leader.” –  Henry Ford”
  11. “Have a good plan, Execute it violently, Do it today” – General Douglas McArthur
  12. “The single biggest problem in communication is the illusion that is has taken place.” –  Unknown
  13. “To improve is to change; to be perfect is to change often.”  –  Winston Churchill
  14. “A project without a critical path is like a ship without a rudder.” – D. Meyer
  15. “If your actions inspire others to dream more, learn more, do more and become more, you are a leader.” – John Quincy Adams
  16. “What’s measured improves.” –  Unknown
  17. “A goal without a plan is just a wish.” –  Antoine de Saint Exupry 1900-1944, French writer and aviator
  18. “If it is not documented, it doesn’t exist. As long as information is retained in someone’s head, it is vulnerable to loss.” –  Unknown
  19. “It must be considered that there is nothing more difficult to carry out nor more doubtful of success nor more dangerous to handle than to initiate a new order of things.”  –  Machiavelli 1446-1507, Italian statesman and philosopher
  20.  “No one can whistle a symphony. It takes a whole orchestra.” –  Unknown
  21. “Luck is for the ill-prepared.” –  Unknown
  22. “Tell me and I’ll forget, show me and I may remember, involve me and I’ll understand.”  –  Chinese Proverb
  23. “Of all the things I’ve done, the most vital is  coordinating the talents  of those who work for us and pointing them towards a certain goal.” –Unknown
  24. “PMs are the most creative pros in the world; we have to figure out everything that could go wrong before it does.” – Fredrik Haren
  25. “Why do so many professionals say they are project managing when what they are actually doing is firefighting?” –Unknown
  26. “The first responsibility of a leader is to define reality. The last is to say thank you. In between, the leader is a servant.”  –Unknown
  27. “Ensure your documentation is short and sharp and make much more use of people-to-people communication.” –Unknown
  28. “Quality means doing it right when no one is looking.” –  Henry Ford
  29. “Leadership offers an opportunity to make a difference in someone’s life, no matter what the project.” –  Bill Owens
  30. “Leaders must be close enough to relate to others, but far enough ahead to motivate them.” –  John C. Maxwell
  31. “Leaders have two characteristics: first they are going somewhere, and second they are able to persuade other people to go with them.” –  John Maxwell
  32. “The key to successful leadership today is influence, not authority.” – Kenneth Blanchard
  33. “The manager asks how and when; the leader asks what and why.” – Warren Bennis
  34. “The best example of leadership is leadership by example.” –  Jerry McClain
  35. If your actions inspire others to dream more, learn more, do more and become more, you are a leader.” –  John Quincy Adams
  36. “The authority by which the Christian leader leads is not power but love, not force but example, not coercion but reasoned persuasion. Leaders have power, but power is safe only in the hands of those who humble themselves to serve.” –  John Stott
  37. “We can be tired, weary and emotionally distraught, but after spending time alone with God, we find that He injects into our bodies energy, power and strength.” –  Charles F. Stanley
  38. “Jesus said, “For even the Son of Man came not to be served but to serve others and to give his life as a ransom for many.” –  Mark 10:45
  39. “We are all faced with a series of great opportunities brilliantly disguised as impossible situations.” –Unknown
  40. “Be faithful in small things because it is in them that your strength lies.” –  Mother Teresa
  41. “The greater your knowledge of the goodness and grace of God on your life, the more likely you are to praise Him in the storm.” –  Matt Chandler
  42. “Continuous effort  – not strength or intelligence — is the key to unlocking our potential” –  Winston Churchill
  43. “God is most glorified in us when we are most satisfied in Him.” –  John Piper

If you know a great quote or scripture that will inspire others to lead their churches better, please feel free to share it in the comments below.

Momo Apartments

MoMo apartments

MoMo apartments

MoMo apartments
MoMo apartments  –  Architect,  Allford Hall Monaghan Morris LLP

Zero defects are the primary battleground  between traditional and modern  construction methods. A relative  concept, zero defects is, however, a  target that the construction industry  has set for itself. Primary  considerations are structural stability  and keeping the water out. Proper  functioning of services, components,  fixtures, and fittings are essential.

Energy and sound performance are  also vital, as well as issues of safety,  access, and security. This is a  campaign which will be fought in  years to come… and in the meantime  here is another prefab  scheme  which feature’s in these  skirmishes.

Mobile Modular (MoMo) is a  research development project for a  relocatable system of mass housing  constructed from specially fabricated  shipping containers. This type of  system allows flats to be erected  speedily on short-life sites and to be  demounted and re-assembled in  different configurations on other sites  in the future.

The key objectives:

Remove MoMo apartments from a  site where housing has been provided  for 5 years.

Refurbish Each module at the  supplier’s yard or an alternative  temporary site.

Re-locate The apartments in any  new configuration to provide  decanting, short-term housing,  permanent apartments. This type of  system can also become a  permanent housing solution.

Originally commissioned by the  Peabody Trust, after feasibility stage, the team was invited to take the  project forward with their own  initiative. The team formed a  consortium with the aim of developing  a prototype to  demonstrate  the principles, and to market the  MoMo scheme as a one-stop shop  package to interested parties.

 

As seen on