They often say that a baby is like a blank canvas, ready to be painted with life’s experiences. However, this canvas isn’t entirely blank, as certain factors like illnesses can be passed down from generation to generation. Nevertheless, the idea that a baby is a vessel waiting to be shaped remains compelling.
If we consider this notion, it leads to intriguing reflections on the story of Jesus. When Jesus, the divine being, laid down his divinity and became a baby, it can be seen as a form of symbolic death. The Jesus who presumably had a distinct personality ceased to exist in the same way, and he was then raised in a human context. His character would have been influenced by his surroundings, but with a unique twist – his development wasn’t solely shaped by humanity, but also guided by God.
What makes this story extraordinary is that Jesus wasn’t influenced by mere mortals but by the divine. Additionally, he would have been taught by angels, adding another layer to the shaping of his character. It’s plausible to imagine that his character, while shaped by the human experience, carried a divine essence that set it apart.
As the narrative goes, when Jesus, after his human life, was restored to his full divine power, it’s mysterious to ponder what it felt like when all the knowledge and experiences from his previous existence came flooding back. This enigmatic transformation and combination gives rise to the concept of the creation of a “God-man” – someone who has now experienced both the limitations of humanity and the boundless power of divinity. How awesome, how wonderful and what a sacrifice.
In essence, Jesus underwent a symbolic death twice – first by laying down his divinity to become human and then by returning to his divine form after his human death. This profound journey is often viewed as the creation of a bridge between the divine and humanity, connecting two realms in a way that transcends ordinary understanding.
Albinism is the “congenital absence of any pigmentation or coloration in a person, animal or plant, resulting in white hair, feathers, scales and skin and pink eyes in mammals, birds, reptiles, amphibians and fish and other small invertebrates as well.”Varied use and interpretation of the terms mean that written reports of albinistic animals can be difficult to verify.
For ages, Judith had a feeling that she would struggle to become pregnant. There wasn’t a medical explanation for this — it was simply a niggling fear.
She and her husband struggled to believe they would ever become parents after years went by without her becoming pregnant. “I found myself getting anxious and desperate,” Judith first wrote on Love What Matters.
“The fear remained no matter how hard I tried to stay positive. However, Eight years down the line, my husband and I decided to go for our second round of IVF. The first of which failed, as well as other various procedures and fertility treatments. Every ultrasound visit after that was horror”
Judith
The couple could hardly contain their joy when that second round of IVF proved successful.
Judith was carrying twins — a boy, Kamis, and a girl, Kachi.
It felt remarkable that after all these years, their aspirations and dreams of a family were about to be real.
However, mum’s joy quickly turned to horror as doctors broke the news that Kachi was “at risk and might not make it”. “Every ultrasound visit after that was a nightmare as Kachi was far behind in growth whiles Kamsi did great.
“Finally, at 37 weeks, I had to be induced immediately because I was told that Kachi had stopped growing..” After the birth Nurses let Judith hold her daughter briefly before she was whisked to the NICU.
“The first time I saw her, I wondered if the nurse was handing me my baby, or someone else’s,” Judith said. “I waited a few seconds for someone to tell me there was a mix-up?” “Soon the joy of seeing them both healthy surpassed any other feeling at that instant.”
“How did I get black and white twins?”
Several days later Judith and her husband were told that their baby girl had albinism.
“I loved my princess like every mother would love her baby but worried about her condition,” Judith said.
“I worried about her future, how society would treat her, how she’ll be accepted.
“Gradually, worry turned to sadness and I started questioning “I envied other black babies and thought, ‘Why me? Why was I the one to have an albino baby?’
“How did I get black and white twins?”
“I threw the braille sheets in the garbage”
Unfortunately, medical professionals were quick to affirm Judith’s worst fears and told her that Kachi would struggle to see and would likely need to learn to read braille.
“I couldn’t imagine Kachi reading with braille and threw the braille sheets in the garbage.” She said
“She’s so smart and has a strong personality. She knows what she wants and will always go for it. “I always tell her how beautiful she is, because she really is.
“I’m not sure she`s aware of her uniqueness at the moment, but eventually she’ll know.”
“It’s my responsibility to educate her and teach her to love herself no matter what.
Albinism
Albinism affects the production of melanin, the pigment that colours skin, hair and eyes. It’s a lifelong condition, but it doesn’t get worse over time.
People with albinism have a reduced amount of melanin, or no melanin at all. This can affect their colouring and their eyesight.
Albinism is caused by faulty genes that a child inherits from their parents.
Symptoms of albinism
Hair and skin colour
People with albinism often have white or very light blonde hair, although some have brown or ginger hair. The exact colour depends on how much melanin their body produces.
Very pale skin that burns easily in the sun and doesn’t usually tan is also typical of albinism.
Eye colour
Someone with albinism can have pale blue, grey or brown eyes. Eye colour depends on the type of albinism and the amount of melanin. People from ethnic groups with darker pigmentation tend to have darker coloured eyes.
Eye problems
The reduced amount of melanin can also cause other eye problems. This is because melanin is involved in the development of the retina, the thin layer of cells at the back of the eye.
astigmatism — where the cornea (clear layer at the front of the eye) isn’t perfectly curved or the lens is an abnormal shape, causing blurred vision
photophobia — where the eyes are sensitive to light
nystagmus — where the eyes move involuntarily from side to side, causing reduced vision; you don’t see the world as “wobbling” because your brain adapts to your eye movement
squint — where the eyes point in different directions
Some young children with albinism may appear clumsy because problems with their eyesight can make it difficult for them to perform certain movements, such as picking up an object. This should improve as they get older.
How albinism is inherited
The two main types of albinism are:
oculocutaneous albinism (OCA) — the most common type, affecting the skin, hair and eyes
ocular albinism (OA) — a rarer type that mainly affects the eyes
Autosomal recessive inheritance
In most cases, including all types of OCA and some types of OA, albinism is passed on in an autosomal recessive inheritance pattern. This means a child has to inherit two copies of the faulty gene (one from each parent) to have the condition.
If both parents carry the gene, there’s a 1 in 4 chance that their child will have albinism and a 1 in 2 chance that their child will be a carrier. Carriers don’t have albinism but can pass on the faulty gene.
X-linked inheritance
Some types of OA are passed on in an X-linked inheritance pattern. This pattern affects boys and girls differently: girls who inherit the faulty gene become carriers and boys who inherit the faulty gene will get albinism.
When a mother is a carrier of an X-linked type of albinism, each of her daughters has a 1 in 2 chance of becoming a carrier and each of her sons has a 1 in 2 chance of having albinism.
When a father has an X-linked type of albinism, his daughters will become carriers, and his sons won’t have albinism and won’t be carriers.
If you have a history of albinism in your family or you have a child with the condition, you may want to talk to your GP about getting a referral for genetic counselling.
A genetic counsellor provides information, support and advice about genetic conditions. For example, you can discuss with them how you inherited albinism and the chances of passing it on.
Albinism is usually obvious from a baby’s appearance when they’re born. Your baby’s hair, skin and eyes may be examined to look for signs of missing pigment.
As albinism can cause a number of eye problems, your baby may be referred to an eye specialist (ophthalmologist) for tests to check for conditions such as nystagmus, squint and astigmatism.
Electrodiagnostic testing is also sometimes used to help diagnose albinism. This is where small electrodes are stuck to the scalp to test the connections of the eyes to the part of the brain that controls vision.
As soon as Rhys heard the front door open, he jumped up and began shouting for joy, “Mom Daddy’s home, Daddy’s home!”. His heartbeat racing and his brown eyes shining excitedly, anticipating playtime with Daddy. A wide grin spread across Rhys’s face as Daddy acted like a big bear. Daddy quickly dropping down onto one knee so that he’d be at his son’s height to horse around the living room. Sadly this scene is becoming a rear sight to see.
Today let’s talk about the invisible dads, the ones who don’t marry Mummy, don’t support their kids and don’t hang around for the hugs, kisses and nappy changes. There are millions of them around the world, and their numbers are growing.
“Today, more than one in four births is to an unmarried mother, and more than one in 10 births is to a teenager. These numbers portend a future of fragile families. Once considered primarily a racial problem, fatherless homes have increased across a wide range of demographics over the last ten years.”
How have we come to the point where a child with two parents is the exception rather than the norm? It is time that we put the issue of fatherless families front and center on our national agenda.
So who’s the real problem here? And why should we care?
It is time to shift our attention to the issue of male responsibility, and to the indispensable role that fathers play in our society.
Firstly, it would be an oversimplification to assume that two parents are always better than one as there are many courageous and loving single moms and daddy’s who are able to balance the competing demands on their time and attention, to care and provide for their children alone.
However, contrary to the sentiments of our culture and though our society is only beginning to recognize it, the presence of fathers within the home is vital to the moral integrity of a society. The short-term effects are already far too evident as statistics reveal that the loss of fathers is reverberating throughout the world in the form of social pathologies ranging from teen pregnancy to drug abuse.
Fatherless children are five times more likely to be poor and twice as likely to drop out of school as children who live with both parents.
Boys, without proper male role models, look to other sources for the male bonding they need. In the inner cities that often entails gangs while in the suburbs it tends to be online.
“According to the latest statistics, the increase in the proportion of single-parent families accounted for about half of the overall increase in child poverty from 1979 through to 1987.”
The Scriptures warn us about the power of fatherhood, as well as the long-lasting impact that fatherhood has on us all. Exodus 20:4-6.” Fatherlessness is the most harmful demographic trend of this generation
The apple doesn’t fall far from the tree
“The apple doesn’t fall far from the tree” could be both about habits/behavior and also looks. Have you ever thought about that? Do you often find yourself reacting to a situation the way your father did? or scarier yet…do you ever see your mannerisms in your son? The footprint of a father leaves a permanent mark on the soul of a child.
Fatherhood is under assault
We hear a lot about the war on women…but it is the war on Dads that is causing the greatest damage in the world today. It’s not hard to find. If you watch any popular sitcom on television today, you’ll likely notice that fathers are typically portrayed as childish, irresponsible, lazy, incompetent and stupid.
The doofus dad stereotype isn’t new. There’s Fred Flinstone, and even Charlie Brown’s monotone parents. But according to Tierny, the consistency of these new portrayals has slowly created a new norm opposed to what being a father used to mean.
Dads make a difference. Dads can be heroes – if only we give them the chance. We remain optimistic that family still has more influence than media.
We all need another hero
Fathers are representatives of God on earth; as our heavenly father is the giver of life so also are the earthly father’s givers of life. Malachi 4:6 says “And he will turn, the hearts of the fathers to the children, And the hearts of the children to their fathers, Lest I come and strike the earth with a curse.”
God understands the importance of a father’s love and cares towards their children and He has set the standard by being the first example of a loving father.
“The SARRI report quotes research which found that “the presence of a father can contribute to cognitive development, intellectual functioning, and school achievement. Children growing up without fathers are more likely to experience emotional disturbances and depression.”
“Girls who grow up with their fathers are more likely to have higher self-esteem, lower levels of risky sexual behaviour, and fewer difficulties in forming and maintaining romantic relationships later in life. They have less likelihood of having an early pregnancy, bearing children outside marriage, marrying early, or getting divorced.”
A father’s touch
The first thing, therefore, that a father can do for his children is to love their mother. Another part of a father’s task is that of a protector for his family. But, Daddy also has another task in the home, which is to combine tenderness with strength, and to model the combination so consistently that the children regard the combination as natural.
Our kids must come to know naturally both that dad’s standards protect them, and that his love makes them strong.
Where have all the fathers gone?
Our courts do not value fatherhood as much as motherhood. In 2015 it is still the case that mothers and fathers do not have equal rights
And herein lies the problem. Our expectation of the role a separated father should play in his children’s lives is so low, that when half of dads who win “access” to their kids can’t even sleep under the same roof as their offspring, academics declare this to be an overwhelming success. One of the fruits of the feminist movement many claim is the idea that a woman is more responsible as a parent than the father is.
“He is not my Dad…he is just someone you sleep with!” How many mothers have felt the sting of those words? That is why God hates divorce. We should too.
Our culture has put asunder things which God has joined together—things such as tenderness and strength. It is the job of the father to put them back together again.
Fatherhood, like Motherhood has is its own rewards – as most dads have found. Sadly, for the others, the invisible ones, it is a gift foolishly squandered.
From vertical farms to living buildings, the city is on the cutting edge of environmentally sustainable urban solutions in the world.
Home to over 5.5 million, Singapore had no choice but to adopt high-density development because of its tight land constraints.
“We take steps to ensure our self-sufficiency,” says Yvonne Soh, general manager of the Singapore Green Buildings Council. “In Singapore, we have a lot of initiatives to promote sustainability.”
As Singapore expands, a novel approach preserves green space. New developments must include plant life, in the form of green roofs, cascading vertical gardens, and verdant walls mandatory since 2008. This has resulted in urban planners literally weaving nature throughout the entire city – visible from across the landscape. Innovative design has created the illusion of space using “green” and “blue” elements. This includes the creation of one of the largest freshwater city reservoirs in the world.
Much of that vision to keep Singapore both sustainable and livable stems from Cheong Koon Hean, the first woman to lead Singapore’s urban development agency (UDA). With a rising population and finite freshwater resources, some positive action was needed fast, so ministers set up a national water agency, PUB, which became the sole body responsible for the collection, production, distribution, and reclamation of water in the city.
The Gardens: look east for Eden, Singapore Style
Throughout the city, there are many green buildings such as the CapitaGreen office tower, the Park Royal on Pickering hotel and the Tree House condo near Bukit Timah Nature Reserve.
“Singapore is an island about half the size of London which has managed to preserve its cultural—Chinese, Indian, and Malay—and architectural legacy through a heritage conservation program.”
The futuristic ‘Gardens by the Bay’ in central Singapore, is a revolutionary botanical garden spanning over 100 hectares of reclaimed land. It’s a beautiful asset to the city but may also offer a path to the health and happiness of its citizens.
Garden of Eden is in Singapore!
Garden of Eden is in Singapore!
Garden of Eden is in Singapore!
Garden of Eden is in Singapore!
Garden of Eden is in Singapore!
Garden of Eden is in Singapore!
Garden of Eden is in Singapore!
Garden of Eden is in Singapore!
Garden of Eden is in Singapore!
Transport is another sector that has seen investment recently. On an island of 4.8 million people with limited space. After a series of smart card innovations, people have been able to use e-Symphony, an IBM-designed payment card that can be used to pay for road tolls, bus travel, taxis, the metro, and even shopping.
Have little ones with you? Take them to the Jacob Ballas Children’s Garden, where they’ll learn all about shrubs, plants, and all things green.
Up for a hike? Visit the MacRitchie Nature Trail & Reservoir Park. Complete the 11-kilometer-long nature trail and don’t miss the Treetop Walk, a 250-meter high suspension bridge that connects two of the park’s highest points.
History buffs can make a beeline for Fort Canning Park. Conveniently located in the heart of town, this site is home to numerous historical landmarks, such as Fort Gate, a remnant of a fortress that was built in the 19th century.
Singapore in 1965
When Singapore became independent in 1965, it was a city filled with slums, choked with congestion and a lack of jobs with limited land and no natural resources.
Singapore’s version of public housing is unique.
In 50 years, it has built a clean, modern metropolis with a diversified economy and reliable infrastructure and has transformed from a nation of squatters to a nation of homeowners with a 90% home-ownership rate, currently the highest in the world.
For vulnerable families who cannot afford a flat of their own, HDB helps them through its public rental program.
All these measures combine to make Singapore a smarter city.
“What we have done is to research and try to distill the principles for Singapore’s success in sustainable urban development – we call it a liveability framework,” says Khoo Teng Chye, executive director at the Centre for Liveable Cities based in Singapore.
Back to Eden
The planet simply can’t sustain current levels of resource use and environmental degradation. It has not a choice; cities have to change.
Cities cover just 2% of the Earth’s surface yet consume about 75% of the world’s resources. By 2050, it is expected that 70% of the world population will live in urban areas. According to a 2014 study by the United Nations, rural living is in decline on a global scale. Whereas just 30% of the world’s population were urban dwellers in 1950, more than half (54%) are now housed in cities, therefore, it’s clear they are key to tackling climate change and reducing resource use.
However, quality of life, environmental sustainability, and competitive economics. These are the components that make cities liveable and there is very strong evidence to show that maintaining a connection to nature is good for our health;
Fredi Devas, producer of the Cities episode of Planet Earth II says.
“Many studies show that hospital beds with a window onto greenery result in their patients recovering faster. Schools have better attendance and companies have better staff retention, if they have vegetation close at hand.”
Visitors to Singapore are often surprised by how green the island is considering how large a population it crams onto its small landmass. According to the latest Siemens’ Green City Index for Asia, Singapore is the best-performing city in the region when measured against a range of sustainability criteria.
Singapore stands as a model of sustainability and water management in the region and beyond and is the Eden garden city of the future.
Atkins has been chosen as the sustainability consultant to develop an environmental sustainability target for Old Oak Common, a £26bn urban redevelopment in London.
“Gentrification has profoundly influenced religion. In the context of Christianity, of course, gentrification takes on a new, existential dimension.”
At five times the size of the King’s Cross redevelopment, Old Oak and Park Royal is London’s largest opportunity area and urban regeneration investment project with an estimated worth of £7bn per annum to the UK economy. Old Oak and Park Royal has the potential to create up to 25,500 homes and some 65,000 jobs, constructing a transport hub to link Crossrail, National Rail and High Speed 2.
Atkins will create a set of sustainability targets to be used for the development in partnership with Old Oak and Park Royal Development Corporation (OPDC) and its cost control and project management advisor Faithful+Gould. The sustainability targets will be based on six core themes comprising urban form and public space, transport, energy, waste and materials, water, and access to nature, watercourses and green spaces.
Flexibility and adaptability will be a key focus area when developing the sustainability targets together with the combination of green infrastructure with urban planning and design, and the role of fast developing smart technologies.
“The Sustainability Targets Are Expected to Be Used for Anything up to 20 to 50 Years’ and Will Involve a Sensible Combination of ‘Open-Minded Thinking with Real-World Analysis.”
Sean Lockie, sustainability director at Faithful+Gould, said: “Old Oak and Park Royal is a massive opportunity for London to do things that haven’t been done before. “It means creating a vision which sets out clear goals, such as being healthy to live in, flexible over time, affordable, comfortable, and being energy and resource efficient, and then taking a systematic approach to delivery. “We’ll need to come up with some new business models to achieve this but in doing so we have a great opportunity to make a real difference in people’s lives.”
Atkins will lead stakeholder engagement workshops with the OPDC, designers and the local authority until August 2016 and is set to deliver its sustainability report to the OPDC in September 2016.
“Is urban regeneration about more than the material?” It’s about a piece of heaven on earth ”¦ where true expressions of what Jesus did or how he lived actually articulates itself into society.”
The Nigerian construction industry is mostly concerned with the development and provision of projects such as roads, bridges, railways, residential and commercial real estates, and the maintenance necessary for the socio-economic developments contributes immensely to the Nigerian economic growth (Bureau of Statistics, 2015). Butcher and demmers (2003) described projects as an idea which begins and ends by filling a need. However, a project fails when its idea ends without meeting the needs and expectations of its stakeholders.
Nigeria Has Become the World’s Junk – Yard of Abandoned and Failed Projects worth Billions of Naira!
Hanachor (2013), revealed that projects form part of the basis for assessing a country’s development. However, a damming report from the Abandoned Projects Audit Commission which was set up by the Ex-President Goodluck Jonathan in 2011 revealed that 11,886 federal government projects were abandoned in the past 40 years across Nigerian (Abimbola, 2012). This confirmed the assertion by Osemenan (1987) “that Nigeria has become the world’s junk –yard of abandoned and failed projects worth billions of naira”.
Abandoned projects including building and other civil engineering infrastructure development projects now litter the whole of Nigeria.
Physical projects do not only provide the means of making life more meaningful for members of the community where the projects are located, successful projects also result in empowerment and collective action towards self improvement (Hanachor, 2013).
This Issue of Abandonment Has Been Left Without Adequate Attention for Too Long, and Is Now Having a Multiplier Effect on the Construction Industry in Particular and the Nigeria’s National Economy as a Whole. (Kotngora, 1993)
PROJECT FAILURE
Project Failure might mean a different thing to different stakeholders. A project that seemed successful to one stakeholder may be a total failure to another (Toor and Ogunlana, 2008). Some stakeholders, more especially the project users and some private owners, think of failed projects as a situation where a completed building project collapsed, a situation where by a completed dam project stopped working after few days of completion, or a completed road project that broke down after few months of completion. Other experienced stakeholders, such as engineers and architects conform to the iron triangle by Atkinson (1999) which states that the most strategically important measures of project failure are “time overrun”, “cost overrun”, and “poor quality”.
Turner (1993) noted that a project fails when the project specifications are not delivered within budget and on time;the project fails to achieve its stated business purpose; the project did not meet the pre-stated objectives; the project fails to satisfy the needs of the project team and supporters; and the project fails to satisfy the need of the users and other stakeholders. Lim and Mohamed (1999) cited in Toor and Ogunlana (2009) clarified that there are two possible view points to project failure namely; the macro-level and the micro-level. They further explained that the macro view point reviews if the original objectives and concepts of the project was met. Usually the end users and the project beneficiaries are the ones looking at the project failure from the macro view point, where as the project design team, the consultants, contractors, and suppliers review projects from a micro view point focusing on time of delivery, budget, and poor quality.
In the early 1990s, the failure as well as the success of any project was determined by the project duration, monetary cost, and the performance of the project (Idrus, Sodangi, and Husin, 2011). Belout and Gauvrean (2004), also confirmed that the project management triangle based on schedule, cost, and technical performance is the most useful in determining the failure of a project. Moreover, a project is considered as an achievement of specific objectives, which involves series of activities and tasks which consume resources, are completed within specifications, and have a definite start and end time (Muns and Bjeirmi 1996, cited in Toor and Ogunlana, 2009). Reiss (1993) in his suggestion stated that a project is a human activity that achieves a clear objective against a time scale. Wright (1997) taking the view of clients, suggested that time and budget are the only two important parameters of a project which determines if a project is successful or failed. Nevertheless, many other writers such as Turner, Morris and Hough, wateridge, dewit, McCoy, Pinto and Slevin, saarinen and Ballantine all cited in Atkinson (1999), agreed that cost, time, and quality are all success as well as failure criteria of a project, and are not to be usedexclusively.
FACTORS OF PROJECT FAILURE
Cookie-Davies (2002) stated the difference between the success criteria and the failure factors. Hestated that failure factors are those which contributed towards the failure of a project while success criteria are the measures by which the failure of a project will be judged. The factors constituting the failure criteria are commonly referred to as the key performance indicators (KPIs).
Timeand Cost Overrun
The time factor of project failure cannot be discussed without mentioning cost. This is because the time spent on construction projects has a cost attached to it. Al-Khali and Al-Ghafly, (1999); Aibinu and Jagboro, (2002) confirmed that time overrun in construction projects do not only result in cost overrun and poor quality but also result in greater disputes, abandonment and protracted litigation by the project parties. Therefore, focus on reducing the Time overrun helps to reduce resource spent on heavy litigation processes in the construction industry (Phua and Rowlinson, 2003). Most times, the time overrun of a project does not allow resultant system and benefits of the project to be taking into consideration (Atkinson, 1999). Once a project exceeds the contract time, it does not matter anymore if the project was finally abandoned or completed at the same cost and quality specified on the original contract document, the project has failed. Furthermore, Assaf and Al-Hejji, (2006) noted that time overrun means loss of owner’s revenue due to unavailability of the commercial facilities on time, and contractors may also suffers from higher over heads, material and labour costs.
Poor quality/Technical Performance
The word “Performance” has a different meaning which depends on the context it is being used and it can also be referred to as quality. Performance can be generally defined as effectiveness (doing the right thing), and efficiency (doing it right) (Idrus and Sodangi, 2010). Based on this definition of performance, at the project level, it simply means that a completed project meets fulfilled the stakeholder requirements in the business case.
CAUSES OF PROJECT FAILURE
A lot of research studies have investigated the reasons for project failures, and why projects continue to be described as failing despite improved management. Odeh and Baltaineh, 2002; Arain andLaw, 2003; Abdul-Rahman et al., 2006; Sambasivan and Soon, 2007; all cited in Toor and Ogunlana, 2008, pointed out the major causes of project failures as Inadequate procurement method; poor funding and availability of resources; descripancies between design and construction; lack of project management practices; and communication lapses
The contract/procurement method
A result obtained from two construction projects which were done by the same contractor but using different procurement methods showed that rework, on the design part which occurs when the activities and materials order are different from those specified on the original contract document, makes it difficult for the project to finish on the expected time (Idrus, Sodangi, and Husin, 2011). This is as a result of non-collaboration and integration between the design team, contractor, and tier suppliers. The rework on the design portion has a huge impact on project failure leading to the time overrun. The traditional method of procurement has inadequate flexibility required to facilitate late changes to the project design once the design phase of the construction project has been concluded.
Nigerian most widely used procurement method is the traditional method of procurement (design-bid-construct) which has been confirmed to be less effective to successfully delivery of a construction project (Dim and Ezeabasili, 2015). And, the world bank country procurement assessment report (2000) cited in Anigbogu and Shwarka, (2011) reported that about 50% of projects in Nigeria are dead even before they commence because they were designed to fail.
The way the construction projects are contracted, in addition to the way the contracts are delivered, contributes to the causes of projects failure. Particularly, among the methods of project contracting is lump-sum or a fixed-price contracting method, in which the contractor agrees to deliver a construction project at a fixed price. The fixed-price contract can be low-bid or not however, once the contract cost has been agreed upon the contract award, it cannot be changed. And, contractors are expected to honor and deliver the contract agreement, failure to do so can result in a breach of contract which can result in the contractor being prosecuted.
Awarding a contract to an unqualified personnel also contributes to project failures. When a contractor places more emphasis on money and the mobilization fee after a construction project has been initiated instead of getting the right workforce and skilled professionals that will execute the project. Instead the workforce chosen will often not be base on competence and required skills rather it will be based on availability. Moreover, poor strategy and planning by contractors who have overloaded with work also contributed to one of the causes of project failure.
Poor funding/Budget Planning
A lot of public projects in the Nigerian construction industry failed as a result inadequate funding, and the difference between the national annual budget and the budget actual released. Most of the Nigerian public projects are signed even before the actual release of the national budget. The difference in budget of the contracted project and the actual budget release can get the contracted company stuck as a result of inflation of prices, scarcity of construction material at the time of the budget release and mobilization to site. Also un-planned scope of work which can be as a result of the contractor working on another contract when he is called back to mobilization to start work. Moreover, poor budget planning is a regular mistake made by some contractors by not undertaking feasibility assessments before starting the design. The construction project should be planned according to the available resources and not according to the unrealistic expectations a client has in mind.
Discrepancies Between the Design and Construction
Limited collaboration between the contractors, engineers, and the architect results in discrepancies between the project designs and construction on site, and further leads to rework. Changes on a project designs, and changing to the scope of work in the middle of construction processes on site can be dangerous, and can lead to time overrun, increase in cost, and most of all can lead to abandonment. Moreover, many cases have been seen where the designs from the architects are not buildable on site, whileIn some cases, most contractors are unable to adequately specify the scope of work for the construction processes on site. Therefore any default on the design by the architect can be an opportunity for the contractor to make more money which might cause the project duration to exceed the time specified on the contract document.
RESEARCH METHODOLOGY
This research starts with a general reasoning or theory which says that the major cases of project failure in the Nigerian construction industry are defined based on time overrun and cost overrun. The findings from the data analysis will help on the decision to accept the theory or not. The research data was collected from the progress report for the month ending of October, 2015 published by the Nigeria of Federal Ministry of works on thirty-nine on-going highway construction projects at the South-South geopolitical zone. The table 1 below shows the information on the data collected which comprises of the project title, contract Number, project description, the contractor that was awarded the projects, the date of project commencement, date of completion and the extended date if any. The scheduled time for each project was specified as follows: project commencement date labeled as “a”,project completion date labeled as “b”, and the extended date labeled as “c”.
DATA ANALYSIS
The data analysis was done with the use of Microsoft excel. The analysis started by obtaining the number of days between the date of commencement of each project and the date of completion to show the duration of each highway project. And, the number of days between the project completion date and the extension date showed the time-overrun. The project duration and the extended days were obtained with the use of NETWORKDAYS function in Microsoft Excel which calculates the number of working days between two dates excluding weekends and any dates identified as holidays.
The standard deviation between the specified project duration for each highway projects and the extended days was calculated to obtain the extent to which each highway project contract failed on its time of delivery. This was denoted as the degree of failure. The table 1 above showed the projects ranking which was done based on the degree of failure of all the highway projects. The highway projects that were ranked from one to sixteen have low degree of failure and are represented with green color, while the rest are those with high degree of failure and are represented with red color.
FINDINGS
The findings made showed that the successfully completed highway projects have no extended days or time overrun, and the successful on-going highway projects are still on schedule and have no extended days unlike the on-going highway projects that have already failed as a result of the extended dates. Other projects have been abandoned because they have exceeded the delivery date as specified on the contract document, and have no extended date of completion. Thus, no work is going on.
Figure 2 above showed that 14% of highway projects are still on-going projects because they have not exceeded the original date of completion as specified on the contract document. However, they are heading towards failure because they have been given an extended date of completion which can be as a result of some critical activities running behind schedule, causing delay on the critical path network of the projects. Moreover, the other 86% completely failed because they have exceeded their completion date specified on the contract document.
The figure 3 above showed that 63% of the successful highway projects are still on-going because they have not exceed their completion dates, and they are not yet completed. However, those on-going highway projects might end up as failed projects as a result of poor funding, discrepancy between the design and the construction on site, and conflict between the construction parties or stakeholders.
“Say what you will do, and do what you said” or “Say as you will do it, and do it as you said”
CONCLUSION AND RECOMMENDATION
The idea of knowing what a failed project is, the factors and the causes is very important in project management. Success in project management can neither be achieved nor measured without the knowledge of project failure, its factors, and causes in the Nigerian construction industries. This work has shown that project failure is as a result of exceeded time of delivery, cost overrun, and poor quality. However, the analysis was only done based on exceeded time of project delivery because of the nature of the data collected.
This work suggested a few approaches to help reduce the number of failed projects in the Nigerian construction industry if properly implemented. Firstly, Having good collaboration between the project stakeholders involved in a construction project at the early stage of project conception is most important in order to accomplish the project objectives, and deliver the project on time, within budget, and quality specified on the original contract document (Othman, 2006).
Secondly, Adopting the ISO 9000 technique which is used for quality management will also help in achieving a successful project delivery. This technique states “ say what you will do, and do what you said” or “say as you will do it, and do it as you said”. This technique is not an indication of high quality but it promotes control and consistency which leads to specialization, and improved productivity and quality. Also, adopting the principles of lean construction will help to reduce waste within the construction and stream-line activities in order to improve the on-time delivery of projects.
Thirdly, Learning from the precedent failed projects, how those projects failed, and the reason for their failures. This will help the project manager to plan and mitigate the risks of project failures in the future. And, finally, more seminars and workshops will help to educate and enlighten clients (the federal government representatives), users, contractors, engineers, and architects on what is project failure, the factors that contributes to abundant failed projects, and their causes.
REFERENCE
Abimbola, A. (Novermber 24, 2012). About 12,000 Federal Projects Abandoned across Nigeria. Premium times (November 16, 2015). Retrieved from www. Premium timesng.com/news/108450-about-12000-federal-projects-abandoned-across-nigeria.html.
Al-Khali, M.I and Al-Ghafly, M.A. (1999). Important Causes of Delays in Public Utility Projects in Saudi Arabia. Construction management and Economics, 17, 647-655
Aibinu, A.A and Jagboro, G.O. (2002). The Effects of Construction Delays on Project Delivery in Nigeria Construction Industry. International journal of Project management, 20(8), 593- 599.
Anigbogu, N. and Shwarka, M. (2011). Evaluation of Impact of the Public Procurement Reform Program on Combating Corruption Practices in Public Building Project Delivery in Nigeria. EnvirontechJournal, 1(2). 43-51.
Assaf, S. and Al-Hajji, S. (2006). Causes of Delays in large Construction Projects. International Journal of Project Management, 24, 349-357.
Atkinson , R. (1999). Project management: Cost, time, and quality, two best guesses and a Phenomenon, it’s time to accept other success criteria. International Journal of project Management, 17(6), 337-342.
Belout, A and Gauvrean, C. (2004). Factors Influencing the Project Success: The impact of human resource management. International Journal of project Management, 22, Pp. 1-11.
Butcher, N. and Demmers, L. (2003). Cost Estiumating Simplified. Retrieved from www.librisdesign.org.
Cookie-Davies, T. (2002). The Real Success Factors on Projects. International Journal of Project management, 20(3), 185-190.
Dim, N.U. and Ezeabasili, A.C.C (2015). Strategic Supply Chain Framework as an Effective Approach to Procurement of Public Construction Projects in Nigeria. International Journal of Management and Susutainability, 4(7), 163-172.
Hanachor, M. E. (2012). Community Development Projects Abandonment in Nigeria: Causes and Effects. Journal of Education and Practice, 3(6), 33-36.
Idrus, A., Sodangi, M., and Husin, M., H. (2011). Prioritizing project performance criteria within client perspective. Research Journal of Applied Science, Engineering and Technology, 3(10), 1142-1151.
Idrus, A. and Sodangi, M. (2010). Framework for evaluating quality performance of contractors in Nigeria. International Journal of Civil Environment and Engineering. 10(1), 34-39.
National Bureau of Statistics (January, 2015). Nigerian Construction Sector Summary Report: 2010-2012.
Kotangora, O. O. (1993). Project abandonment, Nigerian Tribune.
Osemenan, I. (1987). Project Abandonment. New Watch Magazine, Vol. 1, pp. 15.
Phua, F.T.T and Rowlinson, S. (2003). Cultural Differences as an Explanatory Variable for Adversarial Attitude in the Construction Industry: The case of HongKong. Construction Management and Economics, 21, 777-785.
Reiss, B. (1993). Project Management Demystified. London: E and FN Spon Publishers.
Toor, S. R. and Ogunlana, S. O. (2008).Problems causing Delay in Major Construction Projects in Thailand. Construction management and Economics, 26, 395-408.
Toor, S. R. and Ogunlana, S. O. (2008). Critical COMs of Success in Large-Scale Construction Projects: Evidence from Thailand constructuction industry. International Journal of Project management, 26(4), 420-430.
Toor, S. R. and Ogunlana, S. O. (2009).Beyound the “Iron Triangle”: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. International Journal of Project management, doi: 10.1016/j.ijproman.2009.05.005.
Toor, R. and Ogunlana, S. (2009). Construction Innovation: Information, process, management. 9(2), PP. 149-167.
Turner, J. R. (1993). The Handbook of project-Based Management: Improving the process for achieving strategic objective. London, McGraw-Hill.
Wright, J., N. (1997). Time and Budget: The twin imperatives of a project Sponsor. International Journal of Project Management, 15(3), 181-186.
LONDON – The debate over the £19 billion scheme for the third runway at Heathrow airport has been a long-running row which has grown into fierce opposition within the last couple of months.
We shall not be moved, Heathrow Airport management has stuck to its original course of action, while ignoring constant protests and public discontent and insists that expanding Heathrow will provide the growth, jobs, experts, and connections to make Great Britain greater still.
Sir Richard Branson Urges Heathrow Expansion, and Says “Britain Is ‘being Held Back Massively”.
The billionaire founder of the Virgin Group has accused politicians of neglecting to back the expansion project at Heathrow because they are more concerned about their own jobs rather than doing “what is right for the UK”.
The entrepreneur, Sir Richard Branson urged the Government to be ” bold and brave on big infrastructure decisions like this”.
Hounslow Council, on the other hand, has been accused of “throwing in the towel” over the Heathrow expansion after it promoted the “opportunity of a third runway”. In response, Hounslow Council leader Steve Curran stated its stance on Heathrow had not changed but said it needed to be prepared if the government approves the recommendation for a third runway later this year.
Meanwhile, twelfth century St Mary the Virgin sits right in the middle of flight paths in the village of Harmondsworth, Middlesex and under blueprints for the expansion of the airport, most of the buildings in the village will be demolished but the 951-year-old grade II listed church will be spared. Protesters say there would no longer be anyone to use it.
Worshippers have already prayed at a Service of Hope that the Government will reject Heathrow’s expansion plans.
Amid mounting concerns and opposition from the whole community Justine Greening, the International Development Secretary predicts the government will ditch the £16bn plan for a third runway at Heathrow.
“Trying to Expand Heathrow Is like Trying to Build an Eight Bedroom Mansion on the Site of a Terraced House. It Is a Hub Airport That Is Just Simply in the Wrong Place” – Justine Greening
London Mayor Boris Johnson has been a vehement opponent of Heathrow expansion and has said
that the New Heathrow runway will negatively affect public health. In his report ‘Landing the Right Airport’ presented in March, Boris Johnson evaluated damages caused by the new runway to be between £20bn to £25bn during the next 60 years.
Both Zac Goldsmith and Sadiq Khan, respective Conservative and Labour candidates to succeed Mr. Johnson are also on the bandwagon and are campaigning against a third runway. This controversial debate has also resulted in Downing Street issuing an instruction to ministers asking them not to discuss the proposed third runway at Heathrow airport.
The North West Runway Will Be Two Miles (3,200m) Long, Making It Big Enough for Any Aircraft in the World to Use It
The commission, which was ordered by the government coalition, stated that the Heathrow expansion is ‘the best answer’ to easing the pressure on the UK’s crowded air terminals and that it will not increase noise above current levels, but will generate up to £147 billion in GDP impacts over 60 years.
Furthermore, if the plan for the third runway is approved, it will provide 740,000 flights a year, putting it on equal footing with Paris, Frankfurt, and Amsterdam.
A decision on whether to build a third runway at Heathrow Airport has been delayed until summer 2016, the government has confirmed.
Only one in three software projects will turn out to be successful. According to Standish Group’s 2015 Chaos report, 66% of technology projects (based on the analysis of 50,000 projects worldwide) end in partial or total failure. More surprisingly, these statistics have been the same for the last five years, the report shows. Furthermore, 17% of large IT projects go so badly that they can threaten the very existence of a company.
On Average, Large It Projects Run 45% over Budget and 7% over Time, While Delivering 56% Less Value than Predicted
Despite such failures, huge sums continue to be invested in IT projects and written off. For example the cost of project failure across the European Union was ┚¬142 billion in 2004.
It Projects Always Come with an Element of Risk, but There Are Huge Gains to Be Had If We Can Just Avoid Some of the Factors That Contribute Frequently to Project Failure
What makes a IT project successful, though?
According to the Standish Group, a successful project is on time, on budget and has satisfactory results (value, user and sponsor satisfaction, and meets target requirements). Other measures of success are widely known and accepted as true such as getting requirements right, providing effective leadership, and having full support and engagement from sponsors and users. Without these, it’s unlikely that any project would succeed.
But there’s more to success than what is widely known and, apparently, rarely followed. To reduce the risk of failure for your tech project, here are six key actions to take on the road to success.
1. Executive Vision and Involvement
Without a Executive Senior Sponsor Its Easy for Projects to Fail with the Organizational Resistance That Accompanies Large Change
Executive involvement is a primary variable in predicting the success of an IT project. Having a leadership team aligned across an organization articulating the purpose, value, and rationale for a project goes a long way towards getting stakeholders and end-users pulling the proverbial rope in the same direction.
2. Have a clear view of scope and timetable
Oftentimes, a tech project flops because its developers fail to plan and rush forward with an idea. However, some project managers plan so meticulously that they end up falling behind and lose momentum. The best approach is somewhere in between.
Interviewing team members, documenting requirements, prioritizing what is “mission critical” versus “nice to have,” getting agreement across stakeholders can feel like a never-ending cycle. As a result, requirement gathering has fallen out of fashion with many organizations in the past few years.
However, the ideal starting point for a successful technology project is to have a set of fundamental requirements with sufficient detail to develop against.
Requirement Gathering Is Labour-intensive and Challenging but Remains the Roadmap and Measuring Stick for Software Projects
This approach allows you to maintain sight of the business benefits as well as engaging stakeholders and responding to their feedback. In combination with a clear business case, a well-defined set of requirements also simplifies design and testing, two areas where projects tend to go sideways.
Ensure that requirements for the project are clearly defined and agreed upon among stakeholders and that you have a way to track, measure, and manage changes in requirements as appropriate during the project.
3. Define how you will deliver
When it comes to delivering a major project, one size does not always fit all. All products are customizable to some degree, so what might have worked in one company may not work in another company.
That being said, why reinvent the wheel if it’s already proven successful? Sometimes it can be more beneficial to use an existing off the shelf solution. Whichever direction you take, choose the delivery mode that works best for your company.
4. Risk Identification and Management
Every project has risk and there are many factors out of your control. People leave the organization, for better or worse, leadership changes, budgets get cut, however, many risks to projects can be mitigated or even eliminated with some forethought and on-going management. For example, do you have the resources you need to deliver the project (resource risk). Are project goals clearly understood and requirements clearly defined (scope risk). Do you have a realistic project plan and timeline (time risk).
Mitigating Risk Is a Combination of Science and Art, and Always a Balancing Process
5. Test your product again and again
A technology project is something that should overall support your business. It should not be something that dictates and forces you to change your operations. If this is happening, you should shift gears and focus on tweaking the technology, rather than lowering expectations and adopting less ideal requirements.
Adequate testing is a must for any tech project. While some features may be fine with automated testing, the best approach is to have a dedicated testing team. Testing activities should mirror those with the development team throughout the project’s lifetime. With thorough testing, a project should deliver with less design flaws or missing requirements.
6. Prioritize simplicity and performance
Developers often leave the external look and feel of a product to the wayside thinking these things are not necessities for the consumer to enjoy. However, user experience is absolutely critical to the success of the project.
Developers must consider things like storage, network requirements, processing speeds and overall performance in order to satisfy the customer. If users are going to have to wait for an extended period to allow information to load, there must be a good reason for the wait, otherwise they won’t return for future products.
Simplification and Improved Efficiency Is What Adds Value
Ultimately, using the product should be a smooth and intuitive experience. Additionally, tools and alternative routes must be placed logically without being intrusive. The process can be complicated, but the finished product should emit simplicity. After all, that’s what makes companies like Apple so successful. Simplification and improved efficiency is what adds value.
The “agile” buzzword has really taken hold among a myriad organisations worldwide. That result is not particularly surprising. Who wouldn’t love to employ light and fast tactics that allow them to respond to rapidly changing challenges? Despite all the optimism about agile methods, the bigger question is how well companies are actually doing when it comes to employing these methodologies in the real world. Without understanding what the core objectives of embracing agile methods are, it’s not going to be easy to gain results.
Agile methodology is employed in order to reduce the time, risk, and cost that is associated with a project. However, these massive benefits are not going to materialise out of thin air. They are the result of the dedicated work of a team who is well versed in implementing the methodology.
To become “agile” will require organisations to take a quantum leap in their culture. They will have to embrace the entire philosophy behind these methods or no real change will take place. Truly agile companies are the ones that have gone through a transformative process in order to implement brand new processes that say goodbye to the past. This takes a lot of work and effort and not all organisations are willing or able to do this.
Ugly Agile Implementations
Project teams that are solely focused on results and who don’t do their homework end up with very ugly agile implementations. These teams are so excited about agile as a concept that they convert everyone in their organisation into adopting the methods. The problem is, they do not spend the requisite time getting everyone on board with exactly what needs to be done.
Because of this oversight, the projects are plagued with poor communications and engagement. The project team and others in the organisation are each working on their own tasks with no thought to how the pieces fit together in the “big picture.” This is a major problem because agile methods really only shine when the whole organisation works as one well-oiled unit. In this scenario, major issues at the core of the project are neglected and the entire project goes off the rails. This leaves a bad taste in the mouths of managers, who are no longer excited about agile methods.
Really ugly agile implementations have the wrong focus. Because of this myopia, the true benefits of agile employment are never realised. Before long, things, unfortunately, go back to “normal.”
Bad Agile Implementations
Some businesses completely miss the boat when it comes to agile deployment. They’re interested in receiving the benefits of reduced costs, faster time to market, and cutting “red tape.” Despite this knowledge, they’re not truly committed to the all of the values that are espoused by the Agile Manifesto. Without this commitment, they cannot possibly hope to fully embrace a functional implementation.
Organisations like to invest in education and communications, but they ignore important concepts like utilising the tools that help them truly embrace agility. They even form teams that understand cross-functionality, but without empowerment they are unable to make vital decisions.
Lastly, organisations that do poor agile implementations perform project reviews regularly enough, but the input from the meetings is never acted on by anyone. The key issues that are preventing proper implementation are never properly addressed and the project fails on its promise. Organisation members swear off the agile methods forever at this point.
Good Agile Implementations
When business personnel and IT staff work together, good implementations of agile are the result. These units work together so that a project delivery methodology is presented to the organisation that meets its needs. They also spend the time to create the cultural changes needed to ensure the methods are successful.
In organisations like this, team members, business end users, along with senior management and key stakeholders received a continuous education that empowers them all. Cross-functional teams that excel are the results. These organisations also invest in the techniques and tools that fully support agile. That includes test driven development, continuous builds, new standards, and more. With these in place, a platform that ensures long-term success will be installed.
Particularly telling, these businesses conduct regular project reviews which they conceptualise as opportunities to improve instead of something that simply has to be done. When change is needed, they embrace it and plan for it. When it arrives, they are ready and the organisation continues to excel. A sign of a good agile implementation is when the organisation is commits to making long-term changes that will benefit the methodology in the long run.
It doesn’t pay to underestimate just how difficult implementing good agile really is. Since major internal changes to how project delivery is done need to be embraced, the road ends up being a challenging one. Traditional managers will be challenged because empowered teams now have more input than ever before.
Once a good agile implementation is in place, the benefits are obvious and plentiful. An energised, cross-functional community of empowering people who are all focused on common goals get more done than ever before. Good implementation put platforms into use that improve project delivery because they allow for test-driven development, continuous integration, standards implementation, and best practice design applications.
Project Journal had the privilege of interviewing AXELOS previous CEO Peter Hepworth. Peter provided us with an insight into his role and AXELOS as a whole in October 2015.
AXELOS CEO Peter Hepworth
Peter joined AEXLOS as CEO in July 2013 and was previously Managing Director for Activision Blizzard a $400 million turnover and $150million EBIT business. In 2014, Activision Blizzard was the fifth largest gaming company in the world by revenue.
Peter is an economics graduate, chartered accountant, with an M.B.A. from Cranfield and A.M.P. from INSEAD.
What is AXELOS?
AXELOS is a joint venture set up in 2014 by the Government of the United Kingdom and Capita, to develop, manage and operate qualifications in best practice, in methodologies formerly owned by the Office of Government Commerce (OGC).
AXELOS is an independent organisation, allowing the user community to focus more on the content of frameworks and guidance without much interference. The firm puts a heavy focus on the guidance given, ensuring the content is fuelled by good ideas to keep the ITIL structure up to date. But while the business has a combination of access to one of Britain’s largest corporations and the UK government, more than 75% of publication sales and Prince2 certification is sold outside of the UK, a trend that is growing faster due to emerging markets.
The company varies its training approach. Its Portfolio, Programme, and Project Management Maturity Model (P3M3), for example, encourages users to assess their performance against benchmarks. Mike Acaster, PPM portfolio manager, says: “PRINCE2 is applicable to many sizes of organisation, but sometimes it’s better to be a bit more specific. It’s about tailoring advice for that context. In some cases it has been tailored, and people don’t realise it’s PRINCE2 – you have to scratch the surface.
How do you view the future of project management?
After years of being associated with large engineering and construction projects, project management has moved beyond infrastructure. Firms across different countries and sectors now acknowledge the need to manage their processes and keep costs and timing under control. As businesses begin to recognise the importance of project management worldwide, questions are being asked about the standards required. AXELOS is focusing on how these can apply to different staff and situations, as well as how workers can develop a career path in project management.
Is AXELOS popular aboard?
“It’s hard to measure the adoption of our products, but if you look at the number of exams taken, you can see strong growth outside the UK, as well as in the UK,” he says. “In the US there’s a lot of interest, and the biggest international user of PRINCE2 is the UN, to make sure their aid development is correctly managed.
“Our Managing Successful Programmes (MSP) product was used to deliver the Olympic Games. I was in Tokyo after they had won the right to host Tokyo 2020 and the focus was ‘When can we have MSP?’ They want to see the same success as London has had.”
What are the future priorities for AXELOS?
“Career path. For the individual, it’s about how your career can develop. There’s a different skill set between project and portfolio management, and no linear route. It comes to modularisation. We have been able to offer different dimensions.
Cyber Resilience is next. Companies need to put more emphasis on improving their reactions to cyber attacks rather than continuing to focus on prevent. Although there are a number of standards and best practices in place to prevent cyber attacks, firms are still falling foul, and this is usually due to the internal attitude and people, rather than technology.
New products launched in 2015 include PRINCE2 Agile; Cyber Resilience Best Practice and Continuing Professional Development (CPD).
What’s next?
Young people are learning things online and changing how it is done. We want our members to feel proud about having AXELOS qualifications and have launched digital badges so that project professionals can display their mark of professionalism across popular social networks.
Digital badges are tokens that appear as icons and are awarded to signify learning achievements in a way that can be easily verified and shared online. Our members digital badge’s will hold and display information about their professional development activity as well as the issue date and an expiry date.
Individual workers, organisations and entire industries can benefit from badges. Badges are a new form of currency – a more transparent and efficient way to communicate the acquisition and development of workplace skills.
From AXELOS to Microsoft, IBM to Oracle, many leading companies have adopted digital badges as a form of recognition for continuing professional development and certifications. The individuals who earn these badges enthusiastically share them to LinkedIn, Twitter, Facebook and other online destinations. Once shared, anyone can verify the authenticity of and learn more about the individual’s abilities. That shareability and verification can make all the difference in a competitive job market, whether an individual aspires to move ahead in her current position or move into a different job.
We also want continued openness from AXELOS, even more community collaboration and specific actions to further increase the relevance of AXELOS in the future.
Where do you believe project management is heading?
Anyone can benefit from project management guidance. “We are all project managers now,” he says.
Since the dawn of time, mankind has used myths to make sense of the uncertainty that surrounds us. In the early 1990s a lot of people believed that project management was the best kept secret in business. However, because project management was not seen as a prevailing profession at that time, it suffered from a lack of awareness which was in a sense, a double edged sword. Those who were knowledgeable in the practice of project management became extreamly valuable to organisations and pioneers for the profession.
These early adopters were able to convince organisations that project management practitioners were needed. Myths around project management began to form in the business community and as the role of the project manager was unclear, questions were raised as to what project management was and what it could offer organisations.
The definition of the word myth is a “widely held, but false belief or idea.” Here, we’re going to examine 10 of the most pervasive PM myths that have emerged.
Myth #1 – Contingency pool is redundant
This is one of the most ‘mythical’ myths that has plagued the industry for a long time. Coupled with the tendency to presume that ‘real work’ is tantamount to implementation or building something concrete and you have the perfect recipe for project disaster. The thought pattern behind this approach typically originates from budget constraints and/or having unrealistic expectations. As we all know, or should know, the unexpected happens quite regularly. An effective contingency plan is important as it aims to protect that which has value (e.g., data), prevent or minimise disruption (e.g., product lifecycle), and provide post-event feedback for analysis (e.g., how did we fare? did we allocate funds correctly?).
Myth #2 – Project Management software is too expensive
If your idea of project management software involves purchasing servers, and purchasing a software application from a major vendor for a small practice with 10 practitioners then, yes, it is too expensive. If, however, you have gone cloud and elected to use a powerful web-based project management solution (such as Smartsheet), then you are likely to save thousands of pounds while reaping the benefits of a pay-as-you-go price structure. The present, and future, lie in cloud solutions that provide equal, or superior, functionality at a fraction of the cost.
Myth #3 – Project Management methodologies will slow us down
Project managers have a reputation of using process-intensive methodologies that favour ideology over pragmatism. In some instances this may, indeed, be the case when there is a mismatch between a specific project management approach and the organisation’s acutall needs (e.g., a process-driven method, such as PRINCE2, may not be appropriate for a slightly chaotic environment that favours an adaptive approach, such as Scrum). So, in sum, put down the paint roller (“Project Management isn’t for us!”) and take out your fine-bristled brush (“The Critical-Chain method may not be our cup of tea, but Agile on the other hand”¦”).
Myth #4 – Facts and figures are more important than feelings and perceptions
While facts are very important, projects are often derailed and sabotaged because of false perceptions. The PM must pay attention to both fact and fiction to navigate through turbulent organisational change.
Myth #5 – Project managers need to be detail oriented and not strategic in nature
While it is of the utmost importance for the project manager to understand how to read the details of the project, they must also understand how the project supports organisational objectives. Having a strategic perspective adds great value to the skill-set of the project manager.
Myth #6 Rely on the experts in everything that you do
It is true, we do need to rely on the experts but our trust can not be a blind faith. The job of the project managers in this area is twofold. First we must extract information and second we must verify that the information is accurate. A good example of this is asking a planner to provide an estimate on the effort required to perform a task. In some instances team members forget to include tasks which ultimately results in a faulty estimate.
Myth #7 All the battles have to be fought and won so that we can succeed
Project managers sometimes make the assumption that they need to stand firm to get the job done, however, coming to compromise on a particular issue is often a better course of action in order to win the war.
Myth #8 Project Managers can wear multiple hats
Wearing different hats can be extremely confusing. This is especially true if the project manager is asked to be a business analyst or technical expert on top of serving in their PM role. They end up doing both roles with mediocrity. When we “wear two hats” we essentially tell ourselves that both hats fit on one head at the same time. However, what happens if the demands of two roles conflict and what assurances do we have that we’re managing the inherent conflict of multiple roles and the risks the roles introduce? Sadly, multiple roles become more common as we move up the management hierarchy in an organisation, and that’s exactly where potential conflicts of interest can do the most harm.
Myth #9 Once the risk register is created, it’s full speed ahead
Risk management provides a forward-looking radar. We can use it to scan the uncertain future to reveal things that could affect us, giving us sufficient time to prepare in advance. We can develop contingency plans even for so-called uncontrollable risks, and be ready to deal with likely threats or significant opportunities. Too often, it’s not until a catastrophic event occurs and significantly impacts project progress that ongoing risk reviews are conducted.
Myth #10 Project managers can not be effective in their role unless they have specific technical expertise in the given field that the project falls within
You don’t need to be an engineer to manage a construction project or a IT technician to manage a software development project. All you need is a fundamental understanding with strong PM skills to manage the team. Experience in the field helps but does not guarantee success.
Project management is challenging enough without the myths. The profession has come a long way since the 1990s and some of these myths are fading. However, we still see remnants of them in one form or another. Great projects cut through false assumptions and confusion, allowing their teams to make smart decisions based on reality.
These are just 10 project management myths, what are yours?
The term ‘Modern Methods of Construction’ (MMC) embraces a range of technologies involving various forms of prefabrication and off-site assembly.
MMC is increasingly regarded as a realistic means of improving quality, reducing time spent on-site, improving on-site safety and addressing skills shortages in the construction of UK housing.
The variety of systems now available potentially allows the designer enough choice to sidestep problems deriving from constraints posed by the use of any one method. MMC systems, from closed-panel timber framed systems to bathroom pods are a palette from which designers can make choices. They are not necessarily stand-alone solutions that anticipate all the needs of an individual site and can be mixed and matched as appropriate.
These limitations are not obstacles to achieving the good design in MMC-based schemes, but may hinder the incorporation of more complex and innovative types of MMC from which greater overall benefits may be obtained which are considered under the following headings:
1. COST UNCERTAINTY
There is no doubt that, given products of comparable performance the key issue in purchases of MMC construction systems is the price. At present not enough is known about the potential costs of using volumetric and closed panel systems to enable confident specification at an early date. This inhibits designers from exploring the full potential of MMC systems. This is particularly true of the less repetitive, small, one-off scheme, where a smaller margin of benefits is gained from using MMC. The principal barrier to the uptake of MMC, therefore, seems to be the perception of cost uncertainty with respect to using more complex systems. Without doing substantial project-specific research, consultants and their clients simply do not know with enough degree of certainty how much the volumetric or closed panel systems are likely to cost, and what would be the savings to overall project costs produced by potential speed gains to offset against increased capital expenditure.
This is due to the complexity of assessing the ratio of cost of repetitive elements where pricing is relatively straightforward to the cost of adjusting elements or building in another method for the abnormal condition. Decisions to use innovative systems are likely to be made once designs are well progressed to enable teams to be more certain of costs. This can increase the potential for change or result in design compromise as the designer attempts to incorporate the specific limitations of a particular system in their design.
In an attempt to improve this situation, the MMC consultant and or clients could pull together a directory of MMC expanded to include cost comparison data. The huge range of variables involved inevitably makes this difficult, but a database of current construction cost information would be an invaluable resource.
2. PLANNING PROCESS AND EARLY COMMITMENT TO A SYSTEM
The time it can take to obtain planning permission has obvious implications both for project cost but also, in some circumstances, for architectural design innovation.
Most of the more complex types of MMC have an impact on dimensioning, the choice of external finish and detailing may have some effect on the buildings mass. Therefore, the construction system should be chosen prior to a planning application to avoid abortive work, redesign or amendment, or even resubmission for planning permission.
However, developers whose money is at risk, frequently hold off deciding on the construction technique until the last practicable moment, in order to get any advantage from fluctuations in material or component pricing.
Given the potential for lengthy duration of planning applications, this means that there is little incentive to prepare initial designs for planning with a prior decision to incorporate MMC firmly embedded. In cases where the developer has a financial or business link with the supplier, this is less likely to be the case. As the majority of commercial or residential developments involve some kind of arrangement with a developer, agreement on construction systems is often left to the stage after planning.
3. TIME INVESTMENT
Another very significant factor is the time investment required at the early stages of projects. This is needed to develop the design when the project is still at risk. There is a direct relationship between the scale and complexity of MMC component and the amount of time required to develop a design at an early stage.
The introduction of advanced or complex MMC techniques into the design process is potentially costly to the design team. A significant amount of research is needed to explore alternative systems, to obtain verification of suppliers’credentials, investigate mortgage and insurance issues, visit previous sites, talk to system suppliers, obtain technical performance guidelines, understand junctions and interfaces, coordinate other consultants, obtain building control input and so on.
For a consultant, the only way of investing in this research is either through timely payment of increased fees by a visionary understanding client or through the anticipation of increased future productivity through repetition when a project is phased, or large enough, or likely to be followed by another similar project.
The potential of learning a system and then being able to repeat lessons learned efficiently is a powerful incentive for both client and consultant. By contrast, HTA’ s project at Basingstoke is an example of a phased project with a three to four-year duration allowed the design team to repeat various elements of the design, and the manufacturer to develop improved solutions to technical and supply problems.
4. INSUFFICIENT COMMUNICATION
Improved dialogue at the outset of the project is vital if design quality is to be maximised. Constraints and opportunities implicit within a particular system are more easily incorporated into design if partners communicate pre-planning. Increased early communication can be fostered through improved long-term partnering relationships.
Clients should also partner with a range of suppliers and architects so that choice and flexibility is not restricted.
5. INEXPERIENCE
Generally, the inexperienced client or design team will have to do more research, with the result that there is likely to be significant design development without a specific system being incorporated.
This is a disincentive to using a more complex system involving a higher proportion of MMC, where early decision making and knowledge of a system’ s capabilities have a decisive influence on the nature of the architecture. However, encouraging the take up of MMC through the use of a dedicated funding mechanism may assist clients in finding time for research into suitable MMC techniques.
6. SUPPLIER’S ROLE
Site capacity studies and early stage pre-planning design studies could be undertaken directly by system suppliers on behalf of clients, cutting out the usual procedure of commissioning design work by independent consultants.
7. ASSUMPTIONS
There are a number of assumptions that are generally held about certain types of MMC that may have been valid at one time but are no longer true today. There is a need for reliable and up to date information comparing system criteria, performance data, timescales, lead in times, capacity, construction time, sequencing issues, limitations, and benefits.
Therefore it would be helpful if a forum for discussion and experience exchange was set up.
8. DEMONSTRATING THE BENEFITS OF MMC
There is still a large amount of skepticism about the need to go very far down the line with MMC. This is reflected in the acceptance of the desirability of maintaining or indeed enhancing the pool of traditional craft skills throughout the UK.
A balanced view is that there is a demonstrable need for the wider use of MMC which is recognized by both industry and government. The best way for clients and the public generally to become more confident and knowledgeable about the quality of design achievable through MMC is to see it demonstrated.
9. FINANCIAL INCENTIVES
There is no doubt that spreading the burden of investment through the life of a project helps to ensure a higher standard of specification and hence quality. In the Netherlands, a ‘ Green Financing’system has been developed by the Dutch government that provides favorable loan finance when certain sustainable standards are reached. In the UK, the Gallions HA has pioneered a study of this, based on a scheme in Thamesmead, ‘ the Ecopark project’.
Change management is an approach to transition individuals, teams, and organisations to a desired future state. For over three decades, academics, managers, and consultants, realising that transforming organisations is difficult, have avoided the subject.
My Way or the Highway
Major organisational change is profoundly difficult because the structure, culture, and routines of companies often reflect’s persistent and difficult-to-remove ways of working, which are resistant to radical change even as the environment of organisations change.
What started out as a financial buzzword in the early nineties has become fundamental business practice, with executives recognising the need to keep abreast with the competition in a rapidly developing corporate new world.
Navigating change
Globalisation and the constant innovation of technology result in a constantly evolving business environment. There is an ever-increasing need for Change Management Lead’s / Senior Managers who can help organisations successfully navigate change in today’s business environments. The focus of this movement to date has been on how to partner with organisations to define education, training and communication platforms that help to support the change initiatives and concerns of company employees. The critical aspect is a company’s ability to win the buy-in of their organisation’s employees on the change initiative.
While a project team is important for success, a senior level advisor is invaluable and can work with an organisations leadership team to avoid common pitfalls that change management projects often fall into. There are four key areas where an Advisor should act as this resource as follows:
1. Defining A Strategy
Executives should start by asking themselves what exactly needs changing and why? Organisational change directly affects all departments from entry level employees to senior management and must be aligned to a companies strategy. Too many programs are heavy on the jargon and light on the substance. Executives are often sold on an idea only to realise as the change initiative begins that they need a different outcome, tool or process to be successful.
In this situation the strategy for change needs to be re-aligned with the organisation and its goals.
An outside senior advisor with a unique perspective of the organisation will play an important role in helping an executive to explore and shape the strategy they are defining and highlight whether it will truly create the outcomes they desire. This upfront partnership can save money on the back end of a project, by avoiding costly re-scoping of initiatives.This relationship between senior advisor and executive should therefore begin as early as possible in the process.
2. Coalition Building
Its important to give people multiple opportunities to share concerns, ask questions, and offer ideas and to make following up with answers and updates a top priority. Executives must reach out across their functional work streams to build a large cohesive team to support the project once the correct strategy has been set and the urgency for the project has been established. A good senior advisor will be able to guide an executive though these interactions.
As a senior change management professional, it is important that you help leaders of the organisation craft the correct message. While leaders often know what it is they want and see the urgency for themselves, the outside view that a coach provides can support the development of a team around the initiative and help to navigate the strategic and political interests in linking the change to the interest of multiple team members.
The more people are involved in the process, the fewer will be acting as internal saboteurs.
Communication Is Key to Successful Change Management
3. Communication
Don’t confuse process visioning, planning and endless powerpoint presentations with communication.
Change is uncomfortable, and adapting to change is messy. A Gantt chart can not capture the hard side of change management. Why? Because tasks are easy to list, but behaviour and long-held habits are not easy to change. Gather outside information, solicit perspectives, and adapt the approaches for your organisation and group.
The importance of communication within an organisation around the change cannot be underestimated. Executives often fall short on communication in two main areas, not communicating the right message and not communicating it frequently enough across an organisation. It is often thought that everyone else in the organisation is on board and understands the change, however, the reality for an executive is not the reality for another worker who may have lost a job because of a well intended change initiative. A senior advisor can apply consistent pressure to the leader of the change around the need for communication and its messaging.
Quantity Is Fine, but Quality and Consistency Are Crucial
4. Share Relevant Information Quickly
Most CEOs and managers are quoted as saying, “You can’t communicate too much,” Part of the communication will be the support the urgency in messaging. “My way or the highway” is often used, but is not an effective communication strategy. Senior Advisors can work with executives to tailor their message to each area of the organisation in order to define content that is important to them.
A study by Towers Watson shows that “only two-thirds (68%) of senior managers say they are getting the message about the reasons behind major organisational decisions. Below the senior management level, the message dwindles further to (53%) of middle managers and 40% of first-line supervisors understanding reasons behind major organisational change.
The forwarding and cascading of information does not work as consistent communication around the change will be necessary at all levels of the organisation using a variety of communication pathways and vehicles.As a trusted advisor it is important to encourage executives to lead by example in both their messaging and communication of the change agenda.
Only 25% of Change Management Initiatives Are Successful over the Long Term
Maintaining The Change
Many leaders and managers underestimate the length of time required by a change cycle. It is paramount that as the change effort reaches its completion that leaders of the change recognise that the process does not end there. The role of a Senior Advisor will be to guide them to the idea that work must be undertaken to maintain the change over time. Maintaining change does not mean that an executive must own the initiative forever, just that they take the necessary steps to ensure that change has a lasting impact by integrating the change into the corporate culture and measuring the benefits and highlighting areas for future improvements.
The outside unbiased view is that a Change Management Lead is crucial to the success of a change management program.
This article provides food for thought rather than counsel specifically designed to meet the needs of your organisation or situation. Please use it mindfully.
Throughout the city, there are many green buildings such as the CapitaGreen office tower, the Park Royal on Pickering hotel and the Tree House condo near Bukit Timah Nature Reserve.
The futuristic ‘Gardens by the Bay’ in central Singapore, is a revolutionary botanical garden spanning over 100 hectares of reclaimed land. It’s a beautiful asset to the city but may also offer a path to the health and happiness of its citizens.
Transport is another sector that has seen investment recently. On an island of 4.8 million people with limited space. After a series of smart card innovations, people have been able to use e-Symphony, an IBM-designed payment card that can be used to pay for road tolls, bus travel, taxis, the metro, and even shopping.