The Wyndham Road Project, Southwark

Britain’s first demountable multistorey housing development

A portable, demountable or transportable building is one of the many pre-fabricated house types which can be put to good use when planning constraints will only allow short-term development. Modules and components can be taken apart and transported to a new location. Even elements such as foundations can be easily removed using demountable technologies.  In Australia the word “demountable” in particular refers to portable classrooms.

Prefab Housing Has Been Heralded as the Future of Building and the Solution to Resolve Housing Shortages in the Uk.

The Wyndham Road Project

Client: Hyde Housing Association

Architect: PCKO

Principal Supplier: BUMA

The Wyndham Road project, incorporating 18 flats for key workers, was completed in summer 2005, designed as part of RAPID (Response to Accommodation Pressures through Innovative Design), Hyde’s response to the Government’s initiative to increase the supply of new housing through use of innovative technology.

This Scheme on Wyndham Road, South-east London, Was the Second Buma-built Project in the Uk.

The scheme comprised one and two-bedroom flats, built around three independent staircases, designed to modern, high-quality standards. Demountable construction is designed to accommodate any future changes to the urban fabric, therefore addressing the issue of urban sustainability and required flexibility. Demountability was built in right through to the foundations with the use of screw piles to hold up the structure.

The development could then  be dismantled in 9-10 days and erected on an alternative site, remodelled or recycled, as required. Elevations finished with lightweight metal cladding and insulated render incorporate full-height glazing and feature sliding shutters of galvanised steel and timber, painted in vivid colours, giving the building a unique identity. The building was  designed as 3-storey but could have been  extended to 4-storey by adding additional volumetric components.

Small Projects Often Mean Greater Innovation

Small projects often embody more innovation than larger more costly or high profile ones.

Innovation is a wide concept that includes improvements in processes, products and services. It involves incorporating new ideas which generate changes that help solve the needs of a company and so increase its competitiveness. That’s hardly big news. But what may be surprising to some is that innovation has itself, well, innovated and it isn’t what it used to be.

New materials and energy, design approaches, as well as advances in digital technology and big data, are creating a wave of innovation within the construction industry. These new ideas are increasingly often tested and proven on smaller and agiler projects. Investing time and money is well spent on  these  ideas and technical improvements can then be used on large-scale developments.

Here are  three exciting small projects:

Vanke Pavilion - Milan Expo 2015 / Daniel Libeskind
Vanke Pavilion – Milan Expo 2015 / Daniel Libeskind
Vanke Pavilion - Milan Expo 2015 / Daniel Libeskind
Vanke Pavilion – Milan Expo 2015 / Daniel Libeskind
VANKE PAVILION Milan, Italy
VANKE PAVILION
Milan, Italy

1. Vanke Pavilion – Milan Expo 2015

The  corporate pavilion for Vanke China explores key issues related to the theme of the Expo Milano 2015, “Feeding the Planet, Energy for Life”.

Situated on the southeast edge of the Lake Arena, the 800-square meter pavilion appears to rise from the east, forming a dynamic, vertical landscape.

The original tiling pattern would have resulted in thousands of ceramic tiles of different sizes and shapes. The resulting complexity and lack of repetition could have led to high costs and a longer erection time.

Working with Architects Studio Libeskind, Format Engineers  (Engineering Designers with backgrounds in structural engineering, coding, mathematics, and architecture) changed the pattern from thousands of different tiles to less than a dozen and  simplified the  backing structure generating  huge cost savings. Format Engineers also proposed ‘slicing’ of the building and then fabrication of  the primary structure of steel ribs using  low tech flat steel plate elements.  These were then used in a series of long span portalised frames reminiscent of the ribs and spars in traditional boat building  resulting in a  column-free area for the display of Chinese Cultural Heritage.

The frame was built to a budget and without difficulty ahead of the neighboring Expo buildings.

Building Size
12 meters high
740 mq gross floor area (exhibition, service & VIP levels)
130 mq roof terrace

Architect:  Studio Libeskind

Engineer:  Format Engineers

Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion
Oxford Brookes Rain Pavilion

2.  Oxford Brookes Rain Pavilion

The Rain Pavilion is an urban forest sculpture forming the front entrance to Oxford Brookes University’s Architecture Faculty.

“Rain Pavilion artwork is a sensory experience for the community.”

The complex form required extensive wind modeling and comprehensive structural analysis within a generative 3d model. This was allied with Format Engineers in-house code for the self-organization of voids and their subsequent redistribution.

.At each stage of the design process different modeling and analysis techniques were used to exploit the form and to optimise the structure. The considerable challenges posed by the slenderness of the structure and its dynamic behavior under wind were resolved by combining Computational Fluid Dynamics (CFD)  (a branch of  fluid mechanics  that uses numerical analysis and algorithms to solve and analyze problems that involve  fluid  flows) with a generative design environment. Conceptual design introduced the ideas of tubular stems and folded steel canopies, both of which were  perforated by circular holes arranged to allow the interplay of light and water through the structure. The voids were generated using a self-organizing process.

Grasshopper  (a graphical algorithm computer 3-D modeling tool)  was used  to produce a mesh that could include the voids in both the stems and the petals.

The Rain Pavilion is designed to celebrate the sound of rain, and the noise of water interacting with different sections of the installation is part of the experience of passing through it. The structure has a design life of five years and can  be transported to other locations.

Architect:  Oxford Brookes University, Oxford, UK

Engineer:  Format Engineers

KREOD Pavilion
KREOD Pavilion
KREOD Pavilion
KREOD Pavilion
KREOD Pavilion
KREOD Pavilion

3.  KREOD Pavilion

The KREOD pavilions were first erected on the London Greenwich Olympic site in 2012.  Easily rearranged, three pod-like pavilions were formed with a wooden structural framework comprised of an open hexagonal composition.

Standing three meters tall, each double-curved wooden shell enclosed a footprint of 20 square meters,  totaling 60 square meters. A  waterproof tensile membrane sealed the interior from the elements fully portable with demountable joints,  the individual components can be  stacked for efficient transportation.

Chun Qing Li the architect required a temporary exhibition or function space that could be erected and demounted mostly by hand and by untrained staff. The quality of finish needed to  echo that of handmade furniture and had to be low cost and quick to erect. The continuously changing double curved form of the enclosure meant that in theory, every nodal connection was  different. A conventional bolted solution would have cost hundreds of pounds per fixing. Format Engineers  suggestion of a ‘reciprocal’ jointed timber grid shell required standard  bolts which equated to a fraction of the normal cost. It also allowed the structure to be built from simple and light flat timber elements.

The structure used Kebony timber throughout, a sustainable alternative to tropical hardwood. As this material had not previously been used in a structural context Format Engineers undertook load testing of the material and the connections at the University of Cambridge. The timber was fabricated using CNC routing (a computer controlled cutting machine)  allowing a highly accurate fit between members and basic  erection on site.

Architect:  Chun Qing Li  